My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCMin_60Jun15_Special
FalconHeights
>
City Council
>
City Council Meeting Minutes
>
196x
>
1960
>
CCMin_60Jun15_Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2009 4:35:13 PM
Creation date
6/22/2009 4:59:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1439 <br />One, consi~era~ole :_±-~;rm sewer; .and the o+.har, very lit±,le storm <br />sewer out cons i~er~=ble grading. ';"e ~•ave tour streets involved - <br />!~rona, Simpson, Asbury and Crawford. <br />The project consisting mainly of storm sewers will cost approx- <br />imately X14,000.00. There are anproximat:ely 36,800 square feet <br />in this area. It ~~~~ould cost about 1-1~4¢ per square foot, or <br />~~12~.00 per average lot of about 60 x 124'. <br />'~~e realize it is p>ssible and very feasible to make some grade <br />changes and put in a very minimum amount of storm sewer. In <br />view of the fact that most of the streets are quite poor, vre <br />have made some minor improvements and have been able to drain <br />the vrater out of some sections. ~;'ith the re-grading, vre vrere <br />able to reduce the cost to about ~10,1G00,00, I might say that <br />these estimates are conservative a.nd that for the same squire <br />foot area, the assessment on this second plan would. be about X93.00. <br />'~e feel that the second clan, being cheaper, does more good in <br />that vre are able to r.ebair these streets and accomplish the <br />same result as with the costlier plan. In connection tivith project <br />No. 1, we would have to do considerable sodding on the boulevards. <br />ti~','hereas with plan No. 2, it would be a utter of adjusting drive- <br />ways to meet vrith the streets. <br />rlilsen Vie asked ',Ir. 3onestroo to explore all possibilities and. he has <br />come up with the ttivo proposals as outlinod. Are there any eues- <br />tions. <br />Shavor Under proposal 2, would the s+:orm sewer go only as far as the alley? <br />Bonestroo Yes. <br />Shavor Is th¢ difference in cost because of the regrading; of the streets? <br />Bonestroo Yes. ?;~e would su bcut the streets to our r.evr design, grade and <br /> then rbnlace the subcut with a good base and. sealcoat, using <br /> No. 2 ~~ggregate. The intersection at Simpson and Crawford would <br /> be droned about 3". <br />Shavor tr~,re have had Simpson. regraded four times in the vast four years. <br />The curia is now buried through regrading. <br />N. Spahn. 4fthat is ~ conservative estimate? <br />Bonestroo d'r'e i~.ave used high Writes in estimat,irg. If we can combine this <br />with some other work, vre could get better prices. <br />Spahn This thi~:was under consideration two years ago and at that time <br />the cost irras estimated at X18,000.00. <br />Bonestroo 1't~e have reduced the pipe sizes. 24" to 18", 18" to 12", etc, <br />The -rime purpose of the storm sewer would be the removal of the <br />water ir,~stantly or in 10 or 15 minutes. 'i e reduced. the size of <br />these lines so there would be a minimum of water standing for a <br />short while. <br />
The URL can be used to link to this page
Your browser does not support the video tag.