SPEC?.~L MEETING OF AUGUST 18, 1965
(Public Hearing Continued
Storm Sewer Imp. 65 1)
The special meeting was called to order at 7:30 P.M, with the following members
present, Acting Mayor Warkentien, Clerk Strandquist, Trustees Black and Stone.
Absents Mayor Nilsen. Also present were Engineer Lemberg and Attorney Galvin.
Robert Sander, fiscal agent from Juran and Moody was also present.
Application for Application for rezoning certain property has been
Rezoning submitted, along with the fee of X35.00 by A, A.
A. A, Bilski Bilski, 1705 North Cleveland Avenues. Attorney John
1705 North Clevelands Daubney presented his views. Tt appears that George
Nelson, 1689 North Cleveland is not in favor of
rezoning at this time.
Black moved, Stone seconded that application for
rezoning submitted by A, A, Bilski for the property
located at 1705 North Cleveland Avenue be referred to
the Planning Commission for consideration and
recommendation. Ayes: All. Nays None. Motion
carried,
Embers Cafe Black moved, Stone seconded that 'No Parking' signs
1700 North Snelling be placed on both sides of the service lane on the
~ NO Parkingt signss east side of Snelling Avenue from Crawford to
Larpenteur Avenue. Placing of these signs shall be
subject to approval. of the State Highway Department,
Ayes: All. Nayss None. Motion.. carried.
Water Main Improvement
of 1963 - Sinking Funds Warkentien introduced the following resolution and
'- moved its adoption:
Call of Certain
Bonds WHEREI~S, the Village of Falcon Heights had surplus
funds from the 1963 Sanitary Sewer and Water Main
Improvement.sinking fund, and
1NHEREAS, by resolution adopted November !t, 196l~
said funds had been invested in U. S. Treasury bills
to mature September 30, 1965, and
V~HEREAS, certain of the bonds of said issue are
curr®ntly outstanding and subject to call,
NOS, THEREFORE BE IT RESOLVED by the Village
Council of the Village of Falcon Heights
1. Those certain bonds of said issue maturing
October 1, 1983 and numbered 168 to 180 inclusive are
hereby called for redemptions being 13 in total number,
2. The Village Clerk is authorized to make payment
from the WaterMain Improvement of 1963 Sinking Fund in
the amount of X13,390.00 to the American National Bank.
3. That notice of this call and redemption shall be
trans~i.tted by the Clerk to the Village fiscal agent for
appropriate action.
J~~/~ 22so
Black seconded the motion. Upon a vote being taken the
following were in favor: Warkentien, Strandquist, Black
and Stone; and the following were against the same: None.
Whereupon the motion was carried.
Continuation of
PUBLIC HERRING Continuation of Public Heariā¢<ng on the Northeast Area Storm
Sewer Improvement 65-1 was approved by resolution at the
Northeast Area meeting of the council on July 1l~, 1965, therefore, Hearing
Storm Sewer was called to order at 8:00 P.M. with approximately forty
Improvement 65-1s persons present.
Engineer Lemberg stated that since the meeting of July 11~,
1965, he has met with the Roseville engineer and other
consulting engineers and each is in the process of re-
computing estimated costs and working on various aspects
of the project. It was stated that Roseville has not as
yet had its first public hearing on this project.
1
Trustee Blacks Do they have any disagreements with our proposed plans?
Lemberg: No. One thing though, by running up Holton rather than
Albert, it is more expensive but that extra cost does not
8ffect this Village.
E. M. MacMillan Mr. Mac~Jiillen explained this his committee had sent letter
1776 Holton: to all residences in the area involved and received replies
as follows:
!t3 were opposed to storm sewer pro3ect.
35 were opposed to the pro3ect unless the physical
plan is revised to reduce the cost to individuals
involved.
32 would petition to abandon present plan in its
entirety and erect xoas~-wire fence around the
present ponding area between Holto}i and Pascal
Avenues at Garden.
30 were in favor of Northeast Area Storm Sewer
Pro3ect as proposed.
He then turned over envelope containing the replies to the
acting mayor for review.
1
R. H. Chalmers How did this pro3ect originate?
18811 No. Pascals
This was started in 1956 or 1957 when the council requested
Lemberg3 the consulting engineers to study the problem and draw up
some plans, which they did. In the last couple years, there
has been considerable discussion and during the spring of
1965, the council felt that the people should b® given an
opportunity to look at this, As the present consulting
engineers, our firm concurred with the plans as previously
prepared. Some small revisions were made, and in some cases
we decreased the size of pipe. This plan was designed for
a general water fall, not a flood. The entire plan has
again been reviewed by Bannister, engineering firm for
Roseville, and they have gone through the entire plan and
computations and have concurred with the design.
2281 ~l/8~~5
Harold Jensen when was the last survey made?
17I~7 Holtons
Lemberg answered that was re-checked this year.
Jensens I cannot see the need for the line running down Holton.
Leland Peterson As I understand this, it involves filling in those lots
1766 Holtons between Holton and Pascal off Garden Avenue. Wi1.1 the
storm server be any good until. they are filled in?
Lembergs It is the property owner's responsibility to fill in the
lots. The water will b® picked up in the street before
it gets to the ponding area. We would encourage that it
be filled.
MacMillens Doesn't the village council have the power to see that it
is filled? It is a death trap.
Galvins This area represents what is the natural lorr area in the
community. That is where the water has been draining
these many years. The council has inherent power to abate
public nuisances. The legal complications in changing
the natural flow of water has been a matter of constant
litigation. The Village does have power to abate nuisances.
Tim Elder
Chairman Board of As for filling in these lots, I cannot speak for the
Trustees - Falcon church. I would assure you that our prime concern is
Heights Congregational to maintain these lots as best as can be.
Church s
Is there any other solution? My neighbors claim they
Evelyn Dilger will get the same benefit as Roseville withour Roseville
1811 North Hamlines paying for it. I have seen cars swerve in our culverts
and also children playing in the culverts - and then
there are the weeds, too. I am willing to spend a
couple hundred dollars to improve that. I would also
like to lrnorr about the water pipes.
Lemberg: We are working on the cost estimates for obtaining
water for you. We don't believe the city of Saint Paul
will allow this Village to hook those fern homes to water
from water across the street on Hamline. We are checking
into that. Your neighbors are not correct when they say
that Falcon Heights will be putting in a line on Hamline
and Roseville will benefit without cost. This is one of
the lines that will be put in on a point venture and the
cost proportionately shared.
Jim Utne TNhat will
have to be dug up?
1806 No. Pascals .
I cannot be exactly sure - what we proposed to do on
Lembergs streets such as Ruggles, Pascal - in those areas where
ditches exist - we hope to put it completely in the
ditch area. We plan to use the excess material to
fill in those ditches. I am not saying this is
definite. tRfe hope to put them in the boulevards as
much as possible. Complete cultured sod would be a
requirement.
~// ~/b S 2282
In answer to question about curbs and gutters, Lemberg
stated that catch basins would be placed in the proper
position so that curb and gutters could be installed at
a later date if desired.
James Boyd What becomes of our trees?
1788 Alberts
Sewer lines would probably have to go into the street,
Lembergs One thing we have to remember is that when sanitary sewer
goes in, it is down eight to ten feet. A storm sewer
generally is three to five feet.
Pehrsons How do you draw these boundary lines for a district?
Lembergs Somewhere a boundary has to be drarm. We took the high
point in the street, determined where the water runs, and
then where the water runs from the front of the lot.
~acMillens Has a survey actually been made to determine where. the
high point of these streets is? Possibly a re-survey
should be made because the grade has changed since 1958.
Lemberg: There is no need for a surv®y - the grade has not changed -
only seal-coating has been done since 1958.
A. L. Keller Would this rule out putting trees in the boulevard?
1852 Pascals
There has been some experience with trees and trouble
Lemberga because of the sanitary sewer. Dr. Hard w311 recommend
what kind of trees wottl.d be suitable.
Jensens Is it assumed that the benefits received are equal for
everybody?
Lemberga We know that the same amount of water falls on each foot
of property. We know that the run-off is basically the same.
Leslie Wickland We had drainage to the corner before the last re-surfacing
1'90 Holtons af£er the sanitary sewer went in. Since then, the water
does not ran off. I request that the maintenance department
attempt to clear this up. Grading was changed. I believe
this to be a reasonable request. How about a lift station
dust where the water is naw collecting?
Lembergs As far as a lift station type of thing is concerned, it
would probably cost X100,000 to be large enough to take a
big flow. It would be sitting most of the time, probably
75% of the time, and it would still need maintenance. Items
added for a lift station make it very expensive. When you
balance a complete gravity system as we have here, the only
maintenance is keeping grass off and other catch-alls off
the catch basins. In most cases, the gravity system is
most economical.
Chalmerss The amount of x:1.0,000 to go on general taxes - is that the
amount for the school?
Warkentiens No. The Falcon Heights School will be assessed like all the
other benefited properties.
2283 ~ I~ g~l,~
Ohalmerss T think one of the questions raised on the petition
is valid, Hard-surfaced property should carry a
higher assessment. I think the school property has
a lot more hard surface than I have on my property.
Warkentiens That may be true, but it is a very difficult task to
get a wholly equitable distribution.
A show of hands indicated the following:
For the project as proposeds Eleven
Against the project as proposeds Thirteen
Utnes According to report, it seems to me that 75~ of the
people said something had to be done, Putting something
around the ponding area is no answer.
Boyds The survey made indicates the feeling of the people.
~tacMillens The figure of 127 is in indication to me that the people
in this community want something to be done, but are
unwilling. to accept the plan as proposed.
Lembergs What would you propose? Three engineers have gone into
this and passed on it.
Kurt Rydberg I suggest alternate plans and a survey of the land,
1771 Alberts because as it is now, some of the water is rurm ing up
hi7.1, The breaking point is in front of my house.
Wickland: We did have satisfactory drainage to the corners of
Holton before the unitary sewer went in. We should
not need that stub in there now. We would much rather
see the street re-graded instead. T recommdnd that a
further study be made,
Lembergs Take the 215 feet of pipe as against the cost of
re-grading the street.
Rydbergs What is the difference in cost if you dig up the street
and re-grade?
Lembergs I don't know.
Upon request of MacMillan, Warkentien moved, Strandquist
seconded that the report submitted by MacMillan, and the
statements made in that report, be included verbatim in
the~:official minutes of this meeting. Ayess Warkentien
and Strandquist. Abstainings Stone and Black. Due to
lack of a majority vote, motion was not carried.
(citizens' answers to inquiry were included in the envelope
submitted, however, there were no statements in envelope.)
George Anderson Is this plan going to work like at 'Shell Lake' - I don't
1775 Alberts see how it can help anything at Albert near Larpenteur -
or what we call 'Shell Lake.'
1
1
1
Hearing Continued
to September 29,
1965s
C
~ /~~~
The following resolution was
who moved its adoptions
228l~
introduced by member Black
WHEREAS, a resolution of the Vi1l.age Council adopted
the 26th day of May 1965 fixed a date for a council hearing
on the proposed improvement of
That portion of the Village of Falcon
Heights bounded by Roselavsn Avenue,
Snelling avenue, Hamline Avenue, and
Larpenteur Avenue by the construction
of a storm severer drainage area here-
after called Improvement 65-1,
1
ANA WHEREAS, said hearing originally scheduled fvr
June 30 was postponed by resolution of said council on
June 23, 1965 until July 1l~, 1965, and
WHEREAS, ten days published notice of the hearing
through two weekly publications of the required notice was
given and the hearing was held thereon on the 1l~th day of
July 1965 at which time all persons desiring to be heard
were given an opportunity to be heard thereon, and
WHEREAS, said hearing vs'as then continued to August 18,
1965 in ord®r to receive a report from the Village of
Roseville,
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIZ OF THE
Village of Falcon Heights
1. Said public hearing is continued until September
29th 1965 at 8s00 P.M, in the Village Hall, 161a.?a.
West Larpenteur Avenue, Falcon Heights, Minnesota.
2. The Engineer shall obtain a report on the
progress of the Roseville Village proceedings, and
make such additional studies of the proposed improve-
ment as are necessary.
Adjournments
The foregoing motion was seconded by Stone and upon a vote
being taken thereon, the following voted in favor thereofs
Warkentien, Strandquist, Black and Stone and the following
voted against the same: None. Whereupon said resolution
was declared passed and adopted.
Uponmotion the meeting was ad3
Signeds
1
,7 '~?
Approved:
< ,
Mayor
at. 10:30 P.M.