Laserfiche WebLink
2. Ownership of all parcels. <br />3. Platting and easements. <br />4. Street and railroad rights-of-way. <br />5. Buildings. <br />6. Utility lines and facilities. <br />e. A topographic map prepared by a registered civil engineer or registered land <br />surveyor covering the entire tract proposed for development which contains the <br />following information: <br />1. Contour lines at no more than foot intervals. <br />2. Hydrologic information including drainage patterns, wetlands, and land <br />subject to periodic flooding. <br />3. Soil and subsoil conditions. <br />4. Vegetation including classification of tree cover by species. <br />f. Any other material requested by the city council, planning commission or city staff. <br />(Code 1993, § 9-16.05) <br />Sec. 113-204 - Coordination with subdivision approval <br />If development of the PUD requires subdivision approval, the PUD and subdivision shall be <br />processed concurrently. <br /> <br />(Code 1993, § 9-16.06) <br /> <br />Sec. 113-205 - Development contract <br />The city and the developer shall enter into a development contract setting forth any <br />improvements required to be undertaken by the developer. This contract may be combined with <br />the development contract required for subdivision approval. <br /> <br />(Code 1993, § 9-16.07) <br /> <br />Sec. 113-206 - Rezoning <br />If approved by the city council, the property shall be rezoned PUD in accordance with the <br />terms of approval. If a concurrent plat application is being processed, PUD rezoning shall be <br />concurrent with final plat approval. <br /> <br />(Code 1993, § 9-16.08) <br /> <br />Sec. 113-207 - Control of planned unit development following completion <br />(a) Modification of structures. After the certificate of occupancy has been issued, the use of <br />the land and the construction, modification or alteration of any buildings or structures within