My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCAgenda_08Mar25
FalconHeights
>
Committees and Commissions
>
Planning Commission
>
Planning Commission Packets
>
200x
>
2008
>
PCAgenda_08Mar25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2009 9:41:18 AM
Creation date
7/8/2009 11:26:10 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Purpose of Plan Update <br />This report summarizes the results of a comprehensive plan update for the City of Falcon <br />Heights. The plan update included a review and evaluation of the following: <br />• Transportation system. <br />• Sanitary sewer system. <br />• Storm water management. <br />Water service is provided to Falcon Heights by St. Paul Regional Water Service. The <br />system is already in place, and no expansion is anticipated over the life of this plan. <br />The main purpose of the plan update was to evaluate the existing and future <br />transportation and the sanitary sewer system needs of the City, as well as the <br />infrastructure improvements and expansions necessary to serve the current and future <br />residents. Also, a review and evaluation of the City's storm sewer system was completed <br />and a storm water management plan was developed. <br />The City's present and future needs have been evaluated and recommendations made for <br />necessary improvements to maintain adequate service levels for the transportation, <br />sanitary sewer, and storm water systems. This plan update will serve as a guide for future • <br />infrastructure improvements for these three systems. <br />Scope of Plan Update <br />The approach used for this plan update started with an assessment of existing <br />transportation, sanitary sewer, and storm sewer system condition and an evaluation of the <br />City's needs. Current and future needs were evaluated over a 20+-year planning period <br />extending to the year 2030. <br />A review and evaluation of the existing transportation system is provided in Section 2. A <br />review and evaluation of the existing sanitary sewer system is provided in Section 3, <br />which also includes a summary of recommended sanitary sewer system improvements. A <br />review and evaluation of the existing storm sewer system is provided in Section 4. A <br />recommended storm water management plan is also provided in this section. <br />Recommended Goals and Policies for the City are located at the end of each section. <br />As a result of needs changing over time, the City's planning process for the <br />transportation, sanitary sewer, and storm water management will be continuous. Long- <br />term projections and improvements provided in this plan update should be reviewed, re- <br />evaluated, and revised, as needed, to assure effective future planning efforts. Proper <br />future planning will help assure that infrastructure improvements are coordinated and • <br />constructed in the most effective manner. <br />Falcon Heights Comprehensive Plan 2008 Draft -January, 2008 Part III: Infrastructure, Page III-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.