My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCAgenda_03Sep23
FalconHeights
>
Committees and Commissions
>
Planning Commission
>
Planning Commission Packets
>
200x
>
2003
>
PCAgenda_03Sep23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2009 9:02:00 AM
Creation date
7/8/2009 10:11:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Plans and specs which shall include the foundation; exterior repairs and <br />improvements, including windows and doors; roofing, electrical and <br />plumbing modifications; heating systems; and any necessary interior <br />reconstruction decorating, all to be in accordance with applicable building <br />codes and which shall indicate that the structure once moved shall be in <br />reasonable conformance with surrounding property including but not <br />limited to sodding, grading and planting. <br />b. Upon presentation of this application, deposit the fee as stipulated in Section 5- <br />14.07 of the code with the Zoning Administrator to defray costs incurred by the <br />city in processing the application, inspecting the building and doing whatever else <br />is necessary to determine whether the building conforms with or can be made to <br />conform with existing codes. If any portion of the escrow payment required is not <br />used, the amount remaining shall be returned to the petitioner following <br />satisfactory completion of item (d) following. <br />c. If the city requires an additional deposit to guarantee any street repairs that <br />may be required following the process of moving the building, deposit such <br />amount up to $1,000.00 with the Zoning Administrator. Any unused portion of <br />such deposit will be returned to the petitioner following satisfactory completion of <br />item (d) following: <br />• d. Furnish a surety bond to the City in the amount of one and one-half times the <br />estimated costs of remodeling, refurbishing or otherwise constructing or <br />reconstructing such building in accordance with the plans and specifications and <br />the city's building code and such bond shall be further conditioned that work will <br />be completed within 90 days of issuance of the permit. The bond shall operate in <br />favor of the city and shall hold the city harmless from any loss or damage by <br />reason of improper or inadequate work performed by the holder of said license <br />under the provisions of this code. In addition, the bond shall set forth that the site <br />will be cleaned up and that all rubbish, material, extra fill, dirt, debris and left <br />over materials shall be removed within 15 days after the building is moved on to <br />the site. <br />e. Deposit with the Zoning Administrator a copy of a certificate of insurance <br />indicating that the petitioner has sufficient insurance to protect the municipality <br />and public from any and all damage which may result either directly or indirectly <br />from the moving of said building. <br />Upon receipt of the application, the Zoning Administrator shall inform the building <br />inspector who shall inspect the building and be reimbursed for time and travel involved in <br />making such inspection. <br />The city engineer shall determine whether or not drainage of the new site is feasible and <br />available and in connection therewith may require any appurtenances or new installations <br />all of which shall be at petitioner's expense. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.