Laserfiche WebLink
lt~t~8 <br />R. Keyes These boundary lines are. then set as of the moment? `then, <br />1725 Arona if a policy decision is made to define the cost of any <br />surface water removal, the rate is set? In the future, <br />we will not be assessed for the cost of draining any o+.,her <br />district? 'basically, I think the Council is faced with a <br />policy decision, namely, are you Being to do something about <br />an alleged problem or not? You have heard a lot of testimony <br />from people here and from the engineer so it is up to you to <br />make some decision on it. °1r. Spahn, I thinks is on the <br />right track. '='.Te know that long-range planning is on. V, e are <br />talking simply about removal of surface water. One way is by <br />storm sewer and the other is by run-off. One is a ditch and <br />the other is curbing at the edges of the street. I think <br />you have to go back to the engineer and the council and decide <br />on the basis of footage. You will have to tiveigh in terms of <br />this and in several districts, and it does involve money. <br />You have got the problem, take the evidence and go back and <br />make a. decision about this thing. Only the. engineer can <br />settle these problems about what is best and. most practical. <br />Schmidt Does the alternative plan involve putting in curbs? <br />Bonestroo No, there would. have to be a petition along Arona for this, <br />Nilsen V~hat is the plan along the boulevard section? <br />Bonestroo It will remain the same as it is now. <br />Nilsen ate have tried to get the ideas of people who have raised <br />their hands. Is there anyone else wishing to be heard? <br />Peterson ~P~ill a catch basin be the answer? He is the first engineer that <br />h:as` admitted that Larpenteur is higher than Crawford. <br />Nilsen '~V`e have to work this out. The alternate elan is entirely new <br /> to the Council. a";e asked Bonestroo to come in with a permanent, <br /> sensible plan. I realize you want the Council to proceed and <br /> that you want something that is not going to have to be done <br /> over and. over again. As far as I could observe, it is largely <br /> a drainage problem. It looks like it might be somewhere <br /> around the 75q property owner, Village 25% basis. <br />tiaarkentien I move that we continue this hearing to June ?_lst at 7:00 P. ':~'. <br />Resolution ~~otion seconded by Utecht and carried. <br />Atty. Friel The fact that the street is being reconstructed is incidental to <br /> the drainage problem. For that reason, I cannot see from any <br /> standpoint, that there is any basis for separating this into <br /> drainage on hand hand and street on the other. <br />Rezoning Lee- <br />Schmelz Bros. John Yngve, tittorney, reviewed Sch~aelz brothers' re~uest for <br />rezonin <br />of the Lee P <br />d <br />t <br />d <br /> g <br />roper <br />y an <br />requFste <br />a decision. <br />