Laserfiche WebLink
,~~ <br />u <br />FROM: June 17, 2004 <br />T0: Juty 9, 2004 <br />CONTRACTOR: JAY EROS INC <br />ADDRESS: P.O. Box 624, 921 B Lake Drive NE, Forest Lake, MN 55025 <br />OWNER: CITY OF FALCON HEIGHTS, MINNESOTA <br />PROJECT: CURTISS FIELD PARK POND 811550) <br />/ ,I <br />J <br /> <br />COMPLETION DATE <br />ORIGINAL: August 16, 2004 <br />REVISED: <br />.... <br />~::::~0$kTRA • <br />G71:. <br />:EpE::'f1118:FER;Qq.;;:;:1 E :;:::::;TS)Ti4~RJd RATE:::::: <br />:~M:;:..,. ,. T ::::::::::::::::::::::E:E:::::::E:::::::::::5:;:;::::::::::::::::::;:::::::::::::::::::::::.:.:.:~::::::::::::::::::::::::::::::::~::::::::E:::::;:;:;:;: ::: <br />.....Ng+.•.....•.•.•.~.•.•:~::.:.•.•.~...•:RLSCRIPTIOb1.•.•.~.•.•.• ..:.:.:.:.:.:.:.:.:::•:.• <br />....13NIi::~•:~::::;:;; ..~ •::::;:;:.:•:~: <br />...~. <br />•.•.•.tiAi .::p:;:: i <br />T~~. <br />. IT. <br />. ~~i~ill#)t~~~'~~'~~'~ <br />...IiNEQU3!;: ;Gt11:~E;ED1AUCl3E1~E <br />:::::R~ ;.. ;:. <br />CE.•:~~:~~ :~ <br />rANnaL rAnaeNr esnNw7e <br />NO. J <br />AMOUNT OF CONTRACT <br />ORIGINAL: $323,702.71 <br />REVISED: <br /> SCHEDULE 1.0 REMOVALS <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 2021.501 <br />2101.501 <br />2101.502 <br />2101.506 <br />2101.507 <br />2104.501 <br />2104.501 <br />2104.501 <br />2104.501 <br />2104.501 <br />2104.501 <br />2704.505 <br />2104.505 <br />2104.509 <br />2104.509 <br />2104.509 <br />2104.511 <br />2104.523 <br />2104.523 <br />2104.601 <br />2104.603 <br />2232.501 MOBILIZATION <br />CLEARING TREE > 4"DIAMETER <br />CLEARING TREE > 4" DIAMETER <br />GRUBBING TREE > 4"DIAMETER <br />GRUBBING TREE > 4"DIAMETER <br />REMOVE CONCRETE CURB AND GUTTER <br />REMOVE 12" CMP <br />REMOVE 15" CMP <br />REMOVE 24"CMP <br />REMOVE 36" RCP <br />REMOVE CHAIN LINK FENCE <br />REMOVE CONCRETE PAVEMENT and SIDEWALK <br />REMOVE BITUMINOUS PAVEMENT (FULL DEPTH) <br />REMOVE CONCRETE DRAINAGE STRUCTURE <br />REMOVE BENCH <br />REMOVE BASKETBALL HOOP <br />SAWING CONCRETE PAVEMENT <br />SALVAGE SIGN <br />SALVAGE 36" RC FLARED END SECTION <br />HAUL SALVAGED MATERIAL <br />ABANDON 12" CMP <br />MILLING ASPHALT PAVEMENT LS <br />ACRE <br />TREE <br />ACRE <br />TREE <br />LF <br />LF <br />LF <br />LF <br />LF <br />LF <br />SY <br />SY <br />EA <br />EA <br />EA <br />LF <br />EA <br />EA <br />LS <br />LF <br />SY 1 <br />0.5 <br />11 <br />0.5 <br />11 <br />296 <br />85 <br />135 <br />245 <br />24 <br />1355 <br />430 <br />2265 <br />6 <br />3 <br />1 <br />42 <br />7 <br />1 <br />1 <br />43 <br />181 7,000.00 <br />1,000.00 <br />150.00 <br />1,000.00 <br />100.00 <br />2.50 <br />6.00 <br />6.00 <br />7.00 <br />8.00 <br />3.00 <br />1.00 <br />O.BD <br />200.00 <br />35.00 <br />80.00 <br />4.00 <br />60.00 <br />250.00 <br />200.00 <br />7.00 <br />S.DD 0 <br />D <br />0 <br />0 <br />18 <br />145 <br />D <br />0 <br />D <br />0 <br />D <br />0 <br />600 <br />D <br />0 <br />0 <br />48 <br />0 <br />1 <br />0 <br />D <br />0 0.00 <br />O.OD <br />0.00 <br />0.00 <br />1,800.00 <br />362.50 <br />0.00 <br />0.00 <br />O.OD <br />0.00 <br />0.00 <br />0.00 <br />480.00 <br />0.00 <br />O.DO <br />0.00 <br />192.00 <br />D.OD <br />250.00 <br />0.00 <br />0.00 <br />O.DO 0.5 <br />0.5 <br />6 <br />0.5 <br />24 <br />235 <br />123 <br />123 <br />139 <br />0 <br />1314 <br />339 <br />2528 <br />6 <br />3 <br />1 <br />48 <br />7 <br />1 <br />1 <br />D <br />0 3,500.00 <br />500.00 <br />900.00 <br />500.00 <br />2,400.00 <br />587.50 <br />738.00 <br />738.00 <br />973.00 <br />O.OD <br />3,942.00 <br />339.00 <br />2,022.40 <br />1,200.00 <br />105.00 <br />80.1)0 <br />192.00 <br />440.00 <br />250.00 <br />2pp,00 <br />0.00 <br />0.00 <br />T SCHEDULE 1.0 REMOVALS TOTALS 3,084.50 19,586.90 <br /> SCHEDULE 2.0 STORM SEWER <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 2501.515 <br />2501.515 <br />2501.602 <br />2501.602 <br />2501.602 <br />2503.541 <br />2503.541 <br />2503.541 <br />2503.541 <br />2503.602 <br />2506,502 <br />2506.502 <br />2506.602 15" RC PIPE APRON <br />30" RC PIPE APRON <br />15"TRASH GUARD <br />30" TRASH GUARD <br />TRASH GUARD FOR 36" SALVAGED FES <br />15" RC PIPE SEWER DESIGN 3006 CL V <br />24" RC PIPE SEWER DESIGN 3006 CL III <br />27" RC PIPE SEWER DESIGN 3006 CL III <br />30" RC PIPE SEWER DESIGN 3006 CL III <br />CONNECT TO EXISTING STORM SEWER <br />CONSTRUCT DRAINAGE STRUCTURE DES 4B" <br />CONSTRUCT DRAINAGE STRUCTURE DES 27" <br />ADJUST FRAME RING AND CASTING EA <br />EA <br />EA <br />EA <br />EA <br />LF <br />LF <br />LF <br />LF <br />EA <br />EA <br />EA <br />EA 2 <br />1 <br />2 <br />1 <br />1 <br />220 <br />139 <br />30 <br />106 <br />1 <br />4 <br />2 <br />3 325.00 <br />490.00 <br />300.00 <br />702.00 <br />865.00 <br />24.00 <br />33.00 <br />43.00 <br />62.00 <br />250.00 <br />1,250.00 <br />650.00 <br />200.00 2 <br />1 <br />2 <br />2 <br />0 <br />78 <br />D <br />D <br />0 <br />D <br />D <br />1 <br />D 650.00 <br />490.00 <br />600.00 <br />1,404.00 <br />0.00 <br />1,872.00 <br />O.DO <br />D.DO <br />0.00 <br />0.00 <br />0.00 <br />650.00 <br />O.OD 2 <br />2 <br />2 <br />2 <br />0 <br />209 <br />139 <br />27 <br />106 <br />~ <br />4 <br />2 <br />0 650.00 <br />980.00 <br />600.00 <br />1,404.00 <br />0.00 <br />5,016.00 <br />4,587.00 <br />1,161.00 <br />6,572.00 <br />250.00 <br />5,000.00 <br />1,300.00 <br />0.00 <br />o:lproJ1811550J1Parlial Pay Es6mateslPayest-070804-il3xls <br />PAGE1 <br />IS <br />