My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCAgenda_04Jul7_wksp
FalconHeights
>
City Council
>
City Council Agenda Packets
>
200x
>
2004
>
CCAgenda_04Jul7_wksp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 2:31:12 PM
Creation date
6/24/2009 4:45:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Park/Public Works Equipment: <br />Staff recommends the replacement of the 1-Ton pickup truck, on the regular 7-year schedule of <br />replacement for vehicles. This is aplace-holder at $30,000. <br />Infrastructure Capital Improvements <br />Sidewalks: <br />No change. <br />Curbs: <br />No change. <br />Corner Markers/Street Signs: <br />This would cover the replacement of every street sign/corner marker in the city. These would be high- <br />visibility 4-foot long blades with the city logo. Staff is investigating color options, but the council may <br />wish to consider differentiating between Roseville and St. Paul by choosing a color other than green for <br />the signs. This project is recommended by the Fire Department, as the old signs have lost their <br />reflectivity, and are no longer visible at night. In addition, they are recommending that the new signs <br />include the high and low street number on each sign to better aid firefighters in fmding addresses. This <br />upgrade will also make it easier for mutual-aid departments from other cities to fmd addresses. <br />Hamline Avenue: <br />We anticipate reconstructing Hamline Avenue as part of the 2005 RSVP (Residential Street Vitality <br />Program) through St. Paul. The estimated cost for this project is $137,000. The entire cost will be <br />covered by MSA funds ($49,500) and Ramsey County turnback funds ($87,500), which are listed as a <br />revenue offset on the CIP Fund for Infrastructure. There is a chance that this project will be done in 2006, <br />depending on scope of work, and the speed with which the contractor can complete the improvements <br />down-stream in St. Paul's storm sewer system. If that happens, we will carry it over to 2006. <br />Roselawn Avenue: <br />We are estimating a $500,000 cost for the reconstruction of Roselawn Avenue. This project can be <br />covered by the MSA Fund ($506,000). Staff is currently in discussions with Roseville about this project, <br />and anticipates that it will occur in 2006. That date could change, depending on Roseville's schedule of <br />projects. <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.