HomeMy WebLinkAbout06-23-2021 Regular Meeting
CITY OF FALCON HEIGHTS
Regular Meeting of the City Council
City Hall
2077 West Larpenteur Avenue
AGENDA
June 23, 2021 at 7:00 P.M.
NOTE: THIS MEETING WILL BE HELD BY WEB CONFERENCE*
A. CALL TO ORDER:
B. ROLL CALL: ANDREWS ___ GUSTAFSON____ LEEHY___
MIAZGA ___ WEHYEE___
STAFF PRESENT: THONGVANH____
C. PRESENTATION
D. APPROVAL OF MINUTES:
1. May 26, 2021 City Council Regular Minutes
E. PUBLIC HEARINGS:
1. MS4 Annual Report
F. CONSENT AGENDA:
1. General Disbursements through: 6/16/21 $186,874.03
Payroll through: 6/15/21 $19,419.73
G: POLICY ITEMS:
1. 2021 Pavement Management Project (PMP) Change Order #1 and Pay Estimate #1
H. INFORMATION/ANNOUNCEMENTS:
I. COMMUNITY FORUM: Please limit comments to 3 minutes per person. Items brought before the Council will be referred for
consideration. Council may ask questions for clarification, but no council action or discussion will be held
on these items.
J. ADJOURNMENT:
*You can participate in the meeting by clicking the following Zoom link:
https://us02web.zoom.us/j/81446634622
Toll Free Number:
1-877-853-5247
1-888-788-0099
Webinar ID: 814 4663 4622
BLANK PAGE
1 | Page
CITY OF FALCON HEIGHTS
Regular Meeting of the City Council
City Hall
2077 West Larpenteur Avenue
MINUTES
May 26, 2021 at 7:00 P.M.
A. CALL TO ORDER: 7:02 PM
B. ROLL CALL: ANDREWS ___ GUSTAFSON__X__ LEEHY_X__
MIAZGA _X__ WEHYEE_X__
STAFF PRESENT: THONGVANH_X___
C. PRESENTATION
1. Neal Kwong Youth Citizen Award – Zane Johnson
Mayor Gustafson
Neal was a youth leader and eagle scout, he was the same age as my son. This award was established to
recognize outstanding young leaders. Gary and Chris Kwong, the parents of Neal are here to present the
award.
Zane Johnson
I want to thank everyone who helped me get to this point. It’s an honor to receive this award.
D. APPROVAL OF MINUTES:
1. April 28, 2021 City Council Regular Minutes
Motion to approve the minutes by Council Member Leehy;
Approved, 3-0.
Council Member Wehyee was absent at the time of the vote.
E. PUBLIC HEARINGS:
1. Amber Union Project – Vacation
Mayor Gustafson
The developer has requested the City vacate a portion of the Snelling Avenue Right of Way. Staff have
reviewed the request and determined the ROW is no longer needed once the building is developed with
the Amber Union project. Staff received a few questions but no opinions were received by staff for or
against the vacation.
Stephanie Smith, Assistant City Engineer
The existing location of the easement was part of a right of way turnback by MnDOT but was turned back
to the City. With the Amber Union development, that area would be turned into a parking lot, there is not
a need for a turnaround any longer. The property owner has requested the vacation in an effort to clear
the encumbrance as part of their financing. A condition of the resolution is that an appropriate easement
would be dedicated as part of this vacation. Staff’s recommendation is to hold the public hearing and
then to approve the resolution as presented.
Mayor Gustafson
The public hearing is now open. Second call for comment. Third and final call for comment. I’ll now close
the public hearing.
1 of 35
2 | Page
Council Member Leehy
I appreciate the clarity that we’re not losing a turnaround, there’s still space to do that.
Council Member Wehyee
Is this going to impact the property owners’ ability to access their homes?
Administrator Thongvanh
The property owners have routinely used private property to access Larpenteur Avenue, but Peter
Deanovic of Buhl Investors has said it is ok if they continue to do that.
Council Member Wehyee
Is that going to be allowed indefinitely? How consistent is that policy? Would residents have to worry
about that changing sometime in the future?
Peter Deanovic, Buhl Investors
Our intention through this process is to minimize the disruption, in terms of traffic. My commitment to
the City has been to take this one step at a time. There’s a desire to maintain the functionality of the site.
Motion to adopt Resolution 21-23 approving the vacation of Right of Way and provide the Administrator
and Mayor the authority to execute the necessary documents by Council Member Wehyee;
Approved, 4-0.
F. CONSENT AGENDA:
1. General Disbursements through: 5/20/21 $35,570.33
Payroll through: 5/15/21 $18,130.46
Motion to approve the consent agenda by Council Member Leehy;
Approved, 4-0.
G: POLICY ITEMS:
1. Amber Union Project – Encroachment Agreements and Easement
Andrea McDowell Poehler, City Attorney
There is a green space encroachment agreement as well as a parking encroachment agreement, Quitclaim
deed, and an easement that would be included in the resolution.
Motion to approve Resolution 21-24 by Council Member Miazga;
Approved, 4-0.
2. Amber Union Project – Accept Metropolitan Livable Communities Act Grant Agreement for
the Tax Base Revitalization Account Contamination Cleanup Grant Program (TBRA), Adopt
Fair Housing Policy, and TBRA Loan to Buhl GTA, LP, Limited Partnership
Administrator Thongvanh
In 2020, the City submitted an application on behalf of Buhl Investors to the Contamination Cleanup
Grant Program. The City was awarded funds and the grant will expire in 2023. Buhl has requested that
the grant be converted to a loan instead of a grant. When the City gets payment, the City has a right to
request to the Met Council to keep those funds and apply them to the property in the future to keep the
units affordable. Staff recommend approving the resolution the Fair Housing Policy and authorizing the
mayor and City Administrator to execute all necessary documents.
2 of 35
3 | Page
Motion by Council Member Leehy;
Approved, 4-0.
3. Alley Improvements - Accept Feasibility Report & Order Plans and Specifications
Administrator Thongvanh
This was brought to our attention by one of the property owners. There was a drainage problem in the
alley and during the winter, the alley would become icy. The property owner approached the city with a
petition and we received just over 50 percent of the property owners signing. Our assessment policy for
alleys states that the property owner is responsible for 90 percent and the City is responsible for 10
percent.
Stephanie Smith, Assistant City Engineer
The drainage improvements that we were proposing to eliminate the issues in the alleyway may require
additional work in the street. This could involve putting an additional catch basin in Pascal. The
improvements would be estimated at $27,000 in addition to the work we proposed in the alleyway.
Including this project as part of the alleyway improvements may result in high costs for materials.
The assessment hearing would take place after construction. Property owners could at that point pay the
assessment all up front or interest free in the first 30 days. They can also add to property taxes, typically
over 5 years with a 2% interest rate.
There are three options to move forward: delaying the entire project until a later date, approve only the
alleyway improvements, or approve both the alleyway improvements and storm sewer improvements.
Staff are recommending to delay the project. If it were to be added this year, we would recommend
moving forward with the improvement hearing on June 9, and would prepare plans and specs for June
23.
Council Member Miazga
Would we know the assessment costs at the June 9 public hearing?
Stephanie Smith, Assistant City Engineer
We would not have those numbers yet because we would need to obtain bids for the materials.
Administrator Thongvanh
The petition doesn’t obligate the City to do the project. By delaying the project, we could review the
larger scope of the project and make alleyway improvements on a broader scale. Authorizing plans and
specifications does not mean the Council will have to decide to do the work.
Motion to accept the feasibility report and order plans and specifications for the alleyway improvements
by Council Member Wehyee;
Approved, 4-0.
H. INFORMATION/ANNOUNCEMENTS:
I. COMMUNITY FORUM: Please limit comments to 3 minutes per person. Items brought before the Council will be referred for consideration. Council may ask questions for clarification, but no council action or discussion will be held on these items.
3 of 35
4 | Page
Felicia Busch, 1804 Lindig Street
This is in regard to the street improvement project that will be starting this year. Apparently a citizen
complained about the flooding that happens on Lindig in front of our house and our neighbor’s yard. The
flooding is temporary and lasts only a couple hours, it sinks into our yard. We received notice about the
project from the City, stating that we need to notify Roseville of sprinklers or invisible fences prior to the
project beginning so they are not damaged during the construction. I spoke to Stephanie Smith and she
coordinated an informational meeting with my neighbors. There is a huge amount of miscommunication
regarding the project.
J. ADJOURNMENT: 8:54 PM
________________________________
Randall C. Gustafson, Mayor
Dated this 26th day of May, 2021
_________________________________
Sack Thongvanh, City Administrator
4 of 35
June 23, 2021
By: Tim Pittman, Director of Public Works
5 of 35
Federal Clean Water Act:
Amended in 1987
A two-phase program
Phase I: Regulated large construction sites and major metropolitan areas
Phase II: Program broadened to include smaller construction sites and many
more municipalities
6 of 35
Overseen by the EPA and MPCA
Regulated parties must develop storm water pollution prevention
programs
The permit holder is required to submit a Storm Water Pollution
Prevention Program (SWPPP) that incorporates best management
practices (BMPs)
7 of 35
A conveyance of system of conveyances (catch basins, curbs, gutters, ditches, man
made channels)
Designed or used for collecting or conveying storm water
MS4’s in urbanized areas are required to obtain a storm water permit
Falcon Heights is considered an urbanized MS4 area
The U of M is permitted separately.
8 of 35
This program consists of six minimum Control Measures:
1.Public Education and Outreach
2.Public Involvement and Participation
3.Illicit Discharge, Detection and Elimination
4.Construction Site Runoff Control
5.Post-construction Runoff Control
6.Pollution Prevention and Good Housekeeping
9 of 35
Newsletters and flyers to residents
Developed a storm sewer map
Implemented the construction site runoff control measures
Hendrickson Apartments over seen by Capital Region Watershed
Inspected 100% of outfalls
Implemented de-icing material controls
Implemented storm drain system cleaning and rehabilitation of catch basin
Reconstructed the Curtiss Field Pond
Implemented vehicle maintenance program
10 of 35
Purchased a street sweeper with the City of Little Canada, bought out Little Canada
in December of 2016. more often street sweeping.
Straight salt for road melt
Storm sewer system cleaning program
Added additional underground storage structures in the north home neighborhood
11 of 35
Continue a utility billing
Continue educational flyers and newsletter
Continue to sweep streets more often
Rehab/Repair all catch basins related to each street project
Continue to monitor Underground containment structure put into place at Curtiss
Field Park.
12 of 35
Contact:
Tim Pittman, Director of Public Works
Email: TimP@falconheights.org
Phone: 651-792-7618
13 of 35
BLANK PAGE
14 of 35
REQUEST FOR COUNCIL ACTION
City of Falcon Heights, Minnesota __________________________
Item General Disbursements and Payroll
Description
General Disbursements through: 6/16/21 $186,874.03
Payroll through: 6/15/21 $19,419.73
Budget Impact The general disbursements and payroll are consistent with the budget.
Attachment(s) • General Disbursements and Payroll
Action(s)
Requested
Staff recommends that the Falcon Heights City Council approve general
disbursements and payroll.
*Payroll has not been processed
Meeting Date June 23, 2021
Agenda Item Consent F1
Attachment General Disbursements and Payroll
Submitted By Roland Olson, Finance Director
15 of 35
BLANK PAGE
16 of 35
17 of 35
18 of 35
19 of 35
20 of 35
21 of 35
22 of 35
23 of 35
BLANK PAGE
24 of 35
REQUEST FOR COUNCIL ACTION
City of Falcon Heights, Minnesota __________________________
Item Request for Authorization to Use a Portion of the City’s Municipal State Aid
(MSA) Account Funds for the 2021 Pavement Management Project, Approval
of Change Order #1 and Pay Estimate #1
Description
Falcon Heights is one of a few cities in the state that has a fully certified local
street system, which means the City’s designated state-aid routes are improved
to state-aid standards or are in an adequate condition. As such, we are allowed
to use a portion of our MSA funds to cover repairs of our local streets that are
not designated on the state aid system. The attached resolution authorizes city
staff to request MSA funds from Mn/DOT for use on the 2021 Pavement
Management Project.
Change Order #1 is attached for added work to install temporary mailboxes on
the north end of Tatum Street. This street had a significant amount of curb
replacement. The postal service was not delivering mail due to this
construction, so installation of temporary mailboxes was needed to restore
mail service to the residents. The amount is $1,452.00 and is 0.15% of the
project cost. The awarded contract was 20.27% under the estimated cost, so will
still be 20.12% under the estimated cost.
Pay Estimate #1 is attached for the work on the 2021 Pavement Management
Project. Pay Estimate #1 is in the amount of $110,036.92 and includes the
following work:
• Grading
• Concrete curb and gutter
• Utility Work
The project engineer and contractor have reviewed and approved the estimate,
and it is submitted for Council approval. With this pay estimate, the total
amount paid to date on this project is $110,036.92 or 11.99% of the original
contract price.
Budget Impact This project has the following financial implications for the city and property
owners along the streets under this maintenance project:
Meeting Date June 23, 2021
Agenda Item Policy G1
Attachment Resolution, Pay Estimate #1,
Change Order #1
Submitted By Jesse Freihammer, City Engineer
25 of 35
• Assessments levied in accordance with the City’s assessment policy.
• Use of Municipal State Aid (MSA) and street infrastructure funds to pay
the City’s portion of the project.
• Expenditure of utility fund dollars to pay for repairs needed to the
existing utility system.
Attachment(s) • Resolution 21-30 Requesting Municipal State Aid System Construction
Funds
• Pay Estimate #1
• Change Order #1
Action(s)
Requested
Motion to approve Change Order #1, Pay Estimate #1 and the resolution
authorizing use of the City’s Population Allocation Funds from the Municipal
State Aid Account for the 2021 Pavement Management.
26 of 35
CITY OF FALCON HEIGHTS
COUNCIL RESOLUTION
June 23, 2021
No. 21-30
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
RESOLUTION REQUESTING MUNICIPAL STATE AID SYSTEM CONSTRUCTION FUNDS FOR THE 2021 PAVEMENT MANAGEMENT PROJECT (SAP 124-050-016 on Tatum St. from Larpenteur Ave. to Roselawn Ave., Lindig St. from Larpenteur Ave. to north end, Fry St. from Larpenteur Ave. to Maple Knoll Dr., St Mary’s St. from Larpenteur Ave. and Maple Knoll Dr., W. Snelling Dr. from Hoyt Ave. to Hollywood Ct., E. Snelling Dr. from Idaho
Ave. to the north end, Asbury St. from Crawford Ave. to Roselawn Ave., Arona St. from Crawford Ave. to Roselawn Ave., Simpson St. from Crawford Ave. to Roselawn Ave., Pascal St. from Larpenteur Ave. to Roselawn Ave., Crawford Ave. from Simpson St. to Pascal St., Ruggles St. from Snelling Ave. N. to Pascal St., and Albert St. from Larpenteur Ave. to Garden St.)
WHEREAS, The City of Falcon Heights receives Municipal State Aid System (MSAS) funds for construction and maintaining 20% of its City streets, and WHEREAS, THE City State Aid routes are improved to state aid standards, are in adequate condition that they do not have needs other than additional resurfacing, and the City’s State
Aid system was certified complete in 2002, and WHEREAS, it is authorized by MN Rules 8820.1800 to use part of the MSAS construction appropriation of our City State Aid allocation on local streets not on the approved State Aid system, and
WHEREAS, it is proposed to use a portion of the City population allocation funds for roadway improvements on the following streets:
• Tatum St. from Larpenteur Ave. to Roselawn Ave.,
• Lindig St. from Larpenteur Ave. to north end,
• Fry St. from Larpenteur Ave. to Maple Knoll Dr.,
• St Mary’s St. from Larpenteur Ave. and Maple Knoll Dr.,
• W. Snelling Dr. from Hoyt Ave. to Hollywood Ct.,
• E. Snelling Dr. from Idaho Ave. to the north end,
• Asbury St. from Crawford Ave. to Roselawn Ave.,
• Arona St. from Crawford Ave. to Roselawn Ave.,
• Simpson St. from Crawford Ave. to Roselawn Ave.,
• Pascal St. from Larpenteur Ave. to Roselawn Ave.,
• Crawford Ave. from Simpson St. to Pascal St.,
• Ruggles St. from Snelling Ave. N. to Pascal St., and
• Albert St. from Larpenteur Ave. to Garden St
27 of 35
WHEREAS, the City indemnifies saves and holds harmless the State of Minnesota and its
agents and employees for claims, demands, actions, of causes of action arising out of or by
reason or matter related to constructing the local street as designed, and WHEREAS, the City further agrees to defend at its sole cost any claims arising as a result of constructing the local street, and
WHEREAS, the final approval of the State Aid for Local Transportation Division is therefore given. NOW THEREFORE BE IT RESOLVED by the Council of the City of Falcon Heights,
Minnesota:
1. Requests the release of MSAS construction funds for roadway improvements on Tatum St., Lindig St., Fry St., St Mary’s St., W. Snelling Dr., E. Snelling Dr., Asbury St., Arona St., Simpson St., Pascal St., Crawford Ave., Ruggles St., and Albert St.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Moved by: Approved by:
Randall C. Gustafson
Mayor
GUSTAFSON ____ In Favor Attested by:
LEEHY Sack Thongvanh
MIAZGA ____ Against City Administrator
ANDREWS
WEHYEE
28 of 35
CITY OF ROSEVILLE
2660 Civic Center Dr
Roseville, MN 55113
Page 1 of 6
Contract Number: FH21-02
Pay Request Number: 1
Project Number Project Description
FH21-02 Falcon Heights 2021 Pavement Management Project
Contractor: Molnau Trucking LLC Vendor Number: 32296 State Hwy 25 Up To Date: 06/16/2021 belle plaine, mn 56011
Contract Amount Funds Encumbered Original Contract $964,222.53 Original $964,222.53
Contract Changes $1,452.00 Additional N/A
Revised Contract $965,674.53 Total $964,222.53
Work Certified To Date
Base Bid Items $114,376.34
Contract Changes $1,452.00
Material On Hand $0.00
Total $115,828.34
Work Certified
This Request Work Certified To
Date Less Amount
Retained Less Previous
Payments Amount Paid This
Request Total Amount
Paid To Date $115,828.34 $115,828.34 $5,791.42 $0.00 $110,036.92 $110,036.92 Percent: Retained: 5% Percent Complete: 11.99%
This is to certify that the items of work shown in this certificate of Pay Estimate have been actually furnished for the work comprising the
above-mentioned projects in accordance with the plans and specifications heretofore approved.
Approved By: Approved By:
[1#first_name#0] [1#last_name#1] [2#first_name#3] [2#last_name#4]
Project Engineer Contractor
Date: [1#obtained#2] Date: [2#obtained#5]
Approved By
Project Owner
Date:
Jesse Freihammer
06/16/2021
nick or anna Molnau
06/16/2021
29 of 35
CITY OF ROSEVILLE
2660 Civic Center Dr
Roseville, MN 55113
Page 2 of 6
Payment Summary
No. Up To Date Work Certified
Per Request
Amount Retained
Per Request
Amount Paid
Per Request
1 2021-06-16 $115,828.34 $5,791.42 $110,036.92
Funding
Category Name
Funding
Category
Number
Work Certified
to Date Less Amount
Retained Less Previous
Payments Amount Paid
this Request Total Amount
Paid to Date
Arona $2,454.30 $122.72 $0.00 $2,331.58 $2,331.58
Asbury $495.72 $24.79 $0.00 $470.93 $470.93
E. Snelling $405.00 $20.25 $0.00 $384.75 $384.75
Lindig $19,562.84 $978.14 $0.00 $18,584.70 $18,584.70 Pascal $343.83 $17.19 $0.00 $326.64 $326.64 Storm Sewer $32,166.44 $1,608.32 $0.00 $30,558.12 $30,558.12 Tatum $60,400.21 $3,020.01 $0.00 $57,380.20 $57,380.20
Accounting
Number
Funding Source Amount Paid this
Request
Revised Contract
Amount
Funds
Encumbered to
Date
Paid Contractor to
Date
1 Municipal (MSAS >
5000) - Falcon Heights
$79,478.80 $79,478.80
2 Local - Storm Sewer - Falcon Heights
$30,558.12 $30,558.12
Contract Item Status
Project
Line
Item
Description
Units
Unit Price
Contract
Quantity
Quantity
This
Request
Amount This
Request
Quantity
To Date
Amount To
Date
FH21-02 1 2021.501
MOBILIZATION LS $19,000.00 1 0.25 $4,750.00 0.25 $4,750.00
FH21-02 2 2101.524 CLEARING TREE $150.00 2 2 $300.00 2 $300.00
FH21-02 3 2101.524 GRUBBING TREE $125.00 2 2 $250.00 2 $250.00
FH21-02 4 2104.502 REMOVE FLARED END
SECTION
EACH $455.65 1 1 $455.65 1 $455.65
FH21-02 5 2104.502 REMOVE MANHOLE OR
CATCH BASIN
EACH $343.83 2 1 $343.83 1 $343.83
FH21-02 6 2104.502 REMOVE CASTING EACH $122.10 62 1 $122.10 1 $122.10
FH21-02 7 2104.503 SAWING CONCRETE
PAVEMENT (FULL
DEPTH)
L F $2.43 520 0 $0.00 0 $0.00
FH21-02 8 2104.503 SAWING BIT PAVEMENT (FULL DEPTH) L F $2.48 1200 99 $245.52 99 $245.52
FH21-02 9 2104.503 REMOVE SEWER PIPE
(STORM)
L F $13.75 10 18 $247.50 18 $247.50
FH21-02 10 2104.503 REMOVE CONCRETE
CURB
L F $4.86 5250 3231 $15,702.66 3231 $15,702.66
30 of 35
CITY OF ROSEVILLE
2660 Civic Center Dr
Roseville, MN 55113
Page 3 of 6
Contract Item Status
Project
Line
Item
Description
Units
Unit Price
Contract
Quantity
Quantity
This
Request
Amount This
Request
Quantity
To Date
Amount To
Date
FH21-02 11 2104.504 REMOVE CONCRETE
DRIVEWAY PAVEMENT
S Y $11.00 360 0 $0.00 0 $0.00
FH21-02 12 2104.504 REMOVE BITUMINOUS PAVEMENT S Y $3.67 2250 92 $337.64 92 $337.64
FH21-02 13 2104.518 REMOVE CONCRETE
SIDEWALK
S F $1.10 1500 0 $0.00 0 $0.00
FH21-02 14 2105.501 COMMON EXCAVATION
(EV)
C Y $12.54 50 0 $0.00 0 $0.00
FH21-02 15 2105.501\00025 COMMON EXCAVATION - INFILTRATION BASIN (EV)
C Y $13.62 540 648 $8,825.76 648 $8,825.76
FH21-02 16 2105.604 GEOTEXTILE FABRIC
TYPE III NON-WOVEN
SY $9.69 70 0 $0.00 0 $0.00
FH21-02 17 2105.607 SOIL MEDIUM FOR
INFILTRATION AREAS
C Y $42.75 50 0 $0.00 0 $0.00
FH21-02 18 2112.501 AGGREGATE GRADING AND COMPACTION STA $626.75 3 0 $0.00 0 $0.00
FH21-02 19 2123.610 STREET SWEEPER
(WITH PICKUP BROOM)
HOUR $135.00 30 3 $405.00 3 $405.00
FH21-02 20 2211.507 AGGREGATE BASE (CV) CLASS 5 C Y $35.00 260 0 $0.00 0 $0.00
FH21-02 21 2231.509 BITUMINOUS PATCHING MIXTURE TON $109.01 170 0 $0.00 0 $0.00
FH21-02 22 2232.501 EDGE MILL BITUMINOUS
SURFACE
S Y $3.39 100 0 $0.00 0 $0.00
FH21-02 23 2232.504 MILL BITUMINOUS SURFACE (2.0") S Y $1.05 59900 0 $0.00 0 $0.00
FH21-02 24 2357.506 BITUMINOUS MATERIAL
FOR TACK COAT
GAL $3.74 4920 0 $0.00 0 $0.00
FH21-02 25 2360.509 TYPE SP 9.5 WEARING
COURSE MIX (3;B)
TON $60.62 7980 0 $0.00 0 $0.00
FH21-02 26 2411.507 GRANULAR BACKFILL (LV) C Y $10.00 100 50 $500.00 50 $500.00
FH21-02 27 2451.507 COARSE FILTER
AGGREGATE (LV)
C Y $35.00 10 0 $0.00 0 $0.00
FH21-02 28 2502.602 6" PVC PIPE DRAIN
CLEANOUT
EACH $411.24 3 0 $0.00 0 $0.00
FH21-02 29 2503.503 12" PVC PIPE SEWER L F $53.96 10 10 $539.60 10 $539.60
FH21-02 30 2503.503 12" RC PIPE SEWER
CLASS V
L F $43.71 80 91 $3,977.61 91 $3,977.61
31 of 35
CITY OF ROSEVILLE
2660 Civic Center Dr
Roseville, MN 55113
Page 4 of 6
Contract Item Status
Project
Line
Item
Description
Units
Unit Price
Contract
Quantity
Quantity
This
Request
Amount This
Request
Quantity
To Date
Amount To
Date
FH21-02 31 2503.603 6" PERFORATED HDPE
PIPE SEWER
L F $11.83 180 0 $0.00 0 $0.00
FH21-02 32 2503.603 6" HDPE PIPE SEWER L F $44.63 10 0 $0.00 0 $0.00
FH21-02 33 2504.602 6"X6" TEE FITTING EACH $524.23 2 0 $0.00 0 $0.00
FH21-02 34 2506.502 INSTALL CASTING EACH $230.47 64 3 $691.41 3 $691.41
FH21-02 35 2506.503 CONSTRUCT CATCH BASIN L F $572.94 13 7 $4,010.58 7 $4,010.58
FH21-02 36 2506.503 CONST DRAINAGE
STRUCTURE DES 60-
4020
L F $881.41 5 4 $3,525.64 4 $3,525.64
FH21-02 37 2506.516 MANHOLE CASTING R-
1733
EACH $443.53 59 0 $0.00 0 $0.00
FH21-02 38 2506.516 MANHOLE CASTING R-3067-V EACH $761.48 4 3 $2,284.44 3 $2,284.44
FH21-02 39 2506.602 ADJUST FRAME & RING
CASTING
EACH $239.75 8 0 $0.00 0 $0.00
FH21-02 40 2506.602 CONNECT INTO
EXISTING STORM
SEWER
EACH $848.00 5 3 $2,544.00 3 $2,544.00
FH21-02 41 2506.602 CONSTRUCT 12" NYOPLAST DRAIN W/CASTING
EACH $1,642.15 1 1 $1,642.15 1 $1,642.15
FH21-02 42 2506.603 REHABILITATE
MANHOLE OR CATCH
BASIN (INTERIOR)
EACH $465.00 46 0 $0.00 0 $0.00
FH21-02 43 2521.518 4" CONCRETE WALK S F $5.50 1300 0 $0.00 0 $0.00
FH21-02 44 2521.518 6" CONCRETE WALK S F $14.00 90 0 $0.00 0 $0.00
FH21-02 45 2531.503 CONCRETE CURB & GUTTER DESIGN B618 L F $25.75 2820 1078 $27,758.50 1078 $27,758.50
FH21-02 46 2531.503 CONCRETE CURB & GUTTER DESIGN B618 (MOD)
L F $28.75 175 0 $0.00 0 $0.00
FH21-02 47 2531.503 CONCRETE CURB AND
GUTTER DESIGN B618
(MACHINE LAID)
L F $17.25 1355 893 $15,404.25 893 $15,404.25
FH21-02 48 2531.503 CONCRETE CURB &
GUTTER DESIGN B624
L F $26.25 150 0 $0.00 0 $0.00
FH21-02 49 2531.503 CONCRETE CURB & GUTTER DESIGN B624 (MACHINE LAID)
L F $26.49 220 0 $0.00 0 $0.00
32 of 35
CITY OF ROSEVILLE
2660 Civic Center Dr
Roseville, MN 55113
Page 5 of 6
Contract Item Status
Project
Line
Item
Description
Units
Unit Price
Contract
Quantity
Quantity
This
Request
Amount This
Request
Quantity
To Date
Amount To
Date
FH21-02 50 2531.503 CONCRETE CURB &
GUTTER DESIGN D418
L F $25.25 540 600 $15,150.00 600 $15,150.00
FH21-02 51 2531.504 6" CONCRETE DRIVEWAY PAVEMENT S Y $61.65 360 0 $0.00 0 $0.00
FH21-02 52 2531.618 TRUNCATED DOMES S F $60.00 16 0 $0.00 0 $0.00
FH21-02 53 2563.601 TRAFFIC CONTROL LS $8,450.00 1 0.25 $2,112.50 0.25 $2,112.50
FH21-02 54 2573.501 EROSION CONTROL
SUPERVISOR
LS $1,250.00 1 0 $0.00 0 $0.00
FH21-02 55 2573.502 STORM DRAIN INLET PROTECTION TYPE A EACH $150.00 92 15 $2,250.00 15 $2,250.00
FH21-02 56 2573.503 SEDIMENT CONTROL
LOG TYPE COMPOST
L F $5.00 100 0 $0.00 0 $0.00
FH21-02 57 2575.604 TURF ESTABLISHMENT
WITH SEED AND
BLANKET
S Y $2.67 1760 0 $0.00 0 $0.00
FH21-02 58 2582.518 CROSSWALK MULTI COMP S F $4.00 630 0 $0.00 0 $0.00
Base Bid Totals: $114,376.34 $114,376.34
Project Category Totals
Project Category Amount This Request Amount To Date
FH21-02 BASE BID $114,376.34 $114,376.34
Contract Change Item Status
Project CC CC#
Line
Item
Description
Units
Unit Price
Contract
Quantity
Quantity
This
Request
Amount This
Request
Quantity
To Date
Amount To
Date
FH21-02 CO 1 61 2540.602 INSTALL TEMPORARY MAILBOXES EACH $44.00 33 33 $1,452.00 33 $1,452.00
Contract Change Totals: $1,452.00 $1,452.00
Contract Total $115,828.34
Contract Change Totals
Number Description Amount This
Request
Amount To Date
1 Install temporary mailboxes $1,452.00 $1,452.00
Material On Hand Additions
33 of 35
CITY OF ROSEVILLE
2660 Civic Center Dr
Roseville, MN 55113
Page 6 of 6
Line Item Description Date Added Comments
Material On Hand Balance
Line Item Description Date Added Used Remaining
34 of 35
STATE AID FOR LOCAL TRANSPORTATION Rev. February 2018
CHANGE ORDER
SP/SAP(s) SAP 124-050-016 MN Project No.: Change Order No. 1
Page 1 of 1
Project Name Falcon Heights 2021 Pavement Management Project
Local Agency City of Roseville Local Project No.
Contractor Molnau Trucking LLC Contract No. FH21-02
Address/City/State/Zip 32296 State Hwy 25 / belle plaine / mn / 56011
Total Change Order Amount $$1,452.00
Install temporary mailboxes
Estimate Of Cost: (Include any increases or decreases in contract items, any negotiated or force account items.)
**Group/fundi
ng Category Item No. Description Unit Unit Price +or –
Quantity
+or –
Amount $
Tatum 2540.602
INSTALL TEMPORARY
MAILBOXES EACH $44.00 33 $1,452.00
Net Change this Change Order $1,452.00
**Group/funding category is required for federal aid projects
Due to this change, the contract time: (check one)
( ) Is NOT changed ( ) May be revised as provided in MnDOT Specification 1806
Number of Working Days Affected by this Contract
Change: 0
Number of Calendar Days Affected by this Contract
Change: 0
Approved by Project Engineer: Date:
Approved by Contractor: Date:
Approved by City Administrator:Date:
DSAE Portion: The State of Minnesota is not a participant in this contract. Signature by the
District State Aid Engineer is for FUNDING PURPOSES ONLY and for compliance with State
and Federal Aid Rules/Policy. Eligibility does not guarantee funds will be available.
This work is eligible for: ___ Federal Funding ___ State Aid Funding ___ Local funds
District State Aid Engineer: Date:
35 of 35