HomeMy WebLinkAboutCCMin_59Aug5_Special-SPECIAL MEETING AUGUST 5th, 1959. __. _.. ;. ..
l~ieeting was called to order at 5:10 P. M., the following Council Members being
present: Harold C. Nilsen, Mayor; George Shavor, Trustee; Will-is Warkentien,
Trustee; Paul Coppini, Trustee and Wm. R. Utecht, Clerk. Also present were
Vernon L. Ljungren, Village Engineer and Ethel E. White, Deputy Clerk and Deputy
Treasurer. Absent Wm. E. Olsen, Treasurer.
Driveway After discussion, it was moved by Utecht, seconded by Coppini and
Hermes unanimously voted that the Village Engineer be authorized to furnish
Greenhouse a letter to the County and State Highway Department to the effect
that the Village has plans for the construction of Prior Avenue from
Larpenteur Avenue North within a couple years and to request that
the appropriate opening be left in the median strip.
Water Main After discussion, it was moved by Nilsen, seconded by Shavor and
Resolution unanimously voted that the following resolution be adopted:
"RESOLVED That the St. Paul Water Department is hereby authorized
to revise the Snelling Avenue Water Main to allow for the connection
of the proposed 12" water main extending west on Larpenteur Avenue
and that the Village of Falcon Heights hereby agrees to reimburse
the St. Paul Water Department for its costs in doing this work es-
timated to be approximately X2,250. as set-out iri the letter of
the St. Paul Water Department dated June 26th, 1959."
"RESOLVED FURTHER, that the Village of Falcon Heights purchase at
cost from the St. Paul Water Department and hereby agrees to pay
the St. Paul Water Department for the following materials:
1. Approximately 520 feet of 12 inch cast iron water main.
2. Two 12 inch gate valves with valve boxes.
3. One 12 inch by 6 inch tee with suitable plug."
Two certified copies of the above resolution were given to Engineer
Ljungren for presentation to the St. Paul Water Department.
Ljungren's letter of August 5th to the Water Department was read.
It stated they were delivering 2 sets of plans and specifications
for the Larpenteur Avenue Water Main .Improvement and 2 executed
copies of a resolution authorizing them to proceed with the work
as shown on the above mentioned drawings.
Ljungren's letter of August 5th addressed to Harry S. Bronson, County
Engineer, was read. It stated he was attaching 2 sets of plans and
specifications for the construction of watermain along Larpenteur
Avenue to a point approximately 7261 east of Cleveland Avenue. Plans
provide for main to be located 10 feet north of their south right-of-
way line on Larpenteur from the east limits of the University property
to Fairview Avenue and 10 feet south of their north right-of-way line
from Fairview west to the Rose Hill Nursery property. The Village
Council, at a special meeting of August 5th, 1959, authorized Milner W.
Carley ~c Associates to contact Bronson, County Engineer, to make a re-
quest for the use of the above mentioned right-of-way. Ljungren has
contacted Robert Ashbach, of Ashbach Construction Company, regarding
holding up finishing operations on the ditches in the locations men-
tioned above until such time that the water main has been installed.
ltgr. Ashbach is agreeable to this, providing the County issue a change
~.~~~
order authorizing this extension. Mr. Ashbach stated there would
be no charge for this delay.
L~ungren reported he had talked to McCubrey and Fadden of the
Highway Department neither of whom see any reason why there should
be any hold up on permission to work on the water main at Snelling
and Larpenteur.
Regarding the Booster pump, the water department likes to see the
Hump above the ground. There is some question whether the Health
Department will permit the under ground pumping station. They
feel an above ground pumping station is easier to maintain and
cleaner. Water Department has always required a pressure tank
which provides a positive air brake between the pump and the main.
L~ungren says he doesn't see how we could work up a reverse press-
ure. A pressure tank wouldn't involve much difference in cost
dust the float ~ralve and tank. They want pump and con trols above
ground, but haven't definitely turned down the proposal. The
pumping station would be 8 feet x 8 feet x 32 feet and if we have
to put it above ground, it might have to go back of the Village
Hall-and the line would have to go through the cross-over which
would require extra pipe and increase the cost. L~ungren thinks we
we might be able to resolve it with a pressure tank which won't
cost much.
Bids for Bids for Patching and Seal Coating were opened and read as follows:
Seal coating
& Patching Ray Sina Contracting Co., Ines 403-8th Avenues N. ~1., New Brighton,
Minnesota.
20,000 gallons bituminous material for seal coat .18 gal ~I+3600.00
940 tons seal coat aggregate 4.40 ton 4136.00
50 tons patching material 17.50 ton 875.00
1$a 1.0~
Bid Bond was enclosed in the amount of 10~ of bid.
T. A. Schifsky & Sons, Inc., 603 N. W. 2nd St.~ No. St. Paul, Minn:
20,000 gallons bituminous material for seal coat .19 gal `3800.00
940 tons seal coat aggregate 4.25 ton 3995.00
50 tons patch material 19.00 ton 950.00
7
Bid bond was enclosed in the amount of 10~ of bid..
J. W, Craig Co., 1814 California St., N. E., Mpls., 18, Minn:
20,000 gallons bituminous material for seal coat .l$ gal X3600.00
940 tons seal coat aggregate 8.35 ton 7849.00
50 tons patch material 18.00 ton 900.00
$123 .
Alternate bid FA1 940 tons at ~b7.85 ton X7379.00. Al-
ternate total $11879.00
Rid bond was enclosed in the amount of 10% of bid.
Burry & Carlson Inc., No. 1 - 19th Ave.! So., Mpls., 4, Minn.:
20,000 gallons bituminous material for seal coat .19 tal X3800.00
940 tons seal coat aggregate 8.50 ton 7990.00
50 tons patch material 20.00 ton 1000.00
-
~
lk12 790.00
Bid bond was enclosed in the amount of 10~ of bid.
~.~r~,
It was moved by Utecht, seconded by Nilsen and unanimously '`'"'-` ~
voted that the bids be referred to-Engineer L~ungren for checking.
L~ungren reported he checked the extensions of the two low bids
and they appear satisfactory and correct; that, based `on past ex-
perience in the Village of Falcon Heights, he would recommend that
the bid be awarded to T. A. Schifsky & Sons, Inc., 603 N. W. 2nd
St., North St. Paul, Minnesota, as the lowest responsible bidder.
It was moved by Coppini, seconded by Warkentien, and unanimously
voted that the papers be turned over to Attorney Graham for checking,
and if found to be in order, that the bid be awarded to T. A.. Schifsky
& Sons, Inc.
Fry St. Letter of August 5th, 1959, from Vernon L. L~ungren of Milner W.
Water Main Carley & Associates was read: It stateds "As per your request, we
Extension have prepared a preliminary plan and have made afield inspection
of the proposed extension of watermain on Fry Street from Larpenteur
Avenue to Maple Knoll Drive, and wish to recommend as follows
1. That the proposed improvement is feasible.
2. We would estimate-the improvement to cost X36,750.00.
3. That the improvement may be carried out alone and need not be
combined with another improvement."
After discussion, it was moved by Nilsen, seconded by Warkentien
and unanimously voted that the following RESOLUTION be adopted:
RESOLUTION: Whereas it is proposed to improve Fry Street from Lar-
penteur Avenue to Maple Knoll Drive by extending water mains from
Larpenteur Avenue to Maple Knoll Drive and to assess the abutting
property for all or a portion of the cost of the improvement, pur-
suant to Minn. State. x.29.011 to X29.111,
NOW THEREFORE BE IT RESOLVED 3Y THE VII~LACJE COUNCIL OF ZI-IE VILLAGE
OF FALCON HEIGHTS, MINNESOTAs
(1) The Council will consider the improvement of Fry Street by
extending water mains from Larpenteur Avenue to Maple Knoll Drive
in accordance with the report of Milner W. Carley & Associates,
dated August 5, 1959, stating that the improvement is feasible
and can best be caY~ried out as proposed, and the assessment of the
abutting property for all or a portion of the cost of the improve-
ment pursuant to Minn. State. l~29.011 to l~29.111 at an estimated
total cost of the improvement of X6750.00.
A PUBLIC HEARING shall be held on such proposed improvement on
Monday, August 2l~th, 1959, in the Council Chambers in the Village
Hall at 7:30 P. M. and the Clerk shall give Public Notice of such
Hearing and Improvement as required by law.
N0. NAT. GAS. It was moved by Nilsen, seconded by Shavor and unanimously voted
Increase that the Clerk write. J. H. Gutride, Secy., Federal Power Comm.,
!~lil G St., N. W. Washington, 25, D. C. stating that the Village
of Falcon Heights strongly urges that no further rate- increases
be granted Northern Natural Gas and respectfully requests that
their application be denied, with copies of the letter to go to
Senators Hubert Humphrey and Eugene McCarthy, as well. as Representa-
tive Jos. D. Karth.
Art After discussion, it was moved by Shavor, seconded by Warkentien
Lindig and unanimously voted that Art Lindig be authorized to construct
a commercial sewer service connection but not be allowed to
connect the building at this time - the service extension and
stub to be built in accordance with the Village Engineer's
Specifications and in accordance with the proper ordinances. In-
spection to be made by the Village Engineer..
Adjournment On motions the meeting adjourned at 6:15 P. M.
Approved ~~~~z~ ~ !~%?~~
Mayor.
Signed
1 ge 1 rk"