My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRCAgenda_95Jun12
FalconHeights
>
Committees and Commissions
>
Parks and Rec Commission
>
Parks and Rec. Com. Packets
>
199x
>
1995
>
PRCAgenda_95Jun12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2009 3:06:45 PM
Creation date
7/15/2009 3:06:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Meeting Date: 6/12/95 <br />Agenda Item: D - 1 <br />CITY OF FALCON HEIGHTS <br />PARRS AND RECREATION CONII~SISSION <br />ITEM DESCRIPTION: Falcon Heights School Site Improvement <br />Schematic Plan <br />SUBMITTED BY: Carol Kriegler, Parks and Recreation Department <br />EXPLANATION/SUMMARY: A Falcon Heights school site improvement <br />committee has met on numerous occasions over the past school <br />year in an attempt to establish a schematic plan for improving <br />the school site. Following is a summary of the proposed <br />improvements. <br />A. Excavating and Turf Establishment. <br />This would include bringing in materials on the east side of the <br />school site to eliminate the drop in grade in the area east of <br />the existing northeast ballfield. This would allow for an <br />easterly shift of both ballfields with no net loss in open space <br />between the fields. The city's engineer has advised us that <br />there appears to be sufficient room to push both ballfields to <br />the east approximately 60 feet. This would allow the existing <br />drainage Swale on the east edge of the grounds to remain as it <br />is. While it would be possible to attain the desired grade by <br />re-grading the site, staff has been strongly cautioned about the <br />challenges of re-establishing turf on a school site. Regrading <br />of the entire field had been favored as it would have provided <br />for an opportunity to eliminate ruts and voids in the field and <br />improve the general grade. The adjustment to the east will <br />result in a gain of space on the west side of the grounds that <br />would be improved with play equipment and miscellaneous site <br />amenities. It would also increase the distance between the east <br />play area and northeast ballfield. <br />B. Infield Construction. <br />With the shift in location of the ballfields, it would be <br />necessary to construct two new infields and replace (or <br />re-install) the baseball backstops. <br />C. Hardcourt Construction. <br />A quality hardcourt is recommended for the area just north of <br />the new east parking lot. The hardcourt would be approximately <br />40' x 70'. Color coated with boundary lines and keys, and <br />include both standard and junior height basketball standards. <br />D. Play Equipment. Designed with the intent of serving <br />children 10 years and older, play equipment would be located on <br />the east side of the school grounds. <br />
The URL can be used to link to this page
Your browser does not support the video tag.