My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRCAgenda_91Jun10
FalconHeights
>
Committees and Commissions
>
Parks and Rec Commission
>
Parks and Rec. Com. Packets
>
199x
>
1991
>
PRCAgenda_91Jun10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2009 1:34:31 PM
Creation date
7/15/2009 1:33:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• MINUTES <br />PARKS AND RECREATION COMMISSION MEETING <br />May 13, 1991, 7:00 p.m. <br />Members Present: Linda McLoon, Steve Schugel, Jyneen Thatcher, Jeff <br />Johnson, Dave Wickhem, Lloyd Jacobson, Carol Kriegler, Parks Director, <br />Sam Jacobs, Council Liaison <br />Members Absent: Mike Farrell, Carol Huso, Deborah Weiland <br />1. Appointment of Officers <br />Jeff indicated his willingness to continue as Chair. Carol Huso, in absentia, <br />indicated that she was also willing to serve as chair. Since several members <br />were absent, the issue was tabled. <br />2. Community Park Bldg./Grounds Update <br />Carol K gave a summary of what has gone on. The city council authorized <br />the purchase and installation of kitchen cabinets, a range, refrigerator and <br />dish washer. Hopefully they will be in by the end of the month. <br />The 30 day period for the seeding has elapsed. The ground has been very <br />muddy, preventing seeding. The sodding is not weather contingent and that <br />• was not done. Carol K said they tried but never seemed to coordinate the <br />ground preparation with the seeding efforts. They were told that by next <br />Wed. if it is not done to specs, their contract will be terminated. The city <br />will award the contract to an outside landscaper, hopefully on May 24. The <br />city attorney is submitting this to Jefferson Construction Co. in writing. <br />3. Idaho/Snelling <br />The ad for bids went out. May 30 is the bid opening for both the building <br />construction co. and the landscaping. Carol K told Scott we needed the <br />most for our money. Scott thought utility hook-ups should be billed directly <br />to the city, since the city is usually charged less than an independent <br />contractor. The building budget can't really be cut. The only add/alternate <br />was a wood shingle roof. Construction will hopefully start mid-June. <br />4. Playground Equipment <br />We may have the playground co. install it or maybe the general contractor, <br />depending on who would be cheaper. We will send RFPs to three <br />playground companies, listing desired features, with the instruction not to <br />exceed S 16,000. The bid will be in 2 parts, the equipment itself and then <br />the installation. We discussed the plan itself. Design to include: 2 sections <br />(one for older and one for younger kids), 2 spring toys, a fire pole, <br />traditional swings, some type of suspension bridge, 2 diggers, hand-over- <br />hand rings, chin up bar, cargo net, track ride, spiral slide, short double wide <br />slides (for 2 kids at once). Bid requests will be sent to: Landscape <br />Structures, Miracle, Timberform, Iron Mountain Forge. <br />
The URL can be used to link to this page
Your browser does not support the video tag.