Laserfiche WebLink
,~ ~ ,~, <br />Swimming Pool Al Troyer, Custom Pools, was present to request that council <br />1436 West grant permission to him to start construction of swimming pool <br />Larpenteur: at 1436 West Larpenteur without a building permit inasmuch as <br />building inspector is out of town and he cannot obtain a permit. <br />Black moved, seconded by Stone that building permit be <br />granted to Al Troyer of Custom Pools to build swimming pool <br />at 1436 W . Larpenteur. The bond in amount of $4 , 500 <br />showing completion date of December 1, 1968 (which <br />completion date includes fence) has been received, and <br />is on file in the office of the village clerk. Variance has ~ <br />been approved regarding side lot lines. Council hereby <br />grants permission to start construction. Ayes: All, Nays: <br />None. Motion was carried. <br />Master Gas Installer Having met the requirements, it was moved by Stone, seconded <br />License: by Ecklund that Advanced Heating and Air Conditioning Co. <br />(Donald C. Hodsdon) be granted Master Gas Installer's <br />License. Ayes: All. Nays: None. Motion was carried. <br />Plumber Authorized Having met the requirements, Ecklund moved, seconded <br />to work in Village: by Stone that T.J. Reilly, 600 North Dale Street, St. Paul <br />be authorized to do plumbing work in the Village of <br />Falcon Heights. Ayes: All. Nays: None. Motion was <br />carried. <br />Hamline Avenue The Hearing on Hamline Avenue Watermain Reconstruction <br />Watermain had been continued until this evening and Mayor Warkentien <br />Reconstruction called same to order at 8:00 P. M. <br />Hearing Continued: Mr. Rustad, 1723 Hamline Ave.: Last week I had question <br />of costs. It is generally felt that the work should be done <br />and I think that we are ready to go on it. We will pass <br />this with the understanding that we get the work done with <br />the best possible bid on the thing. There has been some <br />question with the St. Paul Water Department and the work <br />I have been told can be done cheaper by them. <br />Engineer Lemberg then read letter from Mr. Hamblin dated <br />January 18, 1968, and stated he did not include costs of <br />making connections or replacing the street or boulevards <br />or wherever the main happens to be. He said that today if <br />we wanted to work it another way and could get 100% signers <br />from people involved, they could put main in and not be assessed <br />and the eleven property owners could be assessed on the <br />costs, however, the village would have to pay for the streets. <br />Rustad: He made rough estimate of $8 a running foot and we are <br />talking about $13.34. He has agreed to do it at Water <br />Department cost. Your opinion is that $8 is not ample? <br />Lemberg: Our cost is based on what it would cost village to do it. <br />If we get it done we would recommend that it be done the <br />least expensive way. Our estimates are based on previous <br />jobs that we have done. <br />Rustad asked if it wasn't right that we could get estimate <br />on just exactly what we want done and Brad Lemberg answered <br />