Loading...
HomeMy WebLinkAboutPCMin_92Jul8_Special• MINUTES SPECIAL PLANNING COMMISSION MEETING July 8, 1992 6 p.m. PRESENT: ABSENT: ALSO PRESENT: Lee Barry Ed Finegan Susan Hoyt, Administrator Len Boche acting as Planner Marie Furton Paul Ciernia, Councilmember Steve Huso (arrived at 6:30) Bill Westerberg, City Carolyn Nestingen Engineer Ken Salzberg Tim Malloy, Planner with Dahlgren,Shardlow Meeting was called to order at 6 p.m. by Lee Barry, chair. Minutes of the June 22, 1992 were approved as written. APPROVAL OF THE FINAL PUD FOR ROTTLUND HOMES DEVELOPMENT MAPLE KNOLLS Chairman Barry asked the city engineer to review the status of • the project. Bill Westerberg reviewed his letter dated 7/8/92 regarding the plans prepared by Pioneer Engineering for the Rottlund Homes Maple Knolls Development. He said that the project was complete except for the submission of drainage calculations and a change in the grading plan to note the change in the increase in the pond at the north end of the site. Westerberg also said Falcon Heights and Rottlund Homes negotiated for a deposit of $10,000 for the construction of the utilities and 100 percent of the cost of landscaping (includes sod, seeding and mulching). Salzberg moved to approve the final PUD for Rottlund Homes Maple Knolls Countyard. Seconded by Furton and unanimously approved. Commissioner Boche moved to change the name from Maple Knolls to a name relating more to the street accessing it, such as Prior Place, Prior Court, Prior Heights, etc. The motion failed for lack of a second. REQUEST FOR A VARIANCE IN THE NUMBER OF SIGNS AT 1691 NORTH SNELLING AMOCO requested a variance signs on two new canopies renovation project. AMOCO square footage of allowed staff found the request wa in the city sign code to accommodate that are planned as part of an overall originally requested a variance in the sign area. However, after review, s necessary for the number of signs, not the square footage of sign area. (The signs on the original • canopies constructed in 1976 did not have variances.) §9-13.02 Subd.3(b) permits one sign per lot frontage. In addition, §9-13.03 Subd.7 permits one pylon sign for fuel stations. Because it is a corner lot, AMOCO would be permitted three signs within the code. The proposed signs require a variance to allow six signs instead of three. Because each canopy is considered a sign making the total number of signs six. This includes three signs on the existing building, two canopies and the pylon sign. AMOCO representatives explained that there would be signs on two sides rather than on three sides of each canopy to reduce sign clutter. The proposed sign area is 220 sq. ft. which is down from the present 360 sq. ft. Tim Malloy, consulting planner, updated the commission on a meeting with AMOCO representatives and summarized the variance request. An overhead showing the existing and proposed site plans was discussed. The existing pylon sign will be replaced with a smaller version placed further back from the property line to significantly improve visibility at this intersection. Mr. Warner, from Warners' Stellian, asked if the new pylon sign would remain at • the current angle. Mr Schroeder from AMOCO said it would. There being no further questions, Huso moved to approve the variance on signs as described to reduce the current sign clutter at this intersection. Seconded by Boche and unanimously approved. Meeting adjourned at 7:10. Susan Hoyt, Administrator Dee Swenson, Recording Secretary •