Laserfiche WebLink
• Fee <br />20.00 wJbathroom 510.00 no. b.r. (Comm. Park) <br />15.00 w/bathroom 10.00 no b.r. (Curtiss Field) <br />15.00 for University Grove park <br />2. Park Buildings <br />a. Community Park <br />Fee Item <br />550.00 per 6 hour shift or portion of a shift <br />Additional fee of 55.00 per hour in excess of the 6 hour shift <br />plus any set-up cost if set up is requested. <br />30.00 for two hours or less when building use is <br />limited to multi-purpose space (kitchen use <br />is limited to coffee pot and/or refrigerator) <br />b. Curtiss Field Building <br />Fee <br />• 520.00 <br />1. Damage and Key Deposit <br />Fee <br />5100.00 Deposit required for any use when a key to the <br />building is requested. This will be treated <br />as a deposit for building and equipment repair when <br />damage is caused by a rental party and/or for <br />time spent cleaning when facilities are left in <br />excessive disorder. If the building is left in good <br />order and the key is returned, the full <br />deposit shall be refunded. <br />c. City Hall Facilities <br />Fee <br />535/first 3 hours <br />515 each additional hour <br />535.00 set up <br />55.00 kitchen <br />525.00 conference room <br />5 <br />