My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCAgenda_04Apr28
FalconHeights
>
City Council
>
City Council Agenda Packets
>
200x
>
2004
>
CCAgenda_04Apr28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 2:02:42 PM
Creation date
6/25/2009 3:29:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Roselawn Avenue <br />o ~/2 mile section of two-lane <br />bituminous roadway, rural section <br />between Snelling and Hamline <br />o Needs full reconstruction, curb and <br />gutter, and drainage upgrades <br />o Project timeline: 2006 <br />o Cost estimate: $500,000 <br />o Project to be jointly undertaken <br />with Roseville <br /> <br />Complaints received <br />o Side yards along Roselawn are <br />routinely flooded during heavy <br />storms due to lack of curb and <br />gutter <br />o Several residents have told city <br />staff that their garages are being <br />flooded. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.