My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCAgenda_03Oct8
FalconHeights
>
City Council
>
City Council Agenda Packets
>
200x
>
2003
>
CCAgenda_03Oct8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2009 9:37:40 AM
Creation date
6/25/2009 4:36:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Howard R. Green Company <br />October 2, 2003 <br />File: 822110) <br />Mr. Bill Maertz <br />City of Falcon Heights <br />2077 Larpenteur Avenue West <br />Falcon Heights, MN 55113-5551 <br />RE: 2003 SIDEWALK IMPROVEMENTS <br />Dear Mr. Maertz: <br />(Z+~~ <br />~~. Ib N <br />The City received quotes to complete the 2003 Sidewalk Improvement project on October 2, 2003. <br />Requests were sent to eight contractors. Two quotes were returned: one from Midwest Concrete <br />Driveway for $ 9,082.30, and one from Bailey Construction for $ 7,660.00. <br />This project consists of the removal and replacement of approximately 1,100 square feet of sidewalk <br />and three pedestrian ramps. Additionally, 36 lineal feet of concrete curb and gutter will be replaced to <br />allow drainage of the sidewalk into the gutter. All of the sidewalk and curb and gutter to be replaced <br />as part of this project have been marked with white paint. <br />The completion date for this project is scheduled for October 30, 2003. Further scheduling issues will <br />be worked out at the pre-construction conference. No work will be permitted prior to a pre- <br />construction conference being held to coordinate the work. We will provide periodic inspection of the <br />work as it progresses. <br />The project requires City staff to complete restoration along the completed sidewalk as has been done <br />in previous years. We will coordinate this work with the contractor and City staff. <br />We recommend award of this contract to Bailey Construction in the amount of $7,660.00. <br />If you have any additional questions or concerns, please contact us. <br />Sincerely, <br />Howard R. Green Company <br />/'~~-~- <br />Greg Robinson <br />Project Engineer <br />Enclosure <br />• Cc: Bill Maertz, Public Works Director <br />0:1PROJ1822110~Ltr 10.2-03 Maertz.doc <br />1326 Energy Park Drive St. Paul, MN 55108 651/644-4389 fax 651/644-9446 toll free 888/368-4389 <br />
The URL can be used to link to this page
Your browser does not support the video tag.