My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCMin_60Jun21_Special
FalconHeights
>
City Council
>
City Council Meeting Minutes
>
196x
>
1960
>
CCMin_60Jun21_Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2009 4:36:12 PM
Creation date
6/23/2009 8:06:44 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1l~58 <br />put a 2!~" line on Larpenteur going south into the Snelling <br />system. <br />Bonestroo St. Paul is going to be inv,~,sti .^~at,ing this soon. <br />Shavor Don't you think St. Paul's program could be completed before <br />we have very many connections out here? <br />Bonestroo Ve feel this is not a normal pressure but in talking to the <br />St. Paul Engineers, they feel it is go~i.ng to get better. I <br />don't know exactly what they are going to do. They are of the <br />opinion that the work they did the last two years should have <br />helped considerably. I know they are making an investigation. <br />I would like to check to see if all the gate valves are open. <br />The way St. Paul talks, pressures should have come up 10# which <br />is a tremendous increase. <br />Libby There should be something to substantiate this, <br />Bonestroo Vv`hat vre are doing is the way it should be done, The problem is <br />not here. It is somewhere else. <br />Libby There's not much sense in putting in additional lines if we <br />don't have sufficient pressure. There's no sense in buying a <br />horse if you haven't got oats to feed it. <br />Nilsen St. Paul feels they will equip themselves to take care of all , <br />of Ramsey County, and it is only right that the water should <br />come from the Central Cities. I think they ''re ~~reparing them- <br />selves, looking into the future, and we think the fact that <br />they are granting permission to extend the lines indicates that <br />they feel they will be able to serve them properly. <br />Sx~aulding ~~?y pump went out about three years ago. I investigated running <br />the service up to serve my property and was advised the main to <br />serve that would cos+ about ?500.00. I talked to the wa±,er de- <br />partment. They were avrare of the -pressure roblem and they <br />said they didn't think it was practical, the pressure was only <br />about 20f# per square inch on Ruggles. <br />Bonestroo They say it is well up around 30j# now. <br />Spaulding What is the size running up each street. <br />Bonestroo 8" up Snelling and 6" on the others. "iirro 6" loops are equivalent <br />to an 8" line. <br />Spaulding You speak about looping, ii,here? <br />Bonestroo Along Roselawn. <br />Spaulding St. Paul suggested a water tank. I think vre should get all the <br />costs before we go into this matter, <br />3onestroo There was no discussion of a tank Rast of Snelling. There was <br />some discussion of a tank V~test of Snelling. They have a i. aster <br />Study. I don't knotiar just hovti~ they plan to carry it out. As <br />each loop is brought around, you are getting pressure correction. <br />You don't do this all at one time because you can't afford it. <br />
The URL can be used to link to this page
Your browser does not support the video tag.