My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCMin_64Sep23
FalconHeights
>
City Council
>
City Council Meeting Minutes
>
196x
>
1964
>
CCMin_64Sep23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 8:35:43 AM
Creation date
6/22/2009 11:53:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2156 <br />Frank Skogs Vuhat is the ~~0 assessment to the idaple Knoll Area? <br />1607 Maple Knoll <br />Nilsen: Oversizing cost. At the time the connection was made in <br />1960 when there eras a problem in connection with the <br />pressure. The cost to oversize the lines was deferred <br />until actual connection of water is made to the house. <br />Otto: In computing, was the x$60 subtracted from the total cost? <br />Nilsen: No. This is in connection tivith the cost of the ~Yater Main <br />that was laid on Larpenteur in 1960. The people along <br />Larpenteur Avenue v~rere assessed on the basis of a 6" water <br />main, but all the people west of Snelling Avenue have to <br />absorb the additional cost. It was paid for by the Village <br />but it was spread over all the properties - on the pnobabi- <br />lity of all areas, the areas not ,yet developed. The X60 <br />charge is being made as each home is hooked on to the system. <br />That X60 was not computed, but is completely separate, <br />Lindig: We pay for a pumping station now. <br />Nilsens The listing on the real estate tax form is nomenclature. <br />Galvin: In addition to the real property taxes, on the statement <br />from the auditor's off ice, one of those assessments is <br />called Larpenteur Avenue Waterl~ain and Pumping Station, <br />bedause when originally proposed, it was proposed to put <br />in a pumping station. However, in the course of thepro~ect, <br />that was found to be impractical. The name of the improve- <br />ment was not changed and. remained as above, and the bond <br />issue was called that also. The name has never changed <br />even though no pumping station was ever built. <br />Nilsens We tried to get connection at Cleveland and Dudley, but St. <br />Paul would not allow it then. Tyro series of bonds - <br />Series A and Series B were contemplated. Series A were <br />issued only - not Series B for the Pumping Station. Series <br />A was for the Larpenteur Avenue tiYaterMain, and Series B <br />would have been for the Pumping Station. We never borrowed <br />any money for Series B. <br />The original proposal was that the people only on the west <br />side of Snelling should be assessed for that -that is the <br />connection charge. Had the city of St. Paul gone a1 ong <br />with some of our proposals, we would not have had these <br />other problems. <br />How is the water pressure? (Several answered 'very good.') <br />We got a better price on sewer and water than we did a <br />fevr years ago tikrhen sewer was„8.96 afoot and water north <br />of Ruggles on Pascal Avenue and around there was $7.25 a <br />foot in 1960. <br />Al Struck There is a hole in front of my driveway still - in the street <br />1806 Tatum: <br />It will be taken care of. <br />Nilsen: Is there anyone else wishing to be heard? (There was none.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.