Laserfiche WebLink
B. Summary of the six minimum control measures. Complete items B. 1. through B. 6. <br />Storm Water Pollution Prevention Programs must address the specific requirements contained in Part V. G. of the permit. SWPPPs must <br />outline how the six minimum control measures will be addressed, the contact person, department in charge, time frame and measures that <br />will be implemented to meet the schedules required by the permit. <br />1. Public education and outreach measures <br />Jones Deborah Planning and Zoning <br />Contact Last Name First Name Department <br />2077 W. Larpenteur <br />Mailing Address <br />Falcon Heights MI~t 55113 <br />City State Zip Code <br />651-644-5050 djones@ci.falcon-heights.mn.us <br />Telephone (include area code) E-Marl Address <br />a) Have Best Management Practices (BMPs) that will be implemented for this m;n;mum ®Yes ^No <br />control measure been planned or developed? <br />b) Have measurable goals for each BMP for this minimum control measure been planned or ®Yes ^No <br />developed? <br />c) Has an estimated timeline for implementing each BMP for this minimum control ®Yes ^No <br />measure been planned or developed? Timelines should include, in narrative or numerical <br />form, the months and years required actions will occur, interim milestones, and <br />frequency of action, as appropriate. <br />d) Have the educational components for this minimum control measure been planned or ®Yes ^No <br />developed? <br />e) Provide a brief description of the plan to complete any requirements marked "No" above. <br />2. Public participation and involvement measures <br />Kodluboy Mary City Clerk <br />Contact Last Name First Name Department <br />2077 W. Larpenteur Ave. <br />Mailing Address <br />Falcon Heights MN 55113 <br />Crty State Zip Code <br />651-644-5050 mkodluboy@cifalcon-heights.mn.us <br />Telephone (include area code) E-Mail Address <br />a) Have Best Management Practices (BMPs) that will be implemented for this minimum ®Yes ~No <br />control measure been planned or developed? <br />b) Have measurable goals for each BMP for this minimum control measure been planned or ®Yes ~No <br />developed? <br />c} Has an estimated timeline for implementing each BMP for this minimum control ®Yes ^No <br />measure been planned or developed? Timelines should include, in narrative or numerical <br />form, the months and years required actions will occur, interim milestones, and <br />frequency of action, as appropriate. <br />d) Have the educational components for this minimum control measure been planned or ®Yes ^No <br />developed? <br />e) Provide a brief description of the plan to complete any requirements marked "No" above. <br />MPCA MS4 Storm Water Permit Application <br />