Laserfiche WebLink
• requirement for the remaining term of the franchise, <br />with the understanding that such equipment/capability <br />will be a subject for negotiation upon any request for <br />renewal of the franchise. <br />f. North Central shall have agreed to amend the existing <br />franchise to conform to this resolution and the terms <br />of this sale and transfer of control. <br />g. To the extent required as a result of the sale of <br />stock and transfer of control, North Central and <br />City agree to the replacement of any and all letters <br />of credit, bonds, insurance, certificates, or other <br />forms of security provided to the City pursuant to <br />the terms of the franchise. <br />h. North Central shall have agreed to conduct "proof <br />of performance tests" as required by the FCC, with <br />50~ of the test sites selected by Commission on the <br />scheduled day of the tests, and any sweeping and <br />balancing of the system required as a result of the <br />random end-of-line performance tests. In addition, <br />North Central shall have agreed to conduct an annual <br />sweep and balance of the trunk cable system, and a <br />• bi-annual (every other year) sweep and balance of the <br />distribution system. <br />i. North Central shall have agreed to contribute to <br />the Commission two (2) Di-tech frames each with a <br />capacity of forty (40) inputs by fifteen (15) <br />outputs for the purpose of enhancing the North <br />Suburban Access Corporation's responsibility for <br />institutional and subscriber network switching. <br />North Central shall purchase for the Shoreview <br />headend a new Di-tech switcher with thirty-two (32) <br />inputs and sixteen (16) outputs for institutional <br />and subscriber network switching. In the event the <br />Shoreview headend should no longer be utilized by <br />North Central, this switcher shall at the expense <br />of North Central be moved to and utilized for the <br />same purpose at the Commission's master control <br />operated by the access corporation. The access <br />corporation agrees to assume responsibility for <br />switching on the institutional network. <br />j. North Central shall have agreed to contribute to <br />the Commission a new Di-tech Pace 3000 controller <br />including two additional controllers for sites <br />currently identified as sites two and three. <br />C J <br />