Laserfiche WebLink
• 4) a complete clean-up, or disposal at an approved dump site, of all <br />personal property in the site that is found to have been affected by the conditions at the site; <br />5) a complete clean-up of all property and soil in proximity to the site that <br />is found to have been affected by the conditions at the site; and <br />6) remediation testing and follow-up testing, including testing of the <br />ventilation system and plumbing, to determine that all health risks are sufficiently reduced to <br />allow safe human occupancy and use of the site, use of the personal property in it, and use of all <br />property and soil in proximity to the site. <br />(c) provide the city with the identity of the testing and cleaning firm with which <br />the owner has contracted for abatement of the public health nuisance as required above; and <br />(d) sign an agreement with the city establishing aclean-up schedule. The <br />schedule must establish reasonable deadlines for completing all actions required by this chapter <br />for abatement of the public health nuisance. The city will consider practical limitations and the <br />availability of contractors in approving the clean-up schedule. <br />(2) The owner must meet all deadlines established in the clean-up schedule. The owner <br />must provide the city with written documentation of the clean-up, including a signed statement <br />• from acity-approved environmental hazard testing and cleaning firm that the site, all personal <br />property in it, and all property and soil in proximity to the site is safe for human occupancy and <br />use and that the clean-up was conducted in accordance with the most current state guidelines. <br />8-5.09. Site Owner's Responsibility for Costs. The site owner is responsible for all costs <br />of dealing with and abating the public health nuisance, including contractor's fees and the city's <br />costs for services performed in connection with the clandestine drug lab site clean up. The city's <br />costs may include: <br />(1) posting of the site; <br />(2) notification of affected parties; <br />(3) securing the site, providing limited access to the site, and prosecution of unauthorized <br />persons found at the site; <br />(4) expenses related to the recovery of costs, including the special assessment process; <br />(5) laboratory fees; <br />(6) clean-up services; <br />• (7) administrative fees; <br />a4 <br />