Laserfiche WebLink
.~.~. <br />.1' <br />Fire hose Bids for fire hose were considered. A bid delivered at <br />.bids. 8:15 pm., which the bidder had phoned earlier mould be <br />delayed, was presented with other unopened bids. Lindig <br />moved that the delayed bid be accepted and opened with <br />other bids. Seconded by Stewart and carried. <br />Bidders - The bids were then opened as follows: <br />Hewitt Rubber Division <br />700 ft. 1~" Buffalo d.3. 7bcl per ft. <br />1,500 ft. 2~" " " 1.215¢ " " <br />700 ft. 1~" Mutual " 90¢ " " <br />1,500 ft. 2~" " " 1.278 " " <br />Certified check for $150.00 <br />B.F. Goodrich Co. <br />1500 ft. 2 " Falcon d.3. X1.24 per ft. <br />1500 ft. " Deluge d.3. 1.30 " " <br />700 ft. 1 " Falcon d.3. .79 " " <br />700 ft. 1~" Deluge d.3. .85 " " <br />Certified check for $200.00 <br />Eureka Fire Hose Division <br />1500 ft. 2 " Eureka Southland d.~. X1.27 per ft. <br />700 ft. 1 " n " " .89 n n <br />Certified check for 1127.00 <br />J.N. Johnson, Ino. <br />1,500 ft. 21M Municipal d.~. <br />~" " " X1.19 per ft. <br />" " <br />700 ft. 1 .86 <br />Certified check for X119.35 <br />Minnesota Fire Equipment Co. <br />1,500 ft. 2~" Reliance d.3. $1.21 per ft. <br />700 ft. 1~" " " .89 " " <br />Certified check for X125.00 <br />Weber & Troseth Co. <br />1,500 ft. 2'~".Inner Flex d.~. X1.40 per ft. <br /> 700 ft. 1~" " " " .95 " " <br /> 1,500 ft. 1p Paramount d.3. X1.18 " " <br /> 700 ft. 1" " " .83 " " <br /> Certified check Por $138.26 <br /> Kelley Sales Co. <br /> ~" <br />1,500 ft.1~i-lateral Red Star d.~. <br />X1.4641 per ft. <br /> 1,500 ft."A Durobuilt d.~. 1.2524 " " <br /> 700 ft.l;." " " " .9525 " " <br /> 1,500 ft.~%" " Durolite " <br />~ 1.1917 " " <br /> 700 ft .~ <br />~' " " " <br />r <br />Certified check for X162.30 .8643 " " <br />Anderson & Swanson The council asked Harry Anderson and G eorge Swanson to con- <br />to consider bids, sider the bids and to report back with their recommendations. <br />