Laserfiche WebLink
CONTRACT ITEMS THIS PERIOD ;TOTALTO DATE <br /> ITEM <br /> NO DESCRIPTION UNIT QTY UNIT QTY AMOUNT QTY AMOUNT <br /> z PRICE <br /> 28 TRIANGULAR CONCRETE SECTIONS EA 2.00 475.00 2 950.00 2 950.00 <br /> 29 SODDING WITH TOPSOIL. SY 2750.00 1.35 685 924.75 2685 3,624.75 <br /> 30 ADJUST MANHOLE CASTING EA 7.00 150.00 7 1,050.00 7 1,050.00 <br /> 31 ADJUST MH CASTING •FW OVERLAY EA 1.00 120.00 1 120.00 1 120.00 <br /> 32 ADJUST GATE VALVE BOX EA 2.00 90.00 5 450.00 5 45000 <br /> 33 ADJUST GATE VALVE BOX OVERLAY EA 2.00 90.00 2 180.00 2 180.00 <br /> 34 F I CASTING SANITARY SEWER EA 6.00 250.00 6 1,500.00 6 1,500.00 <br /> 35 HYDRANT AND VALVE EA 1.00 3500.00 0 0.00 0 0.00 <br /> 36 GRADATION CLASS 5 EA 6.00 70.00 0 0.00 0 0.00 <br /> 37 GRADATION SELECT GRANULAR BORROW EA 2.00 70.00 0 0.00 0 0.00 <br /> 38 INPLACE DENS MOIST AGG BASE EA 7.00 60.00 0 0.00 0 0.00 <br /> 39 INPLACE DENSITY EMBANKMENT EA 7.00 60.00 0 0.00 0 0.00 <br /> 40 BIT EXTRACTION AND GRADATION -BASE EA 1.00 85.00 0 0.00 0 0.00 <br /> 41 BIT EXTRACTION AND GRADATION -WEAR EA 1.00 85.00 0 0.00 0 0.00 <br /> 42 AIR VOIDS BASE COURSE (Laboratory) EA 2.00 55.00 0 0.00 0 0.00 <br /> 43 AIR VOIDS WEARING COURSE (Laboratory) EA 2.00 55.00 0 0.00 0 0.00 <br /> 44 BIT BASE DENSITY SPECIFIED DENSITY EA 3.00 55.00 0 0.00 0 0.00 <br /> 45 BIT WEAR DENSITY SPECIFIED DENSITY EA 3.00 60.00 0 0.00 0 0.00 <br /> 46 CONCRETE -AIR ENTRAINMENT EA 14.00 35.00 0 0.00 0 0.00 <br /> 47 CONCRETE-SLUMP EA 14.00 35.00 0 0.00 0 0.00 <br /> 48 CONCRETE- CYLINDERS IN SETS OF 3 EA 7.00 35.00 0 0.00 0 0.00 <br /> T SCHEDULE 8.0 FALCON WOODS STREET CONSTRUCTION -TOTAL 27,742.93 124,949.67 <br /> SCHEDULE 9.0 FALCON WOODS AREA SANITARY SEWER REPLACEMENT <br /> 1 REM. AND REPLACE 8" SANITARY SEWER LF 150.00 75.00 0 0.00 104.5 7,837.50 <br /> 2 8 X 6 WYES EA 2.00 50.00 0 0.00 2 100.00 <br /> 3 6' SERVICE PIPE LF 40.00 15.00 0 0.00 13.5 202.50 <br /> 4 CONNECT TO EXIST. SAN. SEWER MH EA 2.00 500.00 0 0.00 2 1,000.00 <br /> 5 TRENCH COMPACTION DENSITY TESTS EA 28.00 40.00 0 0.00 0 0.00 <br /> T SCHEDULE 9.0 FALCON WOODS AREA SANITARY SEWER REPLACEMENT -TOTAL 0.00 9,140.00 <br /> CHANGE ORDER NO. 1 <br /> FORD STREET STORM SEWER LS 1 1,600.00 1.00 1,600.00 1.00 1,600.00 <br /> REMOVE CONCRETE CURB AND GUTTER LF 243 1.25 264.00 330.00 264.00 330.00 <br /> REMOVE CONCRETE SIDEWALK SF 1672 0.25 1,475.00 368.75 1,475.00 368.75 <br /> 8618 CONCRETE CURB AND GUTTER LF 243 4.42 264.00 1,166.88 264.00 1,166.88 <br /> 4" CONCRETE WALK SF 1520 1.52 1,475.00 2,242.00 1,475.00 2,242.00 <br /> SODDING WITH TOPSOIL SY 200 1.35 231.00 311.85 231.00 311.85 <br /> CUT AND PATCH SY 210 i 2.00 316.70 3,800.40 316.70 3,800.40 <br /> TACK COAT GAL 150 2.20 125.00 275.00 125.00 275.00 <br /> 2341A WEAR COURSE TON 250 28.60 203.87 5,830.68 203.87 5,830.68 <br /> CHANGE ORDER NO. 1 -TOTAL 15,925.56 15,925.56 <br /> SCHEDULE 11.0 EXTRA WORK HOYT PATCH <br /> 1 TYPE 41A WEAR TON 50 21.70 50.00 1,085.00 50.00 1,085.00 <br /> SCHEDULE 11.0 EXTRA WORK -HOYT PATCH -TOTAL 1,085.00 1,085.00 <br />