My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCRes_92-45
FalconHeights
>
City Council
>
Resolutions
>
199x
>
1992
>
CCRes_92-45
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 10:57:03 AM
Creation date
7/8/2009 4:03:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Mechanical Permit Fees. <br />Fee Item <br />• $25.00 1. Basic <br />5.00 2. Each appliance. (machine, device, heater, <br /> range, refrigerator, gas dryer, gas <br /> stove, gas hot water heater or other <br /> appliance) requiring the use of <br /> manufactured gas, natural. gas or liquid <br /> petroleum gas <br />10.00 3. Gas Piping. $500 valuation or less <br />_ (repair or installation) <br />4.00 Each additional $500 cost of repair or <br /> installation <br /> 4. Gas Burners or Gas Burner Equipment or <br /> Oil Burning Furnace or Boilers <br />20.00 First 200,000 BTU input or less <br />3.00 Each additional 1,000 input or fraction <br /> thereof <br />175.00 Maximum fee for each unit <br /> 5. Steam, Water, Air or Hot Water Heating <br /> System. <br />25.00 First 200,000 BYU input for construction <br /> of alteration or any warm air furnace <br /> duct work <br />4.00 Each additional 100,000 BTU input or <br /> fraction <br />25.00 First 200,000 BTU input per unit for <br /> construction of alteration .or any warm <br /> air furnace duct work <br />4.00 Each additional 100,000 BTU input or <br /> fraction <br />25.00 First 200,000 BTU input per unit for <br /> installation or replacement of each <br /> steam or hot water system <br />4.00 Each additional 100,000 BTU's or fraction <br /> thereof (240 x EDR = BTU's/hr) <br />15.00 Per unit on unit heaters, based on first <br /> 100,000 BTU input <br />3.00 Each additional 100,000 BTU input or <br /> fraction thereof <br /> 6. Incinerators <br />15.00 Installation or repair of each domestic <br /> incinerator <br />50.00 Installation or repair of each commercial <br /> incinerator <br /> 7. Air Conditioning and Refrigerator Work <br />20.00 First 5 tons of any air conditioning or <br /> refrigeration project (60,000 BTU's) <br />3.00 Each additional ton or fraction thereof <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.