Laserfiche WebLink
5. Steam, Water, Air or Hot Water Heating <br />• S ystem. <br /> 25.00 First 200,000 BYU input for construction <br /> of alteration or any warm air furnace <br /> duct work <br /> 4.00 Each additional 100,000 BTU input or <br /> fraction <br /> 25.00 First 200,000 BTU input per unit for <br /> construction or alteration of any warm <br /> air furnace duct work <br /> 4.00 Each additional 100,000 BTU input or <br /> fraction <br /> 25.00 First 200,000 BTU input per unit for <br /> installation or replacement of each <br /> steam or hot water system <br /> 4.00 Each additional 100,000 BTU's or fraction <br /> thereof (240 x EDR =BTU's/hr) <br /> 15.00 Per unit on unit heaters, based on first <br /> 100,000 BTU input <br /> 3.00 Each additional 100,000 BTU input or <br /> fraction thereof <br /> 6. Incinerators <br /> 15.00 Installation or repair of each domestic <br />• incinerator <br /> 50.00 Installation or repair of each commercial <br /> incinerator. <br /> 7. -Air Conditioning and Refrigerator Work <br /> 20.00 First 5 tons of any air conditioning or <br /> refrigeration project (60,000 BTU's) <br /> 3.00 Each additional ton or fraction thereof <br /> (12,000 BTU's) <br /> 175.00 Maximum fee per unit <br /> 25.00 First 5 tons (60,000 BTU's) of cooling <br /> for duct work for air conditioning <br /> 3.00 Each ton (12,000 BTU's or fraction <br /> thereof over first 5 tons for duct work <br /> for air conditioning <br /> 8. Ventilating Systems <br /> 25.00 First 2,000 CFM per unit <br /> 5.00 Each additional 1,000 CFM or fraction <br /> <br />~ thereof per unit <br /> 5.00 Each bathroom exhaust fan in <br />a multiple <br /> _ <br />dwelling <br /> 9. Solar Heating <br /> 25.00 Each installation <br />• <br />3 <br />