My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCAgenda_94Jan12
FalconHeights
>
City Council
>
City Council Agenda Packets
>
199x
>
1994
>
CCAgenda_94Jan12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 12:35:45 PM
Creation date
11/10/2010 12:35:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e_ <br /> CERTIFICATE OF SUBSTANTIAL COMPLETION <br /> OWNER's Project No. ENGINEER's Project No. 330- 028 -30 <br /> Project Falcon Heights 1993 Street Improvements <br /> CONTRACTOR F.M. Frattalone Excavating and Grading, Inc. <br /> Contract For 1993 Street Improvements Contract Date May 27. 1993 <br /> This Certificate of Substantial Completion applies to all Work under the Contract Documents applies to all Work <br /> under the Contract Documents or to the following specified parts thereof: <br /> This Certificate of Substantial Completion applies to all utility improvements, grading, aggregate base, <br /> bituminous surfacing, concrete work, and turf establishments. <br /> To City of Falcon Heights OWNER <br /> And To F.M. Frattalone Excavating Grading, Inc. <br /> CONTRACTOR <br /> The Work to which this Certificate applies has been inspected by authorized representatives of OWNER, <br /> CONTRACTOR, and ENGINEER, and that Work is hereby declared to be substantially complete in <br /> accordance with the Contract Documents on <br /> October 22, 1993 <br /> DATE OF SUBSTANTIAL COMPLETION <br /> A tentative list of items to be completed or corrected has been previously provided to the contractor. This <br /> list may not be all inclusive, and the failure to include an item in it does not alter the responsibility of <br /> CONTRACTOR to complete all the Work in accordance with the Contract Documents. The items in the <br /> tentative list shall be completed or corrected by CONTRACTOR within days of the above date of <br /> Substantial Completion <br /> Most remaining punch list items are turf related and shall be completed by May 15, 1993. <br /> EJCDC No. 1910 -8 -D (1983 Edition) <br /> Prepared by the Eruureeri Joint Cannot Dcourecets Co®ittee and endorsed by The A.aoc to General Cannanore or America. <br />
The URL can be used to link to this page
Your browser does not support the video tag.