Laserfiche WebLink
1 <br />1 <br />1 <br />REGULAR MEETING OF JUNE 8, 1966 <br />The meeting was called to order at 7s00 P.M. with the following presents <br />Mayor Nilsen, Clerk Strandquist, Councilmen Warkentien, Black and Stone. <br />Also present were Engineer Lemberg, Attorney Galvin and Treasurer Olsen. <br />2~ 7b <br />Minutess Stone moved, seconded by Strandquist that minutes of the <br />regular meeting of May 25, 19b6 be approved. Motion carried. <br />Hearing of June Upon request of Attorney Jerome W. Beardsley, attorney for <br />22nd Continued - the petitioners for the vacation of walkway between Pascal <br />Vacation of and Holton at Ruggles, the council agreed to continue said <br />Walkways hearing from June 22nd to July bth. Beardsley stated he <br />will be out of town on the earlier date. <br />Correspondence: Letter from Carl Bucher, Ramsey County Weed Inspector, <br />Weeds to be cut advised that weeds must be eut'by July 1, 1966. <br />by July 1, 1966: <br />Copy of letter of Jun® 7, written to St. Paul Water <br />St. Paul Water Department signed by Engineer Lemberg, stated that offsets <br />Department - found necessary during construction of Storm Sewer Pro3eet <br />N.E,Area Storm 66-1, are authorized and cost of same should be billed to <br />Sewer Project: the Village of Falcon Heights. <br />Capitol City ~ Letter dated May 27 from Vincent Schadegg, insurance agent, <br />Mutual Aid Agree- addressed to Attorney Galvin was reviewed. Saone was in <br />ment -Insurance answer to inquiry regarding insurance premiums and the <br />Premiums Capitol City Mutual Aid Association Agreement. <br />HEA~TNGs <br />Improvement on At 8:00 P.M., Mayor Nilsen opened the Public Hearing for the <br />Albert Street Proposed Albert-Larpenteur Improvement. Clerk Strandquist <br />North of Larpenteur read the official notice of hearing. There were approx- <br />Avenue: imately twenty people present. Engineer Lemberg gave report <br />as to what is to be accomplished on this proposed project. <br />R. D. 1Rhaley That water has been hitting me for a long time. Ts this all <br />170l~ Alberts they are going to do? We .had good drainage before the sewer <br />was put in. I was assured then that they would go back to <br />the elevation of the street, but instead, they raised it <br />about eight inches. I have taken the entrance to mgr drive- <br />way and diked it. If you put this in, in this way, how do <br />you intend to drain it? I am definitely against this. <br />Harry Bruncke My driveway is about at the point where the sewer clean out <br />1710 Alberts was, and when the sewer was put in, the cover for that <br />manhole was put down about six inches from where the original <br />grade was and then they raised the road six inches and my <br />driveway was about the same as Mr. Whaley's. The water <br />gets into the driveway and there is no way for it to get out. <br />We had very good drainage until they built Larpenteur. That <br />upset the apple cart. The catch basin doesn't do the fob it <br />should. A11 these factors have contributed to this water <br />problem. About the sixty fast - it looks to us that it <br />should go back 160 feet. <br />Lembergs The reason for sixty feet - that is far enough from the <br />intersection so we can reshape the gutters to carry the <br />water into these lower places. <br />