HomeMy WebLinkAboutCCMin_78Apr12MINUTES
REGULAR CITY COUNCIL MEETING
APRIL 12, 1978
A regular meeting of the Falcon Heights City Council
was called to order at 7:30 p.m. by Mayor Warkentien.
Mayor Warkentien, Councilmembers Black, McGough, Steele
and Brown. Also present were Clerk Administrator
Barnes, Attorney Kenefick and Engineer Lemberg.
None.
Councilman Black moved, seconded by Councilman McGough
to approve the Consent Agenda as follows:
1. Fire & Rescue Reports 29 to 35
2. General Disbursements in the amount of $4,308.87
3. General Payroll in the amoun t of $4,140.75
4. Liquor Disbursements in the amount of $22,407.01
5. Liquor Payroll in the amount of $1,941.02
6. Buildin g Inspectors report - Feb. & March
Upon a vote being taken the following voted "aye": Mayor
Warkentien, Councilmembers Black, McGough, Steele and
Brown the following voted "nay": None. Motion carried.
Councilperson Brown discussed the organization of a
Senior Citizen Group for Falcon Heights. The main
problem at this time is a place to meet, there is a
possibility of meeting in the Falcon Heights United
Church of Christ as long as it is a non-profit organiza-
tion. Councilperson Brown reported she had attended
meetings of the North Suburban Senior Citizens Council
and was asked if she would represent Falcon Heights.
Councilman Steele suggested that Falcon Heights work
collectivly with other organizations to put together
a program for senior citizens. Councilman Black
concurred with Councilman Steele's suggestion.
Mayor Warkentien called to order at 8:00 p.m. the
public hearing for Hollywood Court Street and Alley
Curb & Gutter Improvement Assessment Hearing, with
the following members present: Mayor Warkentien,
Councilmembers Black, McGough, Steele and Brown. Mayor
Warkentien read the legal notice of the public hearing
to those present. Total cost of the improvement to be
assessed is $31,238.86. Clerk Administrator Barnes
gave a run down of the costs, engineering was $4,30.1.22
legal to date was $92.63, printing & publishing $117.44,
total being $39,238.66. At previous action by council,
the council had requested that $8,000.00 be used of the
general funds to subsidize this improvement, therefore
the total is $31,238.86 or $26.63 per front foot.
't
PRESENT
ABSENT
CONSENT AGENDA
SENIOR
CITIZEN GROUP
HOLLYWOOD CT.
ASSESSMENT
MINUTES
REGULAR CITY COUNCIL MEETING
APRIL 12, 1978
Page 2
Engineer Lemberg reported they had excellent co~
operation on the Hollywood Court project. Quantities
used for Hollywood Court were: bituminous 210 tan
estimated, actual 225 ton, concrete curb & gutter,
estimated 1,305 ft, actual 1,335 ft., the excavation
orginally estimated at 700 cu. yds., actual 400 cam,. yds.
So all the quantities were close to the estimate and
in some cases under. The alley portion was slightly
.over, a couple bad spots caused removal of extra
material, to make the alley last longer. The gravel
base ran slightly under. Materials used came very
close to the estimated quantities. Engineer Lemberg
invited any questions on the completed project.
Mayor Warkentien reported the council had walked the
Hollywood Court project on April 3rd, 1978 and was
pleased with the results:
Clerk Administrator Barnes informed interested parties
that the assessment could be paid within 30 days with-
out an interest charge, prior to submitting the assess-
ment to the County Auditors office, or they could let
it run to full term as set by council at an 8o interest
rate on the unpaid balance.
Councilman McGough moved, seconded by Councilman Black
that the assessment roll for the improvements of 1977
on Hollywood Court be adopted and that the assessment
be spread over a ten year period. Upon a vote being
taken the following .voted "aye": Mayor Warkentien,
Councilmembers Black, McGough, Steele and Brown the
following voted "nay": None. Motion carried.
Mayor Warkentien reminded the audience the assessment
could be paid within the next 30 days at City Hall,
after which it will be filed at the county auditors
office downtown. Mayor Warkentien thanked the people
in attendance for their cooperation during the improve-
ment project.
Attorney Kenefick reported to the people in attendance
that they do have 20 days to file notice of appeal in
district court according to state statutes, if there
is an objection to the amount assessed.
4
Mayor Warkentien discussed the spring clean-up dates SPRING CLEAN-
for Falcon Heights residents. It was suggested that UP DATE
May 6 through May 14, 1978 would be suitable. Council-
man McGough moved, seconded by Mayor Warkentien to
approve the above dates. Upon a vote being taken, the
following voted "aye1°: Mayor Warkentien, Councilmembers
Black, McGough, Steele and Brown the following voted "nay":
None. Motion carried.
MINUTES
REGULAR CITY COUNCIL MEETING
APRIL 12, 1978
Page 3
Council discussed with residents their problems
concerning the clean-up dump site. It was suggested
by some residents to move the dump to another area
and not use the present site. It was decided by
Council to see how things go this spring, if it is
decided there is a problem, a new site will be discussed.
Councilman McGough offered to donate a gate for the
impounding area. Dr. William Schultz, 1630 Hollywood
Court requested we look for another site.
Clerk Administrator Barnes presented additional infor-
mation regarding the application for a General Corp.
license from Howard Merrill as requested by council at
the March 22, 1978 meeting. Councilman Black reviewed
the information, and explained the company replaces
items lost, stolen, etc., as reported by insurance
companies. They carry no stock on hand, they order and
ship from other. sources. Councilman Black moved approval
of General Corporate License #447 (new) for Howard
Merrill, Inc. 1550 W. Larpenteur, seconded by Council-
man Steele. Upon a vote being taken the following voted
"aye": Mayor Warkentien, Councilmembers Black, McGough,
Steele and Brown the following voted "nay": None. Motion
carried.
Clerk Administrator Barnes presented a quotation from
Flexible Pipe Tool Company for a sanitary sewer roder.
With the purchase fo the machine we would not have to
hire outside help to maintain the city's main sewer
lines, and will enable us to maintain our system at
a lower cost. The total cost of the equipment is
$5,145.00. Mayor Warkentien moved approval of the
purchasing of the sanitary sewer roder at $5,145.00
subject to other quotations being received, seconded
by Councilperson Brown. Upon a vote being taken the
following voted "aye": Mayor Warkentien, Councilmembers
Black, McGough, Steele and Brown the following voted
"nay": None. Motion carried.
Engineer Brad Lemberg reported that we had sent in a
request for designation of Roselawn Avenue for State
Aid, and taking the designation off Pascal, between
Hoyt to Larpenteur, adding the designation to Roselawn,
Cleveland to Snelling Avenue. This was approved by
the Commissioner of Transportation, authorizing
the change and designating Roselawn a joint municipal
state aid street. We can go ahead with the plans to
up grade Roselawn Avenue, joining with Roseville and
Ramsey County on their portion of Roselawn Avenue.
Councilman Steele questioned whether public hearings
would have to be held prior to construction on Rose-
lawn Avenue. Engineer Lemberg suggested that an
informational meeting be held to inform the people on
Roselawn Avenue what is being proposed and get their
input. No assessments are being levied.
~~
DISSCUSSION
OF HOLLYWOOD
COURT
RESIDENTS
AGAINST CLEAN-
UP DUMP SITE
HOWARD MERRILL
CORP. LICENSE
SANITARY SEWER
RODER QUOTE
ROSELAWN AVE.
STATE DESIG-
NATION
n
I II~
LJ
1
MINUTES
REGULAR CITY COUNCIL MEETING
APRIL 12, 1978
Page 4
Mayor Warkentien called to order at 9:00 p.m. the
public hearing of the St. Anthony Storm Sewer and
introduced Mr. Greg McElroy, from the Ramsey County
Grant Society to those residents in attendance.
~~
ST. ANTHONY
STORM SEWER
PUBLIC HEARING
Mr. McElroy addressed the council and audience and MR. GREG
explained what can be expected from federal agencies. McELROY-
If we intend to go on with this project, we are going RAMSEY COUNTY
to be in competition with other communities. He also GRANT SOCIETY
stated he had attended a meeting with HUD and 900 of
the communities were looking for storm sewer monies.
The proceedure and basic information behind this and
the agency we are dealing with (Housing 8 Urban Develop-
ment) is Title 1 of the Housing and Community Develop-
ment Act of 1974 and Title 1 of the Housing and Community
Development Act of 1977.
In order to get this grant, they have a pre-application
requirement. We compile this application, submit it to
HUD and Metro Council and after review, we will find out
if we are eligible to go into completing the application.
Pre-application steps:
1. Standard Federal Form with basic information.
2. Narrative section - specific needs or problem
in the community.
3. Citizen participation certificate - Two public
hearings noted, views are asked of public and
priorities along these lines.
Provided we are ranked high enough after pre-application,
we will be asked to submit a completed final application,
which will be in more detail.
There are two types of program, but we are going into only
siQ~gle purpose type grants. The money set aside for these
programs are 3.4 million dollars. Of this 3.4 million 1.2
million has been set aside for single purpose type grants,
the grant we will be applying for.
The grant will be given on the number of priorities, the
main ones that must be determined are:
1. Benefit this project is going to have to low and
moderate income people, moderate income based on
800 of average income in a certain area-
2. Will this project prevent slums or blight.
3. Does it meet other community development needs,
having a particular urgency and this can be proven
over the past ten years, lack of this sewer is
indeed a problem in this area, which has presented
a health hazard, safety hazard and has held back
development in this area.
MINUTES
REGULAR CITY COUNCIL MEETING
APRIL l2, 1978 - Page 5
The amount that we are requesting through the grant
is approximately $750 thousand dollars, which will
cover a portion of the project, but not the total
cost. We hope the U of M, State Fairgrounds and
other sources of funds will complete the remaining
portion of the project. The pre-application has to
be submitted between May 1, 1978 and May 15, 1978.
We will have another public hearing on April 26, 1978.
Councilman Steele asked if Lauderdale, Roseville or
any abutting our area, must they be accepted also at
the same time as we would be in the total wide area?
Could we be turned down if the U of M does not go
along with the project?
I~~
L_~_:
f
Mr. McElroy-reported that in order to get the ~~ant
monies, we have to prove the entire project would
be funded.
Clerk Administrator Barnes reported he had had
meetings with the State Fair staff and U of M and
they did not object to it and they felt they had an
obligation because they do have drainage. The engineer
will relate the figure they would have to come up with,
the U of M has to go to the Legislature for monies and
this will be presented to the Regents next month.
4~
ST. ANTHONY
STORM SEWER
(CONT.)
Mr. McElroy
Clerk Adminis-
trator Barnes
Engineer Lemberg described the project and outlined the ENGINEER BRAD
area involved on the map. The area we are talking LEMBERG
about is bounded by the U of M, coming up to the west
area of the Falcon Woods area, down to Larpenteur Ave.
Across the north side there was an assessment for the
north tier of Falcon Woods and the properties abutting
Roselawn Avenue and the N.E. area of the University
property, that area drains into the storm sewer that
was built and partially paid for by Falcon Heights,
built by Roseville a few years ago. The line comes
down bisects part of Maple Knoll area and between the
back lot lines abutting Snelling and St. Mary's, picks
up part of the shopping center, N.E. corner of Snelling
and Larpenteur Avenues, comes across GTA property,
crosses part of the Hollywood Court area, picks up the
parking lot, fairgrounds and down to the tract area.
This all drains to the south at the present time through
natural drainage, and road ditches. There is a small pipe
down to the west border of the Falcon Heights City Hall area,
goes down and is picked up by an open drainage ditch the
fairgrounds constructed a few years ago, dumps into a pond
and then flows overland, runs down through the fairgrounds.
and University property into a pond near the student housing
area, SW corner.
MINUTES
REGULAR CITY COUNCIL MEETING
APRIL 12, 1978
Page 6
Some years ago St. Paul started the St. Anthony Storm
Sewer leg that was constructed as a tunnel all the way
to the river. That comes up parrallel to Eustis Avenue
and then swings across and at present stops at Como and
Stella. St. Paul has provided sufficient capacity for
draining this area into that, but there has been no
participation by the City of Falcon Heights at the present
time. I believe the University has paid a part of their
connection charge.
Basically what we are looking at then is a major line
picking up the area north of the Hermes Green House area,
the area south of Falcon Woods, down parallel to Lindig
Street which will also pick up the area that now floods
at the north end of Lindig Street and picks up over along
Fairview Avenue, east side of the University property, all
along Larpenteur Avenue, brought down by varying size
pipe, which as it goes down increases in size all the way
up to a 72" pipe. Down through the University property
and fairgrounds and then would connect down at Como and
Stella. This study has gone on for quite some time, I
think Mr. Nilsen, you remember about 15 years ago Toltz,
King and Duvall did the study for St. Paul and it has
been kicked around for a long time and up until the present
time with the possibility of this grant it has not been
.economically feasible for the City of Falcon Heights to
enter into the storm sewer program in this area because
of the extreme cost.
A rough breakdown at the present time, to drain this area,
it is estimated now that the Falcon Heights share is
$106,000, the University approx. $560,000, the State Fair-
grounds $200,000 and Ramsey County $100,000, giving us a
total cost of $1,500,000 in round numbers. I've got
Falcon Heights share at $636,000 if we were to receive a
grant of $750,000. So if we take the grant or if we receive
the grant of $750,000, it would still leave $424,000 for
the City to pay. If that entire cost was taken up, we have
looked at the possibility of utilizing the Minnesota State
Aid funds that the City does have available. We have checked
with the State Highway Dept. and have received their approval
on a tentative basis to use a part of the money that we have
available in that system on this particular project. We
would be utilizing the State Aid monies off the state aid
system, but because of the state aid roadways that are in
that, there is some drainage off those roadways. There is
also the county state aid road we could reduce, that amount
that ~f`alcon Heights would be required to pay would bring it
down to approx. $255,000.
The area that Falcon Heights is lokking at, contains 1,350
acres, breaking that down per acre it appears to be approx.
3.1~ per sq. ft., on an average 10,000 sq. ft lot, the
assessment would be around $300 to $310 per average lot.
This is all based on receiving participation on the same basis
from the U of M, Fairgrounds and Ramsey County.
MINUTES
REGULAR CITY COUNCIL MEETING J
APRIL 12, 1978
Page 7
I don't believe I was aware there was another charge JERRY NELSON
or assessment for this total storm sewer, the water UNIVERSITY ENGR.
shed area. We are involved in one at $500,000 some
odd dollars and not aware that we have another assess-
ment on our land when it was first consumated.
I believe Jerry, this was just the campus property. GREG McELROY
No, total contribution from the water shed area, JERRY NELSON
part of the golf course and at that time Univ. UNIVERSITY ENGR.
Grove and all the land in the field all figured in
their contiibution.
I'm not absolutly sure, as I said this came up ENGINEER .BRAD
quickly, a part of his cost here may already have LEMBERG
been covered by your portion. What I was talking
about was $636,000 of Falcon Heights share. Now a
part of that 1/2 million dollars listed here probably
covers that area of yours that is already included in
your assessment.
The breakdown between the fairground area and Univ.
area included in this drainage area and the City of
Falcon Heights area, that report was written up a
couple years ago and I'm going to have to go back to
them, I know it was based on rural runoff and not on
the commercial and residential runoff.
Why is this project being considered to be assessed AL RUBINGER
on a square footage instead of front footage?
Basically, it is a precedence that has been set up, ENGINEER BRAD
not only in this community, but in most areas that LEMBERG
is storm sewered, because a drop of rain falls on
every square inch, therefore the square footage
basis and not the front footage has been used. That
way, the fellow that has a very short front footage,
but two miles in back pays his fair share, rather
than the short front footage and also because ~+ if
part of that land is not developed, not touch a street
or anything, it has no front footage as such to assess.
Normally we put storm sewers on a square footage
rather than front footage.
The three we have had in the city so far have been MAYOR WARKENTIEN
on a square footage basis.
If we don't do this who suffers? AL RUBINGER
If we don't do this who suffers? That is a hard ENGINEER BRAD
question to answer, that is something that has been LEMBERG
looked into and has been requested as far as I can
remember, approx. 18 years in some areas. Storm
sewers always breeds the question why should I pay
for a storm sewer when I live on top of a hill and
it only helps the person at the bottom? In this
MINUTES
REGULAR CITY COUNCIL MEETING
APRIL 12 , 1978 ~:
Page 8
particular case, the answer would be that it would
allow development of additional properties, increase
the tax on some of the property and also takes the
water that runs off everyones' land.
Here I would like to emphasis something, no one here
at this table is pushing for something. This question
has been lying on the table or in a dark closet, it
has been a question over a long period of time, we have
pictures, etc. of flooded areas, that shouldn't happen
every year, but there is a need throughout the area for
storm sewers and the only reason it is being brought up
now is the possibility of getting federal aid and making
it economically feasible for the people who live in the
City of Falcon Heights. At the present time without
that kind of aid, it is not economically feasible.
H+Q~many acres would benefit by this? How many acres MELVIN SPIEGLER
go under water and can not be used? That is a basic
question, if you are going through all this. for 30
to 40 acres, it just does not pay. If is going to
save several acres, that I can understand.
I don't have an answer for that at this time, I ENGINEER BRAD
could come up with the answer later on, but is also LEMBERG
a benefit to all of you because your water and others
run off and floods someone else. The water all runs
to some point, it has to get away as the area increases
in saturation, there is going to be more run off, so
there is a benefit involved.
Is the cost effective? Does it really mean if we can MELVIN SPIEGLER
do this, everything will be great here? Are we
really going to release more water, people won't
have water in basements, etc? Is ther~a lot of
trouble in this area? Will we be able to put up
another shopping center in places that can't be used
now?
Again, I'd like to say, I'm not pushing any projects ENGINEER BRAD
here at all. However, there are some properties that LEMBERG
until `the storm sewer is available to take the run-
off, are not developable. One of them is the area
just north of Hermes Floral.
I'm not objecting, I would just like to know what MELVIN SPIEGLER
the difference will be, with or without the storm
sewer project. Could that information be gathered?
Yes, I am sure it can and I am sure that the City ENGINEER BRAD
office could probably put something together as to LEMBERG
what the benefit would be tax wise if those prop-
erties were able to be developed and the increase
of taxes to the City.-
MINUTES
REGULAR CITY COUNCIL MEETING
APRIL 12, 1978
Page 9
If you are going to do a little figuring on that,
would it be possible for you to get some figures
for some of the property owners, like myself and
Mr. Spiegler to see what our individual cost would
be and what you feel would be the benefit back in
taxes for the City and how would this affect us
because we happen to be large property owners
and we would probably be carrying a heavy burben
towards this, not us personally, it would be our
tenants.
A brief answer on that would be, I'd have to get
plats out and figure how much drainage you would
have and roughly how many square feet you have.
As it looks now, if it all goes, the type of thing
we put together, it would be approx. 3~ a square
foot, so if you have 40,000 square feet, you are
talking $1,200.
Is that spread over a period of time on the
menu?
Normally they are, yes.
AL RUBINGER
~~
ENGINEER BRAD
LEMBERG
assess- AL RUBINGER
Normally it goes 10 years, but can see no objection
to going 15 years. You do have water backed up on
your property at .this time don't you?
We have had it a little in the driveway this year,
as we normally do in one driveway.
I think one of the concerns we have is the ulti-
mate use of the property pointed out on the map,
east of Fairview and north of Larpenteur. I think
ultimately the University envisions uses of this
property. I think this has a bearing on this thing
as to the use, if-:they<redevelop that as residential
or University building, something like that, of course
it would necessitate having a storm sewer up in that
area. They are contributing runoff of course, and
would have to pay for it as well as the rest. I think
future projection is very important.
We did have a proposal at one time for the property
west of Tatum which was quite a concern as to where
the water would go. Of course residential property
built up, probably discharges more water than farm
land or nursery 1 and. Someday it is going to be
developed, there is no way it will stay this way for-
ever, but with shortage of land in the Twin Cities,
someday Mr Hermes and Mr. Hawkins will be disposing
of their properties in the foreseeable future. I
think we have to prepare for it and this is one way
we can look at it. I'm not advocating it, but I
think this is the first time we have been able to
talk of it with the chance of financial aid and
ENGINEER BRAD
LEMBERG
MAYOR WARKENTIEN
AL RUBINGER
HAROLD NILSEN
MAYOR WARKENTIEN
1
L
MINUTES
REGULAR CITY COUNCIL MEETING
APRIL 12, 1978
Page 10
maybe this is the time to do it. There will be hearings
of course as required by law.
Under the grant statute we do have to have two public
hearings, this being the first, the second being on
April 26, 1978, by so doing we conform to that part
of the grant fund stipulations and then we can make
our preliminary request.
HAROLD NILSEN
I want to go .back to the time before the village 1794 Tatum
was incorporated, back when it was part of Rose PAST HISTORY
Township. There is a storm sewer running along
Snelling Avenue, going north, I don't know just
where it terminates, but at that time they had an
opportunity, I think the southern terminal is
someplace around just east of the shopping center,
say about Crawford Avenue, but they didn't want to
participate with the State of Minnesota at that time.
Had they participated at that time you would have had
a larger pipe than .you do now going north to take care
of the storm sewer at that time. Now one of the things
That Ramsey County wanted during the construction of
Larpenteur Avenue back in '57 - '58 while I was on the
council, was to enter into a joint agreement with Falcon
Heights which would have extended that storm sewer over
to Lindig and at that time, the lowest elevation back
of John Keely's residence was 966, not the high water
area, the ponding area is 970. It was feasible and
Ramsey County would have constructed, along with our
paying our fair share of course, so we could have put
a storm sewer up at that time. I remember at that time
how wonderful it would have been if we could have done
it, but, the State of Minnesota came along with their
proposed grade seperation at Snelling and Larpenteur and
of course that stopped that project comple~ly. We could
not run storm water east then to the Hamline Avenue
county pit which ultimately goes into Lake Como, so there
were two chances over the years to do something about
this, the first one was lack of foresight in sizing up
this pipe through here (along Snelling), the other of
course, and I don't know why we can't and I'll ask our
attorney here, I think there should be some penalty
paid by the State of Minnesota because they obstructed
us from going down their right-of-way, I realize that
there is a problem with the waterway and that sort of
thing, but to go after the State of Minnesota and see if
we can't get some funds from them too. That would .have
solved the problem north of Larpenteur and immediatly
along Larpenteur Avenue, it wouldn't have taken care
of this area-down here obviously because the contours
were 979 and 989 through here and we go down through
here, so everthing drains down to this particular area,
as you can see on the contour map over here. So I just
wanted to point out a little bit of history about the
storm sewer problem. Now the only way we can go is
south. Unfortunatly it took so long before St. Paul
decided to put in this storm sewer and I don't know
~t)
MINUTES
REGULAR CITY COUNCIL MEETING _
APRIL 12, 1978
Page 11
just when they completed that down there, about two
years ago I guess, so it wasn't available for you
people, where the Stella Street junction comes in
is 150 feet deep and with costs today its really rough.
If any citizens over in that area have any pictures CLERK ADMINIS-
of flooding in the past years, could we get a copy TRATOR BARNES
or a negative so I can have pictures made. I need
them to support this application. We have to show
them there is a need.
We have a picture here of flooding in the fairgrounds MAYOR WARKENTIEN
a couple years ago and we asked if they had any in
the ponding area on Lindig Street which was quite
extensive. We do have some pictures but could use
some more.
Just so I get something clear, I think this was COUNCILMAN McGOUGH
mentioned by Brad, and one other individual that
there is no one at this table that is pushing for
this, however, I, as an individual am pushing for it
and received my letter as did everyone else.
Mayor Warkentien noted he would very much like to see MAYOR WARKENTIEN
it, but it is a costly project, but this is the time
to do it if we are going to do it at all, cost are
not going to go down.
It is going to come sooner or later and it might COUNCILMAN McGOUGH
as well come sooner, I'm in the construction
business and costs are not going down, again, I as
a private citizen would be paying my fair share of
the cost.
This is an unusual application because we are dealing CLERK ADMINIS-
with four different governmental units, the State TRATOR BARNES
Fairgrounds, the University of Minnesota, ourselves
and Ramsey County. So we really do want the support
of all those units. If we don't have that support,
we may as well forget the project. In answer to a
question raised, we are requesting a letter of in-
tent, we have to have it by the 15th of May, 1978.
Letters from citizens would also be helpful with
pictures, statement and other supportive data.
Councilman Black questioned the University's intent
of participation. Clerk Administrator Barnes noted
he hoped to have positive response before the 26th
of April meeting, otherwise a special meeting would
be required with citizen input. We are trying to
get all the meetings in before the 1st of May, 1978.
The next public hearing is scheduled for 9-:OO p.m.
April 26, 1978.
MINUTES
REGULAR CITY COUNCIL MEETING
APRIL 12, 1978
Page 12
Mayor Warkentien brought before council the dis-
cussion of the Falcon Heights School warming house
problems that had been tabled from the Mar.. 22, 1978
meeting. There had been a very high rate of van-
dalizam there. Councilmember Brown expressed her
view, she would hate to see it closed, there is
considerable usage of the rink. Mayor Warkentien
suggested the Recreation Advisory Committee look
into and discuss the situation. Discussion tabled.
Mayor Warkentien reported on the new liquor store
report as submitted by Yellen 8 Assoc. from the
computer printout. Council discussed the figures
shown on the report. Council requested Clerk
Administrator Barnes to check the various break-
downs on the reports. Discussion tabled pending
further information.
~~A
CON HEIGHTS
SOOL WARMING
HOUSE
JANUARY 1978
LIQUOR STORE
DISCUSSION
Clerk Administrator Barnes presented the State Aid STATE AID POLICE
report on Police proctection. Falcon Heights share CONTRACT
of State funds will be $8,051.95, which will be
applied to our policing contract. This is the first
time we have received this.
Fire Chief Jerry Renchin requested authorization
to put the old fire rig up for sale, the new truck
will go into service within the week. The salesman
who sold us the new truck has two fairly firm leads
on some communities that are interested in the truck.
Engineer Lemberg noted that Somerset, Wisc. was on
the market for used fire equipment. The department
is requesting at least $7,000 to $8,000 for the equip-
ment. This will cover the "B" bid monies that are
needed. Mayor Warkentien moved to have the Clerk
Administrator advertise for bids for the old fire
rig, Councilman Black seconded. Upon a vote being
taken, the following voted "aye": Mayor Warkentien,
Councilmernbers Black, McGough, Steele and Brown, the
following voted "nay": None. Motion carried.
The fire department is planning on sending two or
three members to the Minnesota State Fire School,
May 19 through 21, 1978 at the State Fairgrounds.
Fire Chief Renchin is looking mainly at rookies
to attend classes and pumping classes. The new
equipment will be on display, but will be posi-
tioned in such a manner as to be available for
calls.
FIRE DEPARTMENT
REPORT -
JERRY RENCHIN
FIRE SCHOOL
STATE FAIRGROUNDS
MAY 1978
Fire Chief Renchin discussed the damage of the side
door of the fire station, as it is in need of re-
placement or repair. The door was damaged by the
truck backing into the stall, the door had slid
down a few inches. Replacement of the door was
recommended over repair of the panel. A new door
would cost $512.00, to replace by section, $145 per
section. The price of replacement is half the regular
price as the company had the door on hand from a prior
FIRE STATION SIDE
DOOR DAMAGE REPORT
1
MINUTES
REGULAR CITY COUNCIL MEETING
APRIL 12, 1978
Page 13
order and not used. Councilman Steele moved, seconded
by Councilman McGough not to purchase a new door for
the fire station. The following voted "aye": Council-
members McGough, Steele and Brown the following voted
"nay": Mayor Warkentien and Councilmember Black.
Motion carried.
Fire Chief Renchin discussed holding an Open House for OPEN HOUSE
the new fire equipment. It was suggested that the open FIRE EQUIPMENT
house be held on the first weekend that the clean up
dump is open. Then the flyer for the clean up notice
would include the open house information that will be
passed out throughout the city.
Fire Chief Renchin reviewed the application made for AMBULANCE
the ambulance. At this time, they have not looked for
private .funding, as the application for federal funding
has not come through as yet. Fire Chief Renchin again
expressed the need for one in the city and feels the sheriff
squad is not adequate to handle the current type of
operation. The cost per run could be $35.00 to $40.00
per run. Also, the type of service that Unity provides
versus what we could provide for our people,plus cost
involved was .discussed. Rescue runs are up from last
year and continue to increase.
Mayor Warkentien noted the letter received from
Bonestroo, Rosene, Anderlik & Assoc., regarding the
engineering fee schedule. Councilman Steele moved
to table the discussion to the April 26th meeting
seconded by Councilman Black. Upon a vote being taken
the following voted "aye": Mayor Warkentien, Council-
members Black, McGough, Steele and Brown, the following
voted "nay": None. Motion carried.
Attorney Kenefick reported on the gas franchise (NSP)
No action taken.
ENGINEERING FEE
SCHEDULE
NSP GAS FRAN-
CHISE
Councilman Black brought out for discussion the public PUBLIC HEARING
hearing for the subdivision of Labalestra Park, the LABALESTRA PARK
Planning Commission met on the 10th of April, 1978
regarding the subdivision of Labalestra Park, it was
noted that Mr. Labalestra has the required surveys
Councilman Black moved publication of the public hearing
for May 10, 1978 at 8:00 p.m. subject to the Clerk
Administrator receiving the legal data required for
publication by May 1st, 1978, seconded by Councilmember
Brown. Upon a vote being taken the following voted "aye":
Mayor Warkentien, Councilmembers Black, McGough, Steele
and Brown the following voted "nay": None. Motion
carried.
MINUTES
REGULAR CITY COUNCIL MEETING
APRIL 12, 1978
Page 14
Councilman McGough reported that the fire truck was
being fitted with the ladder rack and mount. His
firm is doing the cutting and fitting. The work has
been donated by McGough Construction.
Councilman McGough reported he had met with Clerk
Administrator Barnes regarding the sign for City Hall.
He also talked with Mr Don Bemer, Shaw Lumber and they
have cut the price for cedar boards (2x12's) to a cost
of $182.00, The sign will be routed out by McGough
Construction and again at no cost to the city of Falcon
Heights.
Councilmember Brown reported on the recreation program
and again we are having a problem getting the girls
softball teams into a league. Lil Duethmann and
Councilmember Brown approached the community schools
program for help in locating a ,league to join. We
can get into Maplewood League, but it is a long way
out there. At the next meeting they will be putting
together something for the girls.
['
5 ~'
FIRE TRUCK
LADDER RACK
CITY HALL SIGN
RECREATION.
PROGRAM
Mayor Warkentien moved seconded by Councilman Steele MEETING
to extend the meeting to 11:15 p.m. Upon a vote being EXTENSION
taken the following voted "aye": Mayor Warkentien,
Councilmembers Black, McGough, Steele and Brown the
following voted "nay": None. Motion carried.
Councilmember Brown discussed the letter received from
MTC concerning the bus shelters for Falcon Heights.
They stated in their letter we should contact them
by May 1, 1978 regarding shelters for this area. A
shelter was suggested for the stop at GTA, but we do
not meet the required 40 people a day at the stop.
No action taken.
Councilmember Brown brought up the problem of motor
bikes being ridden on the school grounds while children
are playing and causing a hazard. After the police are
notified and the time they get there the bikes are gone.
It was suggested the police be contacted for patrol
after school hours and around dusk. Councilman McGough
will check into the problem being the council's liaison
to the police department.
MTC BUS
SHELTER
MOTOR BIKES ON
SCHOOL GROUNDS
Mayor Warkentien moved seconded by Councilman Steele MEETING
to extend the meeting to 11:30. p. m. Upon a vote being EXTENSION
taken the following voted "aye": Mayor Warkentien,
Councilmembers Black, McGough, Steele and Brown the
following voted "nay": None. Motion carried.
[l
1
MINUTES
REGULAR CITY COUNCIL. MEETING
APRIL 12, 1978
Page 15
Councilman Steele reported on the Park Development
Committee meeting and using the chalk board described
the things they would like to consider being done for
our parks, such as basketball backboards, volley ball
courts, repair of tennis courts and nets, racquet ball
court, grade the area and put in posts or railroad ties
to keep cars off the boulevard. Also, they would like
four more people on the committee. The next meeting
is scheduled for April 25, 1978 at 7:00 p. m.
Councilman Steele also brought up for discussion for
the tree committee a proposal for consideration of
about 20 trees for along the walkway and ponding area.
5~
PARK DEVELOP-
MENT COMMITTEE
Moved by Mayor Warkentien, seconded by Councilman McGough MEETING.
to extend the meeting to 11:45 p.m. Upon a vote being EXTENSION
taken the following voted "aye": Mayor Warkentien,
Councilmembers Black, McGough, Steele and Brown and the
following voted "nay": None. Motion carried.
Councilman Steele reported the committee had come up PARK DEVELOP-
with an estimated cost of $1,500 to $2,000 for the MENT COMMITTEE
total project.
Clerk Administrator Barnes asked council if they reecived RAMSEY COUNTY
their copies from the Ramsey County League. Their LEAGUE
annual meeting has been changed.
Clerk Administrator Barnes reported that Wm. Garlick UNEMPLOYMENT
former maintenance man had been awarded benefits for BENEFITS
unemployment, based on only one incedent. He also WM. GARLICK
stated he will appeal the Kelly claim.
Councilman Steele moved, seconded by Councilman Black ADJOURNMENT
to adjourn the meeting at 11:40 p.m. Upon a vote
being taken the following voted "aye": Mayor Warkentien,
Councilmembers Black, McGough, Steele and Brown the
tollowing voted "nay": None. Motion carried.
i ~. J/ ,
~i~-~C~-C,~L'~O 1. - ~.%, l/~r' -2C~~7
WILLIS C.A. WARKENTIEN, MAYOR
Attest:
~~~~CU-~~r/
wan B. Barnes, Clerk Administrator