My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCAgenda_05Jul13
FalconHeights
>
City Council
>
City Council Agenda Packets
>
200x
>
2005
>
CCAgenda_05Jul13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2009 9:56:14 AM
Creation date
7/6/2009 2:16:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FALCON HEIGHTS CITY COUNCIL MINUTES -3- <br />June 22, 2005 <br />Consideration of construction contract with the City of Roseville <br />Administrator Worthington said that in 2004, Ramsey County turned back Roselawn Avenue <br />to the cities of Falcon Heights and Roseville. The section of Roselawn Avenue between Hamline <br />Avenue and Snelling Avenue is in need of reconstruction. Staff from both cities met to discuss <br />the need to have this section of Roselawn reconstructed. The driving surface is badly <br />deteriorating, and the storm water drainage is inadequate, causing flooding in side yards along <br />the street. The proposed scope of this project may include: Reconstruction to meet municipal <br />state-aid street standards, construction of curbs and gutters, construction of storm sewers as <br />necessary, repair and/or replacement of other utilities as needed (water main, sanitary sewer), <br />and construction of a 6 foot wide sidewalk. The City of Roseville has indicated that the <br />engineering and contract administration services for this project can be handled by their staff <br />working with our staff as needed. Falcon Height's staff believes that this arrangement is the <br />most cost effective and human resource efficient arrangement to handle this project. The <br />first informational meeting with the public regarding this project was held on Tuesday, <br />June 21, 2005. A second informational meeting is being planned for September 2005, as well <br />as a neighborhood walk-thru meeting to be scheduled for October, 2005. <br />• Staff from both cities worked on the draft agreement, it was reviewed by the respective legal <br />counsels, and is being recommended for approval. The Roseville City Council approved the <br />agreement on Monday evening with a vote of 5-0 in favor. <br />A brief discussion followed. <br />Talbot moved that the Roselawn Avenue Street Reconstruction Agreement with the City <br />of Roseville be approved, with the grammatical changes recommended by Mayor Gehrz, and that <br />the mayor and city administrator be authorized to sign it on behalf of the City of Falcon Heights. <br />The motion was unanimously approved. <br />Consideration of mid-Year salary adjustment for the position of City Administrator <br />Mayor Gehrz said that in 2003, the city conducted a review of how the salaries and <br />responsibilities of all city staff positions compared with other metropolitan cities of similar sizes. <br />That review revealed that the City of Falcon Heights was paying salaries that were far below <br />comparable cities for two positions--the City Administrator and the Finance Director. <br />Mayor Gehrz said that as a result, the city council approved a goal and a plan to bring the salaries <br />for these two positions to 90% of the average of comparable cities by January 1, 2006. That goal <br />assumes that the employees in those positions have performed satisfactorily for five years. This <br />plan enabled the City to spread the needed increases across three years instead of making the <br />• adjustment in only one budget year. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.