My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCMin_85Mar13
FalconHeights
>
City Council
>
City Council Meeting Minutes
>
198x
>
1985
>
CCMin_85Mar13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 4:52:45 PM
Creation date
6/17/2009 2:45:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />REGULAR CITY COUNCIL MEETING <br />MARCH 13, 1985 <br />PAGE 5 <br /> RAY BROWN, <br />Ray Brown, 1844 Tatum, addressed Council requesting advice and input 1844 TATUM <br />regarding the possibility of extending utilities to his lot north of the REQUEST FOR <br />Lindig cul-de-sac, thus making it possible to subdivide the lot for EXTENSION OF <br />construction of two homes. He explained that there will be construction UTILITIES TO <br />in the cul-de-sac this spring for construction of a home at the end of HIS LOT <br />Lindig, and he felt it was an appropriate time to discuss the matter. NORTH OF <br />Engineer Schunicht had reviewed the matter and felt that extension of the water LINDIG CUL- <br />line is no problem, extension of the sewer needs further review, and gave suggestions DE-SAC <br />for extension of the street, i.e. a dual driveway off the cul-de-sac, or e xtension <br />of the street with a short turn-around. Mr. Brown felt the less expensive was <br />a dual driveway, which would suffice. <br />Mayor Eggert moved, seconded by Councilmember Baldwin, that the meeting be MEETING <br />extended until the present discussion is completed. Motion carried EXTENDED <br />unanimously. <br />Engineer Schunicht then addressed the problem of construction on the lots <br />which are partially in the no-build area. He explained that the homes <br />must be constructed with the same requirements as those previously built in <br />the no build area. Councilmember Hard commented on the fact that the <br />City had considered storm sewer in that area, and Engineer Schunicht stated <br />that the plans for storm sewer in the area were prepared previously. Mayor <br />Eggert moved, seconded by Councilmember Hard, that the Engineer be authorized <br />to prepare a feasibility study relating to Mr. Brown's subdivision request. <br />Motion carried unanimously. <br />Mayor Eggert moved, seconded by Councilmember Hard, that a special meeting <br />be scheduled for March 20,.1985 at 7:00 P.M. to allow for completion of <br />existing agenda items. Motion carried unanimously. <br />Mayor Eggert moved, seconded by Councilmember Hard, that the meeting be <br />adjourned at 10:46 P.M. Motion carried unanimously. <br /> <br />C. Eggert, Ml~ Mayor <br />ATTEST: <br />r~,~ <br />~?,~- ;~ ~,~/` ~~ -mot <br />Dewan B. Barnes. Clerk Aclminictratnr <br />Regular City <br />Council Meeting of March 13, 1985 <br />RAY BROWN <br />REQUEST <br />CONTINUED <br />FEASIBILITY <br />STUDY TO <br />BE PREPARED <br />BY ENGINEER <br />SPECIAL <br />MEETING <br />SET FOR <br />3/20/85 <br />ADJOURNMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.