Laserfiche WebLink
<br /> <br />:j:''~ <br /> <br /> <br /> <br />7EM: <br /> <br /> <br /> <br /> <br /> <br />:::IGIii <br />iVO. . ... <br /> <br /> <br /> <br /> <br /> <br /> <br />.. . . . . . ................ ~DEBCRIpTiO ............................ <br />N ............................ <br /> <br /> <br />: <br /> <br /> <br /> <br />...... <br />.......UtY#t:: ~.... . <br />I <br /> <br />:C:EiNTRAC.. TE <br />NES <br /> <br /> <br /> <br />::::::::::Q"IY:::::::::::: <br /> <br /> <br />~ <br /> <br /> <br /> <br />::::::::::::: <br /> <br /> <br /> <br />UNIT::::::: <br /> <br /> <br />PR..E <br /> <br /> <br /> <br />: <br />7#IISE!ERIbEi:::::: <br /> <br /> <br />::: QtY ~::;::::.. .. . <br />.. ~AMOUNt:E <br /> <br /> <br /> <br /> <br />:;::'CE1~Al:~i3aiPi~E :::~ <br /> <br /> <br /> <br />l7Y:::: ;Ar <br />Mitliht7~ <br />36 <br />37 2511.501 <br />2550.602 CLASS III RANDOM RIP RAP <br />INSTALL SALVAGED 36" APRON CY <br />EA 45 <br />1 50.00 <br />150.00 0 <br />0 0.00 <br />0.00 0 <br />0 0.00 <br />0.00 <br />T SCHEDULE 2.0 STORM SEWER TOTALS 9,732.00 21,854.00 <br /> SCHEDULE 3.0 WATERMAIN <br />38 <br />39 <br />40 <br />41 2104.501 <br />2504.602 <br />2504.602 <br />2504.603 REMOVE WATERMAIN <br />WATER UTILITY HOLE <br />WATERMAIN OFFSET TRENCH <br />WATERMAIN TRENCH LF <br />EA <br />EA <br />LF 265 <br />2 <br />2 <br />285 10.00 <br />500.00 <br />800.00 <br />13.00 265 <br />2 <br />0 <br />265 2,650.00 <br />1,000.00 <br />0.00 <br />3,445.00 265 <br />2 <br />0 <br />265 2,650.00 <br />1 OOD OD <br />0.00 <br />3,445.00 <br />T SCHEDULE 3.0 WATERMAIN TOTALS 7,095.00 7,095.00 <br /> SCHEDULE 4.0 GRADING AND PAVEMENTS <br />42 <br />43 <br />44 <br />45 <br />46 2105.501 <br />2105.501 <br />2105.522 <br />2211.501 <br />2350.501 COMMON EXCAVATION (P) <br />ADDITIONAL POND EXCAVATION (P) <br />SELECT GRANULAR BORROW (CV) (P) <br />CLASS 5 AGGREGATE BASE <br />TYPE LV3 WEARING COURSE MIXTURE (C) <br />2" BITUMINOUS PAVEMENT BASKETBALL COURT CY <br />CY <br />CY <br />TN <br />TN 3700 <br />770 <br />770 <br />900 <br />110 6.00 <br />7.50 <br />9.00 <br />18.00 <br />78.00 0 <br />250 <br />0 <br />0 <br />0 0.00 <br />1,875.00 <br />D.OD <br />0.00 <br />0.00 0 <br />250 <br />0 <br />0 <br />0 D.00 <br />1,875.00 <br />0.00 <br />0.00 <br />0.00 <br />47 <br />48 <br />49 <br />50 <br />51 2350.501 <br />2350.502 <br />2357.502 <br />2521.501 <br />2521.507 TYPE LV3 WEARING COURSE MD(TURE <br />TYPE LV3 NON-WEARING COURSE MIXTURE (C) <br />BITUMINOUS MATERIAL FOR TACK COAT <br />4"CONCRETE WALK <br />6" CONCRETE DRNEWAY PAVEMENT <br />6" COLORED AND STAMPED CONCRETE TN <br />TN <br />GAL <br />SF <br />SY 22 <br />140 <br />70 <br />10350 <br />63 78.00 <br />76.00 <br />4.05 <br />3.00 <br />27.40 0 <br />0 <br />0 <br />0 <br />0 0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 0 <br />0 <br />0 <br />0 <br />0 0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />• 52 <br />53 <br />54 <br />55 2521.618 <br />2531.501 <br />2531.602 <br />2563.601 CROSSWALK <br />CONCRETE CURB AND GUTTER DES. 6618 <br />PEDESTRIAN CURB RAMP <br />TRAFFIC CONTROL SF <br />LF <br />EA <br />LS 162 <br />520 <br />5 <br />1 18.90 <br />14.95 <br />1,035.00 <br />500.00 0 <br />0 <br />0 <br />0 0.00 <br />0.00 <br />0.00 <br />0.00 0 <br />0 <br />0 <br />0 0.00 <br />0.00 <br />0.00 <br />0.00 <br />56 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE LS 1 1,000.00 0 0.00 0 0.00 <br />T SCHEDULE 4.0 GRADING AND PAVEMENTS TOTALS 1 875 ~ 1 875 00 <br /> SCHEDULE 5.0 PARK APPURTENANCES <br />57 <br />58 <br />59 <br />60 <br />61 <br />62 <br />63 <br />64 <br />65 21.601 <br />2100.601 <br />2540.602 <br />2540.602 <br />2545.501 <br />2557.603 <br />2557.603 <br />2557.603 <br />SPEC GAZEBO <br />PAINT GAZEBO <br />BENCH <br />WASTE RECEPTACLE <br />GAZEBO LIGHTING <br />6-FOOT VINYL COATED CHAIN LINK FENCE <br />12-FOOT VINYL COATED CHAIN LINK FENCE <br />ORNAMENTAL FENCE DESIGN SPECIAL <br />INSTALL BASKETBALL HOOP GROUND ANCHOR LS <br />LS <br />EA <br />EA <br />LS <br />LF <br />LF <br />LF <br />EA 1 <br />1 <br />7 <br />2 <br />1 <br />220 <br />80 <br />170 <br />1 25,000.00 <br />2,000.00 <br />1,050.00 <br />1,100.00 <br />13,125.00 <br />21.5D <br />31.75 <br />50.00 <br />1,195.00 0 <br />0 <br />0 <br />O <br />0 <br />0 <br />0 <br />0 <br />0 0.00 <br />0.00 <br />0.00 <br />D.OD <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 0.28 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 7,000.00 <br />0.00 <br />0.00 <br />000 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />T SCHEDULE 5.0 PARK APPURTENANCES TOTALS 0.00 7,000.00 <br /> SCHEDULE 6.0 LANDSCAPE PLANTING <br />66 <br />67 <br />68 <br />69 <br />70 <br />71 <br />• 72 <br />73 <br />74 2105.526 <br />2105.607 <br />2571.602 <br />2571.602 <br />2571.602 <br />2571.602 <br />2571.602 <br />2571.602 <br />2571.602 SELECTTOPSOILBORROW (P) <br />AMENDED SOIL <br />TREES OVERSTORY (LARGE CAL.) <br />DECIDUOUS SHADE TREES <br />EVERGREEN TREES <br />DECIDUOUS ORNAMENTAL TREES <br />DECIDUOUS SHRUBS <br />PERENNIALS <br />GRASSES CY <br />CY <br />EACH <br />EACH <br />EACH <br />EACH <br />EACH <br />EACH <br />EACH 350 <br />101.64 <br />6 <br />9 <br />6 <br />46 <br />109 <br />701 <br />Z6 10.00 <br />50.00 <br />840.00 <br />615.D0 <br />300.00 <br />216.00 <br />52.50 <br />15.75 <br />21.00 0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />O.DO <br />0.00 <br />0.00 <br />O.OD 0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />o:lproj1811550J\Partial Pey Estimates\Payest-061604-#2xls PAGE Z <br />