My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCAgenda_93Jan27
FalconHeights
>
City Council
>
City Council Agenda Packets
>
199x
>
1993
>
CCAgenda_93Jan27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2010 10:47:23 AM
Creation date
11/8/2010 10:40:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t, v <br /> b <br /> CONSULTING ENGINEERS <br /> Maier Stewart Associates Inc. <br /> January 5, 1993 <br /> File: 330 028 -20 <br /> Ms. Susan Hoyt <br /> City Administrator <br /> City of Falcon Heights <br /> 2077 Larpenteur Avenue <br /> Falcon Heights, MN 55113 <br /> RE: 1993 STREET IMPROVEMENT PROJECT <br /> Dear Ms. Hoyt: <br /> We are approximately 60 percent complete with the plans for the above referenced project. <br /> The following is a list of the major issues that have arisen during the preparation of the plans <br /> and specifications: <br /> 1. We have contacted Mr. Emil Brandt of the Metro Council to check on the status of the <br /> request for funding on the bicycle and pedestrian pathway along Larpenteur Avenue and <br /> Coffman Street. The Transportation Advisory Board has not recommended the Falcon <br /> Heights pathway for funding to the Metro Council. It is not official yet but, according <br /> to Mr. Brandt, the Metro Council usually goes along with the recommendation. <br /> Therefore, because Larpenteur Avenue is proposed to be reconstructed and the funding <br /> from Metro Council is not available, we are recommending that the pathway along <br /> Larpenteur Avenue be constructed during the Larpenteur Avenue Street Construction <br /> project. <br /> 2. We have met with Ms. Carol Kriegler, Park and Recreation Director for the City of <br /> Falcon Heights, regarding the pathway along the east side of Coffman Street. <br /> The pathway will be six feet wide from Hoyt Avenue to Larpenteur Avenue. <br /> Typically, in the Grove Area, the sidewalk has a grass boulevard area between <br /> the curb and the sidewalk. To reduce the amount of easement acquisition and <br /> tree removal, the pathway will be placed against the back of the curb. <br /> To install the pathway, as we have proposed, will require the removal of three <br /> large pine trees on Coffman Street in the middle of the block between Hoyt and <br /> Folwell. There are bushes and other small pine trees behind the ones proposed <br /> to be removed, that will provide screening from the road. <br /> 1959 SLOAN PLACE, SUITE 200, ST. PAUL, MINNESOTA 55117 612- 774 -6021 <br /> 9800 SHELARD PARKWAY, SUITE 102, MINNEAPOLIS, MINNESOTA 55441 612 546 -0432 Equal Opportunity Employer <br /> 028- 0505.jan <br />
The URL can be used to link to this page
Your browser does not support the video tag.