HomeMy WebLinkAboutCCMin_58Jun30_SpecialSPECIAL MEETING JUNE 30th, 1958. `'"~'
~~~
Meeting was called to order at 7:05 with the following Council Members present:
Harold C. Nilsen, Mayor; George Shavor, Trustee; Willis Warkentien, Trustee; Paul
Coppini, Trustee and Wm. Utecht, Clerk. Also present were Frank Graham, Village
Attorney, and Ethel E. White, Deputy Clerk and Deputy Treasurer, Vern Ljungren,
Village Engineer and Dean Anklan, Ramsey County Maintenance Engineer.
Mayor Nilsen advised Mr. Anklan of our dissatisfaction with the work
the County had been doing on our streets and alleys. Mr. Anklan ad-
vised that this was due to the fact tha±, they had used some inexper-
ienced help; that this, however, was no excuse and the bill was being
adjusted. During the discussion it was brought out that the work on
the East side of Arona, with which the Council was particularly dis-
satisfied had been done by the County for the City of St. Paul. Engineer
Ljungren said that he had contacted Mr. Holzer of the City of St. Paul
and told him that he wanted to check compaction, etc. before they sur-
faced what had been dug up when laying the water main. Mr. Hindermann,
of the Village Street Commission, called him one day and told him the
County was working on the street without having given Ljungren a
chance to inspect compaction, drainage or material. It is also Ljun-
gren's opinion that repair work was done when trench was too wet.
Ljungren is to check at Arona, make up an itemized order specifying
work to be done and write the City.
Mr. Anklan pointed out that all the Villages in the County have a
stake in the equipment used by the County, and that the County does the
work for just about half of what it would cost to have a private contractor
do it. He advised they would send in an experienced crew to correct the
work previously done, including correcting the places where they had
stopped the drainage. He said they try to line up a days' work before
they send a crew into any one village, rather than fix one hole at a
time because it was more economical to plan a days work. He also said
they have to have a specific work order from Ljungren, our engineer,
before they can do anything. Ljungren was instructed to issue a work
order as follows:
Sweep, patch and seal coat Ruggles from Haml'i~e to Albert, Garden from
Maple Knoll to Snelling, Paint Barricade at F~-~ Cnd of Iowa, Repatch
alleys where water has been stopped, Arona to Albert between California
and Larpenteur.
Regarding complaint about crews going to breakfast after presumably
reporting for work; Anklan advised that they were not supposed to, but
that: the oilers were starting work between five and six and were en-
titled to a coffee break about 8 or 9. Anklan also advised that
where County Streets are torn up to install sewer or other utilities,
the County does not take over again until the responsible party puts
the street back into acceptable shape; and then the County resumes
maintenance. He said the County is more than willing to help out with
drainage problems; but that it is up to the sewer installers to see
that the trench is properly compacted and patched. The County takes a
"Hands Off" policy until local contractors finish and turn streets back.
Wm. Chenowith, Ramsey County Traffic Safety Engineer, has charge of
painting -- he has some new equipment which isn't working out quite
right and he is far behind schedule, but they expect to be able to start
very soon.
Coppini said he felt it .would be a good idea if the County would advise
those in the villages who are responsible for the street work when the
various jobs had been finished. Anklan advised it had never been done,
~~ ~~
but he thought it might be a good idea. He thinks sending a work
order on each specific item, is a good idea and should be followed
through.
TATUM ST. At 7:30 P. M. the Mayor announced that the Council would consider the
I."~PROVE- bids received for the Tatum Street Improvement in accordance with the
"J~ENT. provisions of the advertisment for bids which was read, such adver-
tisment for bids having been published in the Rose Tribune June 19th
and 26th.
One bid was received from T. A. Shifsky & Sons, 361 Z'6. County Road
E., St. Paul, 12, Minnesota for the improvement of Tatum Street
from Larpenteur Avenue to Roselawn Avenue according to specifications
prepared by Vern L. Ljungren, Village Engineer.
There was a bid bond attached in the amount of one thousand dollars.
The total construction cost of.the oid is ~8,673.l~5. It was signed
by T. A. Shifsky, President, T. A. Shifsky & Sons, Inc.
It was moved by Nilsen, seconded by Utecht that the yid submitted by
T. A. Shifsky & Sons, Inc., for the improvement of Tatum Street from
Roselawn Avenue to Larpenteur Avenue in the amount of ~8,673.1~5 be
referred to Vern Ljungren, Village Engineer, for tabulation and
recommendation. Motion unanimously carried.
CRAWFORD Mayor Nilsen advised that the resident living at 1532 Crawford re-
ALLEY ported that there was considerable water standing in the alley between
Crawford and Larpenteur; and that if there was any amount of rain, the
second garage from the corner would be flooded. Engineer Ljungren ad-
vised. that the Drain Pipe that runs under the Flameburger which for-
merly handled some of this water had been broken. There was a ques-
tion as to whether the benefitted property owners could Le assessed
for repairing this pipe, and the matter was turned over to Engineer
Ljungren and Attorney Graham for further checking. It was pointed
out that if the condition should become very serious, we could have
the Fire Department pump the water as a temporary solution.
ALLEYS It was moved by Utecht, seconded by Vdarkentien that the following
resolution be adopted:
IT WAS RESOLVED BY THE VILLAGE COUNCIL OF FALCON HEIGHTS
1. That the petition requesting the improvement of the alley between
Iowa and Hoyt from the east line of Pascal to the west line of Albert
by grading and bituminous stabilization according to Village Standards
which is hereby declared to be signed by the required percentage of
vrmers~~gfoproperty affected thereby. This determination is made in
conformance to Minn. Stat. 429.035.
2. That the petition requesting the improvement of the alley between
California and Idaho from the east line of Albert to the West line
of Hamline by grading and bituminous stabilization according to
Village Standards w'~ich is hereby declared to be signed by the re-
quired percentage of owners of property affected +„hereby. This deter-
mination is made in conformance to Minn. Stat. l~29.035.
3. These petitions are hereby referred to Vern L. Ljungren, Village
Engineer, and he is instructed to report to the Council advising the
Council in a preliminary way as to whether the proposed improvements
are feasible, and as to whether they should best be made as proposed
or in connectkon with other improvements, and of the estimated cost
1
1
1
of the improvements as recommended. Motion unanimously carried.
It was moved by Warkentien, and seconded by Nilsen
WHEREAS, it is proposed to improve the alley between California
and Idaho running from the eat line of Arona to the West line of
Fascal by grading and bituminous stabilization according to
Village Standards and to assess the benefitted property for all or
a portion of the cost of the improvement pursuant to Minn. Stats.
429.011 to 429.111,
NOW THEREFORE BE IT RESOLVED BY THE COUNCIL OF T~'E VILLAGE OF FALCON
HEIGHTS, MINNESOTA, that the proposed improvement be referred to
Vern L. Ljungren, Village Engineer, for study, with the request
that he report to the Council advising the Council in a preliminary
way as to whether the proposed improvement is feasible, as to
whether it should best be made as proposed or in connection with
some other improvement, and the estimated cost of the improvement as
recommended.
Motion unanimously carried. Ayes recorded: Nilsen, Shavor, Warken-
tien, Coppini, Utecht.
TATUM Ljungren reported that he had checked the Schifsky bid and that it was
STREET in order. It was exactly $10.00 less than he had estimated.
BID
TATUM ST. Ljungren pointed out that additional piping on Tatum Street would call
DRAINAGE for the expenditure of an additional $6375.00 or so. At this point
Graham and Ljungren left the meeting to consult with Mr. hemmer and
others regarding easements.
~V Rr~
BID It was moved by Utecht, seconded by Nilsen and unanimously voted that
TATUM ST. the bid received from T. A. Shifsky & Sons, Inc., for the improvement
Il~4PROVE- of Tatum Street from Larpenteur Avenue to Roselawn Avenue be referred
i~IENT to Engineer Ljungren for further checking and report at the next meeting.
GAGE It was moved by Utecht and seconded by Warkentien that preliminary
PROPOSED approval be given the proposed plat of Falcon Woods Addition #2,
DEVELOP- subject to the Village Engineer's written 0. K., for presentation
MENT to the County Plat Commission. Motion unanimously carried.
POLICING It was moved by Nilsen, seconded by Coppini, that Warkentien be
appointed as the Falcon Heights representative on the Ramsey County
Municipal Officials Association committee for Rural Ramsey Policing.
Motion unanimously carried.
RECESS 9:30 Meeting was recessed awaiting the return of Graham & Ljungren.
RECONVENE Meeting reconvened at 10:15 P. I~4, and Attorney Graham discussed
easements in general.
ADJOURN- On motion, the meeting adjourned at 10:45 P. M.
MENT ~~~
Signed ~~
Clerk.
Approved- ~~ ~~~~
Mayor.