Laserfiche WebLink
C <br /> GROVE PARK IMPROVEMENT PROJECT BUDGET ESTIMATE <br /> 7/20/93 <br /> Bituminous pathway (4" base, 2" asphalt, <br /> 6' wide) 5,000.00 <br /> $10 L.F., 500 L.F. at $10 <br /> Hardcourt improvement (expansion, color -coat, <br /> stripe) 3,500.00 <br /> Basketball standards (3 $1500 ea.) 4, 500.00 <br /> Bike rack 300.00 <br /> Picnic tables (2 $450) 900.00 <br /> Benches (4 $450 (not installed)) 1,800.00 <br /> Backstop, 10' x 12' vinyl coated 800.00 <br /> Play area edging (120 L.F. $9.00 L.F) 1,080.00 <br /> Pea gravel (50 C.Y. at $25 per C.Y.) 1,250.00 <br /> Horseshoe pits 500.00 <br /> Fitness stations (step -up $210, sit -up, $320, <br /> pull -up, $225 not installed) 755.00 <br /> Tetherball outfit 95.00 <br /> Installation (benches, fitness stations, tetherball) 500.00 <br /> TOTAL: $20,980.00 <br /> Lighting Improvements: <br /> Rink lightpole /fixtures 3,500.00 <br /> Service box 1,000.00 <br /> Timing set -up 700.00 <br /> TOTAL: $5,200.00 <br /> Landscaping (over 3 year period) <br /> 17 deciduous trees $350 ea. 5,950.00 <br /> 11 evergreen grees $300 ea. 3,300.00 <br /> 30 shrubs $17 ea. 510.00 <br /> TOTAL: $9,760.00 <br /> Seasonal Bus -stop type shelter options (A) <br /> and (B) <br /> (See attached) <br />