Laserfiche WebLink
<br />ENGINEERS ESTIMATE FOR: CURTISS FIELD PARK POND <br />CITY OF FALCON HEIGHTS, MINNESOTA ~ ~ <br />January 20, 2004 <br />I ::... .:.:.:.:: <br />,.T.EM :: . ....:.......:.: <br />~1il~ii#riOT . ::.:::.:::.:::::.:.:::::.:::.:.:.:::::.:.:.:::::.:.:.:.:::::.:::.:.:.:::::.:::.:::.:.:.:.:.:.:::.::::::: ::::::::::.:.:::::.:.::: ::.:::.:.:.:.:.:.:.:.:::.::::: .:::::::::.:::::::::. :::.:::::.:::::::::.:.:.:.:::.:::.:.:. <br />:.......... <br />Ip)9s . <br />,.: <br />Ck . : <br />IT`BI{If <br />~ <br />• <br />: <br />1111~iT <br />.u1+M <br />~ <br />C~'€''1E <br />C~T1'.: <br /> ......,., <br />. ......... <br />........ <br />. <br />....... <br />.......:.................. ... <br />.:.. <br />..,. .... <br />..... <br />. <br />I~ .... <br />. ....:.......:. <br />:€:::~p5 <br /> <br />~. <br />SCHEDULE 1.0 REMOVALS <br />1 2021.501 MOBILIZATION LS $37,000.00 1.00 $37,000.00 <br />2 2101.502 CLEARING TREE > 4" DIAMETER TREE $75.00 116.00 $8,700.00 <br />3 2101.507 GRUBBING TREE > 4" DIAMETER TREE $75.00 116.00 $8,700.00 <br />4 2104.501 REMOVE CONCRETE CURB AND GUTTER LF $3.50 355.00 _ <br />$1,242.50 <br />5 2104.501 REMOVE 12" CMP LF $6.OD 85.00 $510.00 <br />6 2104.501 REMOVE 15" CMP .. LF $7.00 135.00 $945.00 <br />7 2104.501 REMOVE 24"CMP LF $8.00 140.00 $1,120.00 <br />8 2104.501 REMOVE 36" RCP LF $15.00 24.00 $360.00 <br />9 2104.501 REMOVE CHAIN LINK FENCE LF $7.00. 1,355.00 $9,485.00 <br />10 2104.501 REMOVE WATERMAIN LF $8.00 265.00 $2,120.00 <br />11 2104.503 REMOVE CONCRETE PAVEMENT and SIDEWALK SY $9.00 430.00 $3,870.00 <br />12 2104.505 REMOVE BITUMINOUS PAVEMENT (FULL DEPTH) SY $6.00 2,265.00 $13,590.00 <br />13 2104.509 REMOVE CONCRETE DRAINAGE STRUCTURE • EA $200.00 6.00 $1,200.00 <br />14 2104.523 REMOVE BENCH EA $75.00 3.00 $225.00 <br />15 2104.523 REMOVE BASKETBALL HOOP EA $200.00 1.00 $200.00 <br />16 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LF $3.00 40.00 $120.00 <br />17 2104.523 SALVAGE SIGN EA $60.00 .2.00 $120.00 <br />18 2104.523 SALVAGE 36" RC FLARED END SECTION EA $100.00 1.00 $100.00 <br />19 2104.525 ABANDON 12" CMP LF $20.00 43.00 $860.00 <br />20 2232.501 MILLING ASPHALT PAVEMENT SY $7.00 36.00 $252.00 <br />21 2104.511 SAWING CONCRETE PAVEMENT LF $6.00 42.00 $252.00 <br />T S CHEDULE 1 .0 REMOVALS TOTALS $90,971.50 <br />SCHEDULE 2.0 STORM SEWER <br />22 2501.515 12" RC PIPE APRON W/TRASH GUARD EA $850.00 1.00 $850.00 <br />23 2501.515 15" RC PIPE APRON W/TRASH GUARD EA $1,000.00 1.00 $1,000.00 <br />24 2501.515 30" RC PIPE APRON W/TRASH GUARD EA $2,000.00 1.00 $2,000.00 <br />25 2503.541 12" RC PIPE SEWER DESIGN 3006 CL V LF $25.00 50.00 $1,250.00 <br />26 2503.541 15" RC PIPE SEWER DESIGN 3006 CL V LF $30.00 152.00 $4,560.00 <br />27 2503.541 24" RC PIPE SEWER DESIGN 3006 CL III LF $40.00 139.00 '. •' •$5,560.00 <br />28 2503.541 27" RC PIPE SEWER DESIGN 3006 CL III LF $45.00 30.00 ~ $1,350.00 <br />29 2503.541 30" RC PIPE SEWER DESIGN 3006 CL III LF $50.00 106.00 $5,300.00 <br />30 2503.602 CONNECT TO EXISTING STORM SEWER EA $500.00 1.00 $500.00 <br />31 2506.502 CONSTRUCT DRAINAGE STRUCTURE DES 48" EA $1,800.00 4.00 $7,200.00 <br />32 2506.502 CONSTRUCT DRAINAGE STRUCTURE DES 27" EA $1,250.00 2.00 $2,500.00 <br />33 2511.501 CLASS III RANDOM RIP RPRP CY $60.00 60.00 $3,600.00 <br />34 2550.602 INSTALL SALVAGED 36"APRON EA $300.00 1.00 $300.00 <br />T SCHEDULE 2.0 STORM SEWER TOTALS $35,970.00 <br />SCHEDULE 3.0 WATERMAIN <br />35 2504.602 WATER UTILITY HOLE EA $900.00 2.00 $1,800.00 <br />36 2504.603 WATERMAIN TRENCH LF $21.00 285.00 $5,985.00 <br />37 2504.604 WATERMAIN OFFSET TRENCH EA $800.00 2.00 $1,600.00 <br />T SCHEDULE 3.0 WATERMAIN TOTALS $9,385.00 <br />• <br />