My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRCAgenda_92Sep14_Canceled
FalconHeights
>
Committees and Commissions
>
Parks and Rec Commission
>
Parks and Rec. Com. Packets
>
199x
>
1992
>
PRCAgenda_92Sep14_Canceled
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2009 1:47:23 PM
Creation date
7/15/2009 11:38:58 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />MINUTES <br />PARKS AND RECREATION COMMISSION MEETING <br />AUGUST 12, 1992 <br />7:00 p.m. <br />MEMBERS PRESENT: Carol Huso, Jyneed Thatcher, Lloyd Jacobson, <br />Carol Kriegler, Park and Rec Director, Sue <br />Gehrz, Council Liaison <br />MEMBERS ABSENT: Carol Weisberg, Morris Nicholson, Linda McLoon, <br />Dave Wickhem, Steve Schugel <br />1. Recreation Program Publicity Procedures. <br />Item was tabled until next meeting. Commissioner most <br />interested in item was not present. <br />• <br />2. 1993 Budget Planning. <br />Members present examined the <br />capital improvement program. <br />comments were made. <br />Community Park <br />staff draft of the parks <br />The following questions or <br />signage ($2,500) - Some discussion about the number of <br />park entrance signs. Is one sign located at Northwest <br />corner adequate or should there be a second sign for <br />those entering from the east? Feeling was that there <br />should be a sign on Roselawn as well and that since this <br />could probably be modest in size, money budgeted is <br />adequate. <br />Trail Rehabilitation ($6,000) and Vita Course Improvement <br />($10,000) - There was some question and discussion about <br />the timing of these improvements. Consensus was that it <br />would be better to wait until 1994 when the county should <br />be done with the Cleveland Avenue project. <br />• <br />Basketball Court Improvement ($6,000) - Hardcourt area is <br />to be resurfaced yet this fall along with tennis courts. <br />This money is for the installation of as many as 4 <br />basketball standards with extenders. There was some <br />question about the number of standards needed.. Jyneen <br />Thatcher requested that the raised lip on the hardcourt <br />be repaired. Carol Kriegler will consult with Scott <br />Midness about the configuration of the court and <br />subsequently about the number of standards and about <br />the specifications for repair of the raised lip. <br />
The URL can be used to link to this page
Your browser does not support the video tag.