Laserfiche WebLink
<br />CITY OF FALCON HEIGHTS, MINNESOTA <br />CURTISS FIELD PARK POND 811550) <br />CHANGE ORDER No. 2 <br /> <br /> SCHEDULE 8.0 ADDITIONAL WORK COMPLETED (CHANGE ORDER N0 .2) <br />86 IDAHO CATCH BASIN MODIFICATIONS LS 1 $1,358.52 <br />87 REMOVE 320 LF OF 1.5" INTERDUCT LS 1 $141.70 <br />88 INSTALATION OF 2" FOUNTAIN DRAIN LS 1 $64.42 <br />89 INSTALATION OF 4" DRAINTILE FOR TOT LOTT LS 1 $93.47 <br />90 MANHOLE MODIFICATION LS 1 .$185.92 <br />SCHEDULE 8.0 ADDITIONAL WORK COMPLETED TOTAL $1,844.03 <br />• <br />o:\proj\811550)\Partiat Pay Estimates\C03,xls PAGE 1 ~~ <br />