HomeMy WebLinkAboutCCAgenda_88Sep2CITY OF FALCON HEIGHTS
NORTHWEST AREA
STORM DRAINAGE STUDY UPDATE
SEPTEMBER 1988
I hereby certify that this Report was written by me or under my directsupervisionandthatIamadulyregisteredProfessionalEngineerunder thelawsoftheStateofMinnesota.
Terry J. er, P.E. Date
Reg. No. 15316
GGIi~r~
September 1, 1988
File: 330-010.80
CONSULTING ENGiNEEAS
Maier Stewart & Associates Inc.
Ms. Jan Wiessner, Administrator
City of Falcon Heights
2077 Larpenteur Avenue West - - --
Falcon Heights, MN 55113
RE: Northwest Area Storm Drainage Update
Dear Ms. Wiessner:
As requested, we have updated the City's 1974 Northwest Area Storm DrainageStudy. The attached report summarizes our findings. In updating this
report, we have followed the same methodology used in the original report.
If we can be of any further assistance on this matter, please call.
Sincerely,
MAIER STEWART & ASSOCIATES, INC.
Terry J. aurer, P.E.
TJM/ms
1959 SLOAN PLACE, ST. PAUL, MINNESOTA 55117 612-774-6021
INTRODUCTION
This update report of the 1974 Northwest Area Storm Drainage Study was
authorized by the Falcon Heights City Council. It provides a review of the
original report and a reanalysis of the conclusions of that report based on
the storm drainage improvements accomplished since 1974.
The area of reanaylsis is all property lying west of Fairview Avenue and
north of Larpenteur Avenue, specifically the area at the north end of Lindig
Avenue. The reanalysis utilized the same methodology used in the original
report. :_ _ _ _- ~_ ,
BACKGROUND
The 1974 Study developed a storm drainage system comprised of a network of
pipes and ponds. The piping system sizing was based on a 5 year frequency
rainfall event. That is, a rainstorm which has a statistical occurrence
rate of once every five years. The method utilized for the system design
was the rational method.
The original report developed two different plans for storm drainage in the
Northwest Area. Plan A was based on the existing zoning in 1974 which had
most of the City containing single family residences with a few multiple
family residences along Larpenteur Avenue. Plan B was based on possible
changes in the 1974 zoning which would have allowed higher density
development in some areas plus possible development of portions of the
University of Minnesota property.
Since 1974, development in the study area, west of Fairview and north of
Larpenteur, has included the City Hall site, the Hewlett-Packard site, the
Stratford office complex and Falcon Woods ~o. 3. Tatum Street was also
reconstructed including storm drainage improvements and storm sewer piping
was extended south of Larpenteur Avenue on Gortner Avenue. This development
most closely follows Plan B as presented in the original study. The
original Plan B proposed improvements for the area west of Fairview and
north of Larpenteur are shown on Exhibit 1. Exhibit 2 shows the storm
drainage system in this area as it currently exists.
ANALYSIS
As can be seen from Exhibit 1, the original pr®posal was to drain the entire
area to the corner of Fairview and Larpenteur. It was estimated that a 36
inch diameter storm sewer line would be required to handle the 5 year
frequency storm runoff. Appendix B of the 1974 study estimated the flow at
68 cubic feet per second (CFS).
As the system was constructed, the concept has changed as shown by
Exhibit 2. The outlet from the area is a storm sewer line down Gortner
Avenue rather than the southeast corner of the district. This eliminates a
small part of the drainage district at the south end of Tatum and along the
west side of Fairview. Based on the original design criteria and this
smaller area, it is estimated the peak 5 year discharge from the area is 51
CFS.
The other major change which is obvious from Exhibit 2 is the size of the
outlet from the district. The storm sewer line down Gortner Avenue is 21
inches in diameter while the lines from the east and the west which connect
to this discharge are 24 and 27 inches in diameter. A cursory review of
City files revealed a draft agreement between the University of Minnesota
and the City of Falcon Heights which limited the Gortner Avenue line to 21
inches and a maximum flow of 16 CFS. The actual capacity of this 21 inch
line considering maximum system surcharging is approximately 14 CFS.
This reduction of outlet capacity from the required 51 CFS to 14 CFS has a
very limiting effect on the entire system. Rather than providing an overall
system capacity for a 5 year frequency rainfall event, the outlet limits
this to much less. All of the storm sewer facilities leading up to the
Fortner Avenue line are adequately sized to convey the 5 year frequency
storm. ,_. _ _ _
CONCLUSION/RECOMMENDATIONS
The potential result of the limited outlet capacity would be backups
throughout the system during higher frequency rainfall events. The intent
would be to have the .ponds in the system absorb the backups. Apparently,
this is currently happening since there have been several rainfall events
which have exceeded the storm sewer capacity since its construction with no
reports of any damage.
However, when storm sewer is extended from Tatum Street to the north Lindig
area, another pond is proposed. This pond will likely be the lowest point
on the system in terms of backups. Great care will be required in sizing
that pond and analyzing the potential e-~fects on the surrounding area given
various rainfall events. Based on this analysis, a minimum building
elevation can be set for the area which will preclude flooding from a given
rainfall event.
In conclusion, it appears the "no build" designation can be removed from the
north Lindig area if storm sewer is extended and a ponding area constructed.
It will require work beyond the scope of this report to analyze the pond
sizing and the minimum building elevation. It is not clear whether or not
the minimum building elevation will require substantial filling of the area
to allow building.
In the interim, it would be possible to develop the lots at the north end
of the existing Lindig Street pavement without extension of storm sewer
system to the area. It appears there are at least two lots on the east
side of Lindig that could..be served by the exis-ting sanitary sewer-acrd ----
water system. These lots are directly across from developed lots and south
of the proposed pond location for this area as presented in the 1974 report.
Development of these will cause a small increase in runoff in the area, but
should not cause any significant problems. It is not recommended, however,
that development occur north of the existing sanitary sewer and water
facilities without an overall plan for utilities including storm sewer for
the entire area.
u~ rn~ sru~ b.c. , ~ ~a .~sd~~- ~C1~vu'c~ ~~`-~-~QIA~-~
P
a,i~ rw ~a~ ~2,c~.c~a~~-
I II i I I
Ra ESEG Al~VN
v s
2 -,
L ARPE~
o~
J~II;
SE LEGEND
HIGH DENSITY
COMMERCIAL
r~rL~i~'
Maier Stewart & Associates Inc.
8" I E.u
J
v
2/'~
30 ~~ ~
rEVR Av.
EXHIBIT 1,
PROPOSED SYSTEM
PLAN B )
1974 N.W AREA STORM
DRAINAGE STUDY
J~
J
W
Q
l2 "
CITY OF
FALCON HEIGH~f~
70»M ~hhrEN>EUM •VfMUE • Elk CON wk~CM76 uh E611]~66M
1 II ! 1
Ro sE~ Aviv
v s ~'
h ~w
R
a
G ~ ~v W
88
Q
N24 24 W
J48E24 IeI
ury
NA~-t-
27'~
j HEWLETT 0
Q 8 P~gGt'ARD
o V
4 RPENE~/R AVE N1
27" ~ 24"
22~'' cW
cvrr
Maier Stewart & Associates Inc.
EXHIBIT 2
EXISTING
DRAINAGE
FACILITIES
cm of
FALCON HEIGHTS
a1Tfw. u~~fN!FtM ~vFNUE iKGOM NfIGwTE. 4r: ff~t]~ffW