HomeMy WebLinkAboutCCMin_68Oct17_SpecialSPECIAL MEETING OF OCTOBER 17, 1968 2798
HEARING ~ HAMLINE AVENUE WATERMAIN REPLACEMENT
The special meeting to hear all persons interested in the Proposed Hamline
Avenue Watermain Replacement between Larpenteur Avenue and Garden Avenue
was called to order at 8;00 P.M. with the following members present:
Mayor Warkentien, Councilmen Black, Ecklund and Stone. Absent: Clerk
Strandquist. Also present were Attorney Seed and Engineer Lemberg.
Mayor Warkentien read Notice of Public Hearing as published and then intro-
duced Engineer Lemberg who reviewed his report dated October 17, 1968
regarding the proposed Hamline Avenue Watermain Replacement, A resident
called to the Council's attention that the lots are not 125.91 feet as
outlined on page 2 of the report but are approximately one.-half that
size or 66-•1 /2 :feet .
Engineer Lemberg stated it would be to the advantage of the property owners
to take steps necessary to have this line installed. If Roseville does it
alone at this time, it may cost twice as much to replace the line for Falcon
Heights residents at some future date. ~n axis apindh it would be a wise
investment to go in with Roseville and install this line on a joint venture.
Mr. Rustad - 1723 Hamline Avenue: It is my understanding that $6,67 a front
foot is the total cost and this is to be on a 50-50 basis.
Lemberg: This is the front footage assessment for our share only.
Rustad: My understanding is the $6.67 sounds good but that is to be
split with Roseville.
Lemberg: Assessable front footage cost is approximately $6,67.
Rustad: I thought it was around $6.00 and this for the whole works and
would be cut in l/2. I got this from a reliable fellow.
Lemberg: The $6.67 is for Falcon Heights residents alone - this includes
the hook up.
Rustad was of opinion this was doubling up the cost, He stated he got the
figures from the St. Paul Water Department. He said the notice was mis-
leading and probably wrong - also the 797 feet takes in more than six property
owners as engineer had stated.
Lemberg: As far as St. Paul giving any cost figures -- they do not include
hook-up, repairing streets, inspections, legal and engineering
costs. Why they should give out a cost I donut know. They
charge their own people $5.50 a front foot and then the city takes
care of the street, etc.
Warkenti en: We met with Hamblin of the St. Paul Water Department about a year
ago and at that time he insisted that the pipe be laid on the
Roseville side and our people would be charged $200 in addition
to the assessment to hook up.
Charles Radefeldt - 1803 Hamline: The 6 inch pipe that is hooked on, what is
going to happen to that?
Pipkorn - 1757 Hamline Ave.: I would like to ask question of engineer. What
makes him think the pipe that is 10 feet below the surface that that
is going to deteriorate or freeze some time when we have a cold day?
Do you think it could go down 10 feet? Also that is a 3~~ cast
iron water main, not galvanized,
Lemberg: St. Paul records indicate that is a galvanized pipe on the other
side of the street when they tapped into that line.
Pipkorn: When the plumber was down there making connections I saw the
.connection coming through.
Tonkin -- 1709 Hamline Ave.: At the time they put in the sewer they exposed
that pipe and it is a galvanized pipe. They broke off my house connec-
ion with the drag line so while they were repairing I went down
there. The pipe in my opinion is in good shape. You have to
2 799
unscrew the coupling .- the threads in the pipe were in good
shape. A little bit rusty on the inside. I contend that
if this pipe were left alone in the first place we would still
have all the water we wanted. Everything was satisfactory
until they started $ampering with it and cutting in a 6" pipe
and Roseville connections, We had good service. The pipe was
paid for by the property owners as a private line and I can't
see where anybody got permission to tap onto it,
Warkentien: That is what we told. you people the last time..
Tonkin: I can't see where we are going to derive any benefit. All
Roseville wants to do is to get a larger line so they can run
a line further out. Why should we be penalized for service that
is going to benefit someone else?
Lemberg: As far as running it further out, water is all in. This line will
not benefit anybody further north - it is looped around Roselawn,
Hamline. This will not benefit that property whatsoever.. The only
reason we tied it in - we wanted to help the people south of Garden
get better pressure.
Citizen: That didn't help it.
Radefeldt: When you went through the school property, were they assessed there?
Answer was yes, it was 100 assessment.
Pipkorn: I can't see where we will benefit by pt~.tting in a new line. Is it
just to prevent possibility of this line breaking or deteroriating?
Answer was yes, partly, and Warkentien said that Roseville will put in their
own anyway, even if people don't want to go along with them.
Pipkorn: If youlook at the east side of Hamline = how many homes are there? I
suppose one day they will build apt. buildings where the pit is.
Ernie Toroc -Bisanz Brothers Realty: To answer this question, May I say
I sold those properties and some of the owners are here now that
bought the lots and I assure you that there will be no apartment
building going up.
Lemberg: One other thing there is a shortage of hydrants between Larpenteur
and Garden at the present time. Corners of Garden and Hamline and
also Larpenteur and Hamline not covered for fire protection. Fire
Underwriters have asked for maximum of 300 feet between. That is an
added protection.
Black: In your opinion, Brad, if this present line goes out in the next few
years, it would cost double to replace?
Lemberg: If Roseville puts it in alone then they would be the only ones to pay
for it. Lines have been known to last 50 years and others only last
10 years, I can't say.
Warkentien said that Falcon Heights cannot connect to the line if Roseville
puts it in because they have bulk water from St, Paul and St, Paul
would not allow it. He reviewed action of St. Paul Water Department
when Village asked to connect to Roseville water from Snelling and
Roselawn Avenues.
Radefeldt: Why do these few people have to pay for that line? How about the
storm sewer - we had to pay to drain other people's water.
Warkentien: Water is assessed by the front foot and storm sewer assessments
are on a square footage of your lot. Sidewalk, curb and gutter,
water are assessed on a front foot basis.
Pipkorn: It seems that people here are $ery much against it. If anyone else
is of that opinion let them speak up. I can't see why we should
bear the load of a line we already paid for in the first place and
then pay for enlarging it just so as to tie in with the laws of today.
For years we lived without any fires and never had to be benefited
by insurance. They charge us just as much now.
2800
1
L~
Black: If that line should give out I don't know what the village could
do for you,
Radefeldt: If there is a 6" feed in front of our house for the Fire Department,
they shouldn't have any trouble with that.
B. Pagenkopf: This is all comparatively new to me -- this private line - and
1697 I am perfectly happy with the water situation as it is like the
Hemline rest of them,
Mrs. Alshouse When you were explaining the cost per front foot you were giving
1717 Hamline~a. us the cost for Falcon Heights residents .- is it exactly the
same as for Roseville residents?
Lemberg: We split the cost of the main itself right down the middle -
split the cost of engineering, split the cost for boulevard and
street repair, legal contingencies, and the cost of hooking up
each one of the Falcon Heights residents. Roseville would have
the other half plus hook up to their .residents,
Question: How much is it going to cost them?
Lemberg: Approximately the same .- probably a little more because they have
to extend across the street.
Alshouse: What are the plans for improving Hemline Avenue?
Lemberg: Somewhere between 1970 and 1972.
Question: Tf you lay it in the boulevard, that doesn't make any difference
does it?
Lemberg: It will have to be cut at both places in the street and in the
boulevard. so it is affected a little.
Rusted: I can't get this quite straight. You have got our cost but you couldn
. not know what Roseville's is and yet you talk about a 50-50
split. I got a sneaking hunch that $6.67 is for the Yrhole works.
Lemberg: We know Roseville~s share up to the point of their hook up to their
lots . If you want that cost , we can get it .
Millard: If fire hydrants were installed on the south end, it wouldn't
1771 meet requirements.
Hemline:
Lemberg: No, because there would be still 800. feet between the two; 300 or
x+00 feet each way if put right at the end. of the 6" line.
Pipkorn: The watermain now is about three feet inside-the street. That
doesn't go into the street. Why should we have to pay for street
for Roseville.
Lemberg: That is for repairing in the boulevard, When I say street I mean
the right of way in the street .- sod, etc.
Stone: For the record I would like to have Lemberg call off the names and
see if they are for or against.
i~
Thatcher:
Pagenkopf:
Brausen:
Tonkin:
Alshouse:
Rust ad
Keran
Loehr:
Johnson:
Wakefield:
Pipkorn:
advised his brother
against
not present
against
not sure .- abstain
against it on basis
not here
not here
and he are 100q in favor.
from voting
of what said here tonight.
not present , but against it
against
against
Lemberg asked if there were other questions. Mrs. Wakefield said
2801
know
she wants to talk to her attorney and she wants tv~more about
it first, as she is confused. Rust ad is going. to verify the cost.
Black mentioned that on other jobs the estimates in the-past have
been pretty close. Brad Lemberg said St. Paul Department charges
$5.50 and then Village of Falcon Heights would have to charge to
make repairs for hook ups, and they (St. Paul) would then own the
line and Falcon Heights would have nothing to say, St. Paul will
not repair it, either.
Citizen mentioned the only danger is if there is afire large
enough to hook pumpers that it might collapse then. Lemberg
said that council talked to most of them one other time and
thought the cost was prohibitive and now council thinks it would
be about one-half the cost, If Roseville put in their own line
and then Falcon Heights citizens wanted it later, the cost would
probably be double.
Question was if Roseville put in the line they would put in
fire hydrants there and Lemberg answered yes he thinks so and
thought the following might be interesting.. When there was a
request from Hamline:Avenue peflple north of Garden, council
approached Roseville and they were completely willing to
do this --have people hookonto their-line and council received
a letter which told about charges to be made for usage, etc.
City of Saint Paul would not allow it, -Hydrants are not shared.
Alshouse: How come they would allow it now? -- Answer was that the Village
of Falcon Heights is billed directly by St. Paul.
Black: I don't know how they allowed those hookups south. of Garden into
Falcon Heights line, We sat in with the-Water Department and
they said that this had not been.. done.
Toroc: on the lath of November Roseville is going to bring this to their
Councils attention, I got involved in this matter and I would
hope the people of Falcon Heights would really think about this
and decidedin favor of it because it will serve many__people.
Roseville wants to cooperate to keep. costs down. The lots on
Roseville side are 85~ lots and the-assessment is going to be
more than $6.67 a front foot,
Alshouse: How about other homes that are already hooked up?
Lemberg: I think there are three and there are still a couple on pumps,
Roroc: Roseville cannot. act until the. decision tonight. This really is
the most feasible way to do the fob,
Assessment procedures were revie~red with citizens.
Black: The need and the cost are. factors. If the. people are sure they
would not want it, then we should close the hearing.
Warkentien: Would you people like to continue this hearing? General concensus
was that it should be continued.
Black moved, seconded by Ecklund that this Hearing be continued
until Thursday evening, October 21+, 1968 at 8:00 P,M. Ayes: All.
Nays: None. -Motion was carried.
Application for Application-for variance from Custom Pools Inc.. signed by Troyer
Variance -Swim,.~ing had been referred to Planning Commission inasmuch as definition
Pool -11+36 West of structure would seem to encompass swimming pools, Planning
Larpenteur Ave: Commission report dated October 17 recommended that Village
2802
Council grant request to build a swimming pool at
1436 West Larpenteur Avenue with ;a rear yard setback
of eleven feet, -_The,_commission also recommended that
the side yaxd,setback on the east side of the lot shall
be not less than teen feet? instead of the five feet as shown
on them proposed-plan.
~ r1 - ~ ,~
Black moved, second: by Stone that-the variance referred to
in previous paragraph be granted. The distance from the rear lot
~ ,-,litre Shall,-be ;no less than eleven,-feet and at least ten feet shall be
allowed for each side lot line,.. Tie contractor shall post a
~
performance bond
in the amount of the construction costs and
completion date of the ~pro~ect shall be no later than December 1
1868. Ayes: All, Nays:l None, Motion was carried, ~
~torni Sewer Lemberg advised. h~ is meeting with 'efigineers from Roseville to
F~a,lcon Wood-s consider the storm sewer in the Falcon-Woods area .- Prior Avenue
Area:. ~ ,
~ _ ~ c _
Removal of Stone moved that in accordance with Dr. Hard's request
_the
Trees:
` ,
trees at 1364 and, 1365_California ~e r-emoved, also tree at
~
~ 1512 'California (on the Arona Street side) be removed, and
`
'
' that
if r~rrners wish to replace trees, they may do so using tree
that appears on permitted list of trees, Seconded by Ecklund,,
`,Ayest All, Nays: None, ~ Motion was' carrried,
St. Pa~u1 Water~_
D
r
m - - f -
~-
Letter dated October l5, 1968 from R, Delany, Plumbing inspector
epa
t
ent -
' Plumber,`; ,
stated that _con-~ractor~ b~ told by Faleon Heights regarding
S
' t. Paul Water Department regulat,ip~s, before they start any part
of piping install~atiQn wtYrin a building,
Dept. of Labor A true and correct copyofthe decision of the referee filed with
and Industry ~- the Workmen's Comp, Commision in the matter of Dewey A. Smith
Jr
Workmen" _iComp. ,
.
vs, Falcon Heights and-Iowa. National Mutual and Bituminous
Commission -- Casualty Corp, and State Treasurer, custodian of the special
Dewey Smith: compensation fund was ;received` and file~3..
NSP request to ~ Stone~moved,.seconded ley Black that,, request of NSP Company to
install buried install buried electric facilities at the following locations:
electric- 5 manholes and 2,150 feet of Duct line on Tatum Street from 400'
facilities': - north of Larpenteur to ~Roselawn as per sketch attached, be granted
1`' ,
Ayes: All: Nays: None. Motion was carried,
Minn. Apartrment ~ette~r from Robert-Keller, President Minn. Apartment Association
Association: requested that nptification of any proposed changes in zoning
, :ordinance or building code be. given them,
Fire Depta,rtmentr Jerome Beardsley `r`equested consideration to petitions signed by
r- approximately 425 property o~an.ers of Falcon Heights. Petition was
headed as follows: "The undersigned owners of property in the
Village of Falcon Heights hereby petition the. Village Council of
Falcon !,Heights to preserve unchanged its present system of fire
;- protection and protest its presen~C proposals for reorganization of
,~~ _ the Falcon Heights Fire Dapt. on tyre :grounds that such action would
be injurious,to property interests, that it would not safeguard the
_ public interest, tha~tis an arbitrary and unreasonable exercise of
eotincil powers; that the undersigned further respectfully request
f that this matter'~e submitted to the citizens of the village for a
- 1 ~e~fer!enc~.um emote: '
2803
Petitions were then received by Mayor Warkentien. Beardsley
asked when the council is going to render a decision
and he asked the council's indulgence before the proposal
to change the structure of the fire department is finalized.
He asked the council to give consideration to this petition
for a referendum vote.
Attorney Seed stated a vote on this proposal would be
absolutely impossible.
Beardsley said it seemed to him the people who signed this
petition are strongly against this proposal.
Councilman Black said in part that people elect a council
to make certain decisions and asked why the people thought
the council would discontinue any department if it is way
off base.
The rates and tax saving were again discussed, also the
daytime coverage and ff adequate with only volunteers.
University f~rove Area Alan McCoid, attorney, who lives in University Grove Area
Petition: presented petition similar to one above signed by approximately
40 residents and stated the language on above petition dice not
represent their view, and so was changed. He Gafd there i
serious concern about the welfare of the community,
and it was consensus of opinion that maintenance of very
highly qualified men and the need for improving the
quality of the fire department are the concerns. The
people are concerned with the limited funds available
and this change might be made at the expense of some risk
or delay in providing the kinds of emergency needs as in
the past. The petition with the modified language, was
received by Mayor Warkentien.
Attorney Seed said a referendum would be illegal. He
looked at the statutes and said there is no provision for
referendum. He did say he did not find any prohibition
offering an opportunity to express opinions. Concern of
over 400 petitioners shows there is grave concern about
this matter. He thinks one of the difficulties has been
that people are ill info~rrrled on the problem. He thinks
one of the difficulties has been that people have not
been able LQ ~~ar the r esults of tests, etc.
is
McCoid said h~concerned as a citizen that if the
council should act now and act to adopt the proposal
people would lose faith in actions of the counci ~':.
Full explanation of the factors that were considered by
the council has not been given the people and if they
had been given, the council may find overwhelming
approval. We know a vote on this is not binding,
280.
but a vote at least could find out feelings of people.
Ecklund stated that 21 out of 23 volunteers voted to sleep at
the station nights. He stated that on day calls more men are
available than the four men as stated prevQUSly.
Meeting adjourned at 11:00 P.M.