My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCMin_82Mar9_Public_Hearing
FalconHeights
>
City Council
>
City Council Meeting Minutes
>
198x
>
1982
>
CCMin_82Mar9_Public_Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 4:18:09 PM
Creation date
6/18/2009 8:40:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES .~ r/ <br />PUBLIC HEARING 'G <br />MARCH 9, 1982 <br />PAGE 4 <br />Engineer Lemberg explained that Albert has no base under it and it BRAD <br />would be difficult to repair due to alligatoring. He stated that LEMBERG <br />the decision is up to Council. <br />Councilmember Eggert stated that if there are some streets that are COUNCILMEMBE <br />high cost to repair, perhaps, Council should look at those streets EGGERT <br />only. He requested that the Engineer provide information comparing <br />the cost of repairs on an annual basis to complete construction. He <br />also inquired what cost differentials would be involved in doing the <br />project on a one piece basis as opposed to doing all in one project. <br />Councilmember Ciernia asked the Engineer if he could project, on high COUNCILMEMBE <br />cost streets, what it would cost in the future if waiting 2 to 5 years CIERNIA <br />for construction. <br />Engineer Lemberg stated he would check his records to see what has BRAD <br />been spent. He expressed the opinion that construction costs 3 LEMBERG <br />years from now would, probably, go up as they have been experiencing <br />an 8~ increase per year for the past 8 to 10 years. <br />Engineer Cook informed that bids in 1981 were approximately the same GLENN COOK <br />as in 1982 and sometime in the future it will catch up. <br />Engineer Lemberg stated that they have been experiencing good bids BRAD LEMBERG <br />due to the fact that contractors are in need of work. <br />Councilmember Chestovich moved, seconded by Councilmember Larson, CHESTOVICH <br />that the subject be tabled to a later date for future discussion MOTION TO <br />by Council. Following a short discussion the motion was withdrawn. TABLE WITH- <br />DRAWN <br />Mayor•Warkentien closed the Public Hearing at 8:43 p.m. MEETING <br />CLOSED AT <br />8:43 P.M. <br />~~~ <br />Willis C. A. Warkentien, Mayor <br />Att ,t: <br />~ -~/ <br />Dewan B. Barnes, Clerk Administrator <br />Public Hearing on Street Improvement Project No. 4449, March 9, 1982 <br />
The URL can be used to link to this page
Your browser does not support the video tag.