Laserfiche WebLink
191~lt <br />The Deputy Clerk was instructed to make a list of thew <br />names and addresses and mail to each one, with a copy <br />to the League of Women Voters, and advise each one that <br />when report is completed, they will receive a copy of same <br />and a meeting will be called. <br />Widening of Roselaem Letter from County Engineer advising that the plans are to <br />Avenues reconstruct this road in about eight years to a 4!t foot <br />width which would be two 12 foot lanes and two 10 foot <br />parking lanes. It is necessary that all storm sewer work <br />be accomplished prior to reconstruction of Roselawn Avenue. <br />Hearing on Proposed <br />Improvement of the West <br />side of North Snelling <br />Ave. by Installation of <br />a Sanitary Sewer System: <br />At 8:00 P.M. the regular meeting was recessed and Mayor <br />Nilsen opened the Hearing. In the absence of the Clerk, <br />the Mayor read the Notice of Hearing, and announced it <br />was published in the Suburban Life Newspaper on June 12 <br />and June 19 and that mailed notice had been given as <br />required by law. Informal hearing had been held on <br />June 3, 19b3. <br />The opening statement as to the need for the installation <br />of sanitary severer system was made by the Mayor. Engineer <br />Lemberg explained the details as to method and cost. <br />Art Granna Has this improvement been approved by the engineers who <br />1592 W. Roselawn: make up the Highway plan on Roselavm, or if this goes <br />through, will it have to be moved at a later date? <br />Lemberg: We have not been advised of the plans of the Highway <br />Department, however, this shouldn~t have to be re-located, <br />I can see no reason that it would have to be moved. <br />Nilsen: Is it not true that if this pro3ect is approved, it will <br />have to get the permission of the Highway Department and <br />they will have to approve, and if there are any plans, <br />they will bring them to the attention of the engineer? <br />Lemberg: Yes. <br /> Granna: Would it not be more economical to put both water and <br /> Sewer at the same time? <br /> Lemberg: That is why we are considering both of them at the same <br /> time. The water and sewer cannot be put in the same part; <br /> the trenches have to be ten feet apart. They would have to <br /> dig two trenches, Resurfacing is included in the cost, <br /> resurfacing driveways, etc. are included. <br /> Strandquist: You said they have to be ten feet apart -what would you <br />do? Come into the property? <br /> Lemberg: One would be on the shoulder and one close to the property <br /> line. Property line nvw has a twenty foot ditch in there. <br /> They will stay as close to the street as they can. <br />