HomeMy WebLinkAboutCCMin_82Mar9_Public_HearingP4INUTE`~
PUBLIC HEARING ON STREET IMPROVEMENT
PROJECT N0. 4449
MARCH 9, 1982
Mayor Warkentien, Councilmembers Eggert, Larson, Ciernia and Chestovich PRESENT
Also present were Clerk Administrator Barnes, Engineer Lemberg and
Fiscal Consultant Chenoweth.
None. ABSENT
Mayor Warkentien opened the Public Hearing at 7:00 p.m. and presented
the Affidavit of Publication, Affidavit of Posting and the Certificate
of Mailing. He then turned the floor-over to Engineer Lemberg who
introduced Engineer Glenn Cook.
~~
Engineer Cook explained that the proposed project has been divided ENGINEER C00
into seven separate parts in order to allow-the City to make the
decision to repair the entire area or only individual projects as
deemed necessary. He then explained each of the projects and the type
of construction to be done in each instance.
Fiscal Consultant, Phil Chenoweth, explained costs directly related to
each project and estimated costs which would be assessed to home-
owners in each area. He also indicated that the bond market is some-
what improved at the present time which would be an advantage to the
city.
Robert Fry, 1457 W. Iowa, speaking for a group of_neighbors, stated he
had read the Engineer's report and his understanding was that the
assessments would range from $450 to $4,500 per homeowner. He spoke
of the State finance problems and was of the opinion that local costs
will go up due to State finances. He also stated that they have never
had a drainage problem, the streets are in good shape compared to
other suburbs and St. Paul, and that he is against the proposed project.
FISCAL AGENT
CHENOWETH
ROBERT FRY
1457 W. IOWA
Bob Dobin, 1362 W. Larpenteur, inquired why people should have to pay BOB DOBIN
for a storm sewer when it would not alleviate the problem in the alley 1362 W.
back of his residence (ponding of water) caused by the alley being too LARPENTEUR
low and Hamline too high. He also commented on flooding of Larpenteur
Avenue near Fry Street and that fact that nothing has been done about
that. He indicated he was opposed to the project.
Chuck Sederberg, 1452 W. Idaho, wanted to know the costs of streets
in front of the homes plus the $12.00 per foot for the north/south _
streets. Engineer Cook went.thr~augh the estimated assessments for
a 50 foot lot in each of the seven projects. Mr. Sederberg inquired of
the Fiscal Consultant what his total payments would be for principal
and interest at 13~ over the ten year period on his property which
would be assessed $3,560. Mr. Chenoweth replied that the total paid
over ten years would be $6,560.
Henrietta Thom, 1402 W. Idaho, suggested that Council wait until
interest rates are down and the price could be lowered. She was
concerned about how people could pay for the project.
J. B. Rechtine, 1492 W. California, said he felt the streets have
always been fine and inquired as to why it needs to be done. He
felt the project is being proposed at the wrong time in view of the
CHUCR
SEDERBERG
1452 W.
IDAHO
AENRIETTA
THOM, 1402
W. IDAHO
J. B.
RECHTINE
1492 W.
CALIFORNIA
MINUTES ~ ~
PUBLIC HEARING
MARCH 9, 1982
PAGE 2
large increase in property taxes this year. He is against the project RECHTINE
as during a recession is the wrong time for this type of project. (cont.)
Engineer Lemberg explained that the report was done due to the con- ENGINEER
dition of the streets and the high cost of patching and repair. The LEMBERG
streets are 25 years old and in that length of time streets do break
down. He explained that the lack of curb and gutter contributes to
break down as the boulevards wear back causing the street surfacing to
crack. With the north/south streets, which are particularly bad, he
felt it might be more economical to do the job properly once than the
constant repair. He also explained that many of the streets have no
base but have blacktop laying on clay.
James Jernberg, 1540 W. Iowa, inquired as to why the improvement is JAMES
necessary and why attempt the project in 1982 which is a difficult JERNBERG
time to thrust more expenses on everyone. He wondered-how different 1540 W.
lives would be if the streets are improved causing a possible short- IOWA
age of cash for other needs. He appealed to Council not to go through
with the project.
Charley Stone,1375 W. Idaho, explained that in his block there are CHARLEY STOP
7 widows, 2 widowers and 2 married retirees, all of whom live on 1375 W.
fixed incomes and they cannot afford the cost of street repairs. IDAHO
Marvin Kotilnek, 1453 W. Iowa, stated he is a Ramsey County Road MARVIN
Maintenance Engineer and that, in his opinion, many thoroughfares KOTILNEK
in Ramsey County are in worse shape than streets in Falcon Heights, 1453 W.
and if it is less expensive to reconstruct streets than to sealcoat IOWA
and patch the County would be reconstructing rather than patching.
He felt that if the sealcoating and patching of streets is continued
the streets will hold up.
Mr. Kotilnek also questioned the need of the storm sewer as he did
not know of any flooded intersections or basements in the area.
Charles Ready, 1459 W. Iowa, stated he felt the streets are in good CHARLES
shape, is a bad time to assess when property taxes are going up, READY
money should not go into streets, priority is schools and decreasing 1459 W.
burglaries in the neighborhood, and that the dips and pot holes slow IOWA
town traffic.. He then presented a petition from residents opposing
the street construction.
John Ring, 1364 W. Idaho, stated he felt the streets are good and JOHN RING
that he has never complained. He did not feel adequate need has 1364 W.
been demonstrated. He, too, felt the uneven street is an advantage IDAHO
and he urged the Council to re-think the matter as it would be a
hardship on the population.
Milt Craighead, 1365 W. Iowa, commented on the fact that St. Paul MILT
may require residents to discontinue directing run off from buildings CRAIGHEAD
into the storm sewer and suggest that the run off water go on to the 1365 W.
lawn to water lawns. Mr. Craighead wanted to know why the City is IOWA
talking of a storm sewer to put more run off water into a sewage
system that St. Paul feels is overstrained.
MINUTES
PUBLIC HEARING
MARCH 9, 1982
PAGE 3
Marvin Flodin, owner of apartment buildings at 1466 W. Larpenteur,
1561 W. Idaho and 1624 Snelling Drive, stated owners are constantly
being hit by taxes and now the City if talking of assessments. He
indicated he could not find a need for the proposed improvements, as
the streets and storm water facilities seem to be adequate. He agreed
with the other speakers and urged Council to think seriously before
voting on the matter.
Howard Christiansen, 1452 W. California, felt the streets were in the
best condition he had ever seen and that the dips are appreciated
as they slow down the traffic. He stated that people in the community
do not mind them. He also indicated he lives at the highest point
and could not understand why he would be assesed for storm sewer
and he cannot see why he would benefit. He did not want any more
taxes.
Bill Smith, 1358 W. Iowa, informed that he works in real estate and
banking and that the proposed improvements would not increase the
property values, but would only increase taxes. He stated-that in
appraising a house the improved street would not add to the value
of the house. Mr. Smith requested that Council be receptive to the
people.
Jerry Meyer, 1391 W. California, commented on the alley back of his
his residence, would like it repaired, however, did not feel the
proposed contstruction would improve the drainage of the alley.
Bev Dobin, 1362 W. Larpenteur, also commented on the fact that
Hamline Avenue drains into the alley. She wanted to know-what the
cost would be to people on Larpenteur since Larpenteur has already
been constructed. Engineer Lemberg explained that at the time
Hamline was repaired the County was requested to lower Hamline to
alleviate drainage into the alley, however, the County refused.
At that time Hamline was to be widened but residents objected as
they did not want to loose their trees.
MARVIN
FLODIN,
OWNER OF APT
AT 1561 IDAH
1624 SNELLIN
& 1466 W.
LARPENTEUR
HOWARD
CHRISTIANSEN
1452 W.
CALIFORNIA
BILL SMITH
1358 W.
IOWA
JERRY MEYER
1391 iJ.
CALIFORNIA
BEV DOBIN
1362 W.
LARPENTEUR
Paul Manke, part owner (with his father) of the home at 1464 W. Idaho, PAUL MANKE
stated he vehemently opposed the project. He commented on the fact 1464 W.
that there were puddles on Idaho between Arona and Pascal before IDAHO
construction and there still are puddles. He could see no real
change.
Patrick Lamey, 1485 W. Hoyt, wanted to know about the construction
of Arona a few years ago and how that was paid for. Engineer Lemberg
explained that the street was built with MSA funds and the .storm sewer
was assessed to the benefitting property owners.
Henrietta Thom inquired as to whether or not residents could pay for
filling holes or do it themselves. She stated they put in their own
sidewalk and it is the best in the block.
Pat Kelley, 1402 W. Larpenteur, stated that Albert, which is on the
east side of his property, is in a state of disrepair. He inquired
as to what will be done with Albert if the reconstruction project
is not approved.
PATRICK
LAMEY
1485 W.
HOYT
HENRIETTA
THOM
PAT KELLEY
1402 W.
LARPENTEUR
MINUTES .~ r/
PUBLIC HEARING 'G
MARCH 9, 1982
PAGE 4
Engineer Lemberg explained that Albert has no base under it and it BRAD
would be difficult to repair due to alligatoring. He stated that LEMBERG
the decision is up to Council.
Councilmember Eggert stated that if there are some streets that are COUNCILMEMBE
high cost to repair, perhaps, Council should look at those streets EGGERT
only. He requested that the Engineer provide information comparing
the cost of repairs on an annual basis to complete construction. He
also inquired what cost differentials would be involved in doing the
project on a one piece basis as opposed to doing all in one project.
Councilmember Ciernia asked the Engineer if he could project, on high COUNCILMEMBE
cost streets, what it would cost in the future if waiting 2 to 5 years CIERNIA
for construction.
Engineer Lemberg stated he would check his records to see what has BRAD
been spent. He expressed the opinion that construction costs 3 LEMBERG
years from now would, probably, go up as they have been experiencing
an 8~ increase per year for the past 8 to 10 years.
Engineer Cook informed that bids in 1981 were approximately the same GLENN COOK
as in 1982 and sometime in the future it will catch up.
Engineer Lemberg stated that they have been experiencing good bids BRAD LEMBERG
due to the fact that contractors are in need of work.
Councilmember Chestovich moved, seconded by Councilmember Larson, CHESTOVICH
that the subject be tabled to a later date for future discussion MOTION TO
by Council. Following a short discussion the motion was withdrawn. TABLE WITH-
DRAWN
Mayor•Warkentien closed the Public Hearing at 8:43 p.m. MEETING
CLOSED AT
8:43 P.M.
~~~
Willis C. A. Warkentien, Mayor
Att ,t:
~ -~/
Dewan B. Barnes, Clerk Administrator
Public Hearing on Street Improvement Project No. 4449, March 9, 1982