Laserfiche WebLink
As you requested we roughed out a construction budget for the Falcon Heights portion of the <br />Greenway from the western city boundary with Lauderdale to Coffman Street (1,300. A 10% <br />contingency can be expected: <br />Item Unit Unit Cost # Of Units Subtotal <br />Clearin and Grubbin 1 acre 8250 .35 2 888 <br />Minor Gradin LF 5.5 1300 7 150 <br />Base and Paving LF $21 1300 $27,300 <br />8' wide Trail <br />Additional site features (Benches, $20,000- <br />Emergency Station, Signage, bike rack, $55,000 <br />lantin s stairwa etc. <br /> $57,338- <br /> $92,338 <br />I have included a few relevant services sheets, which document our expertise in this area of <br />work. Please contact me if you need any additional material or information. <br />Thank you for your time and consideration, <br />• is <br />L. Peter MacDonagh -Vice esident <br />• <br />THE KESTREL DESIGN GROUP, INC. -A Woman-Owned Business <br />5136 Huiker;on Avenue, Suite 1 • Mumeapolis, Muinesota 55936 <br />(9.52) 928-9600 Fax (952) 928-1939 www.kestreldesigigroup.com <br />