My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCAgenda_94Jun22
FalconHeights
>
City Council
>
City Council Agenda Packets
>
199x
>
1994
>
CCAgenda_94Jun22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2010 11:57:54 AM
Creation date
11/12/2010 11:57:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT OBJECTIVES <br /> To develop an image for Larpenteur Avenue which draws from the <br /> unique and significant urban design and natural resource elements <br /> that frame it. <br /> To create linkages across the street which minimize the impact of <br /> Larpenteur Avenue as a barrier. <br /> To minimize the potential adverse impacts of an improved <br /> Larpenteur Avenue on adjacent land uses. <br /> To bring the public and representatives of major corridor elements <br /> into the process as active participants. <br /> WORK PROGRAM <br /> Phase 1 Streetscape Plan <br /> Phase 1 will include the following: <br /> 1. A broad corridor evaluation including photoanalysis and <br /> mapping, to develop an understanding of the relationship of <br /> the corridor to its surroundings and identify areas that may <br /> offer streetscape opportunities or require special treatments to <br /> minimize roadway impacts. <br /> 2. The conduct of individual meetings (3 estimated) with key <br /> players including the University of Minnesota, the City of <br /> Falcon Heights, the Fair Board, Coffman representatives, and <br /> representatives of the Gibbs Farm and School to generate con <br /> cepts and ideas which relate to each and solicit project support <br /> and understanding. <br /> 3. The formulation of streetscape plans and alternative concepts <br /> for focus areas including street lighting, pavement treatments, <br /> bus stops, landscaping, grading, entries and signage elements. <br /> Final streetscape plans, at a schematic design level will be <br /> performed on AUTO CAD. <br /> Proposal Larpenteur Avenue Streetscape Plans Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.