Loading...
HomeMy WebLinkAboutCCMin_62Aug1_Special1788 SPECIAL MEETING 8/1/62 Meeting was called to order at 7s30 P. M., the following Members of the Council being presents Harold C. Nilsen, Mayor; W. A. Mortenson, Clerk; Charles P. Stone, Trustee; Willis Warkentien, Trustee. Also present were B. Lemberg, Engineer; and Ethel E. White, Deputy Clerk and Deputy Treasurer. Absent: George J. Shavor, Trustee. Building Letter of July 28th from. George Croft, resigning as Inspectors .Building Inspector and Zoning Administrator, due to the press of his private business was read. It was moved by Stone, seconded by Mortenson and voted to accept Croft's resignation with regret. Mayor Nilsen moved the appointment of R. K. Magnuson, 1$10 No. Holton as Building Inspector and Zoning Administrator for the Village of Falcon Heights. Seconded by Stone and carried. Special Hearing The Special Hearing was opened at 8:05 P. M. Clerk Morten- Proposed Improve- son read copy of notice as published and mailed to the res- ment of Iowa Ave. idents abutting Iowa Avenue, also letter sent to them. by installation Mayor Nilsen advised that the Village had received petitions of curbs and signed by approximately 75~ of the owners of property gutters. abutting on Iowa Avenue from Hamline Avenue to Arona Avenue. The Council then thought it might be well to include the block from Arona to Snelling Drive to give the street a "finished look", feeling also that the residents of that block might want to have curb and gutter, and inasmuch as the lax permits deleting part of a project but does not permit the enlargement of it, this was done. Mayor Nilsen reported he had contacted a resident of that block, asking that he inform his neighbors about the proposal. Engineer Lemberg outlined the plans pointing out that the installation of curb and gutter would improve drainage and preserve the black-top by preventing pot holes which permit the water to seep under the mat thereby causing it to break up. The Council heard all who wished to speak for or against the project. In the block between Arona and Snelling Drive, the owners of five homes petitioned against the installation of curb and. gutter. That represented. a 5/9 majority of the property owners on that block. A fex people requested that their names be crossed off the petitions covering the blocks from Hamline to Arona. However, that still left a strong majority in favor of the curb and gutter installation. The following points were brought out: The Council would try to hold the assessed cost to X2.50 per foot. The boulevards would be blended in, sod replaced with cultured sod, boulevard to property line crossings at corners would be finished with concrete sidewalks, the street edge would be finished to blend with curb and gutter. 1789 Stone moved that the Village proceed with the curb and gutter project on Zawa Avenue in the blocks between Hamline and Arona, and eliminate from the pro3ect the block between Arona and Snelling Drive inasmuch as the property owners did not seem to favor curb and gutter at the present time. Seconded by Warkentien and carried. After discussion, it was moved by Stone, seconded by Warkentien and voted to adopt the following RESOLUTION ORDERING IMPROVEMENT OF IOWA AVENUE HY INSTALLATION OF CONCRETE CURBS AND GUTTERS FROM THE EAST LINE OF HAMLINE AVENUE TO AND INCLUDING THE EAST SIDE OF ARONA AVENUES WHEREAS, a resolution of the Village Council adopted the 18th day of July, 1962, fixed the date for Council Hearing on the proposed improvement of Iowa Avenue from the Snelling-Idaho Ponding Area. to the East line of Hemline Avenue by insta~lation of curbs and gutters, and WHEREAS, 10 days published notice of the He•~~ring through two weekly publications of the required notice was given, and the hearing thereon was held on the 1st day of August, 1962, at which all persons desiring to be heard were given an opportunity to be heard thereon, NOW THEREFORE, BE IT RESOLVED by the Village Council of the Village of Falcon Heights, Minnesotan (1) Such improvement is hereby ordered from the East line of Hemline Avenue to the East line of Arona Avenue as proposed in the Council Resolution adopted July 18, 1962. (2) Bonestroo, Rosene ~ Associates hive been designated as engineers for this improvement and they are instructed to continue the preparation of plans and specifications for the making of such improvement as ordered by resolution of the Falcon Heights Village Council on July 25, 1962. On motion by Stone, seconded by Warkentien, it was voted to approve the following RESOLUTION A'?PROVING PLANS AND SPECI- FICATIONS ANA ORDERING ADVERTISEMENT FOR BIDS: WHEREAS, pursuant to Resolution passed by the Council on July 25, 1962, the Village Engineer has prepared plans and specifications for the improvement of Iowa Avenue between the East line of Arona Avenue and the East line of Hemline Avenue by construction of concrete curbs and gutters and has presented such plans and specifications to the Council for approval, Nd~ff THEREFORE, BE IT RESOLVED by the Council of the Village of Falcon Heights (1) Such plans and specifications, a copy of which are attached hereto and made a part hereof, are hereby J 1790 annroved. (2) The Village Clerk shall prepare and shall cause to be inserted in the official newsoaner an advertisement for bids upon the making of such improvement under such approved plans and specifications. The advertisement shall specify the work to be done, shall state that bids will be received by the Clerk until 8 p. m. on the 22nd day of August, 1962, at which time they will be publicly opened in the Council Chambers of the Village Hall by the Village Clerk and engineer, will then be tabulated and will be considered by the Council. No bids will be considered unless sealed and filed with the Clerk and accompanied by a cash deposit, cashier's check, bid bond or certified check payable to tk~e Clerk for 5~ of the amount of such bid. Snelling-Idaho t}n motion by Warkentien, seconded by Stone, it was moved Playground Fence to approve Contractors Estimate #1 and fina3 in favor of Improvement: Pdinnesota Fence and Iron Works, Inc., in the amount of ~2,Q?Q.59 covering labor and material on the Snelling Idaho F1.ay~round Fence Improvement. Adjournment: On motion, the meeting was ad3ourned at 10:15 P. M. _____-- Signed ~,~~ Clerk Approved--~ ~~ ~'" ~' ~ " Mayor 1