My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCAgenda_92May18
FalconHeights
>
Committees and Commissions
>
Planning Commission
>
Planning Commission Packets
>
199x
>
1992
>
PCAgenda_92May18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2009 3:42:54 PM
Creation date
7/7/2009 12:46:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. The sanitary sewer penetrates each building along a common wall and is connected to the 8 inch main located in <br />Prior Avenue. Due to the back to back design and the use of condominium ownership, each home will not have <br />individually installed water and sewer. Gas, phone, cable, and electric utilities will be installed separately for each <br />home. <br />The Rottlund Company proposal for "Maple Knoll" offers a unique opportunity to create a small mixed use project <br />in Falcon Heights. With maximum structure roof height of about 28 feet above grade for the center of the 8 home <br />building, stepping down to about 16 feet at the end homes lowest point, a more pedestrian scale is maintained. <br />With 5 trees per home and individual Courtyard patio areas, indoor and outdoor use is encouraged. Address signs <br />and mailboxes are shown to clarify the homes for delivery and guest purposes. We encourage your comments and <br />look forward to your motion of approval. <br />DJ/skh/sc <br />DJMPKNLS.doc <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.