Loading...
HomeMy WebLinkAboutCCRes_86-05No. R-86-S . CITY OF FALCON AEIGHTS CODIiCIL RESOLUT201 Date January 22, 1986 A RESOLQTION BELAYING TO ESTABLISHING INCREASED NtECkIANICAL'REPMIT FEES FOR THE CITY OF FALCON HEIGHTS WHEREAS, the City Council of the City of Falcon Heights has reviewed the current heating permit fees, and WHEREAS, it has been determined that the present fees are not feasible at this time, NOW, THEREFORE, BE IT RESOLVED by the-City Council of the City of Falcon Heights to set the fees as listed on Exhibit A (see attached). -----------------------------------------------~M~ _ ~ ~ - _~~__~.. . Moved by Mayor Baldwin /-, ~ Approved by ~,/~~t~~ ~,c~t~~~~~-~=-~ Seconded by Councilmember Hard mayor ~~ Yeas Nays Dat • ~ ~ierr~a ~In Favor Attested by /~~~~ ` ' ~~ ~/Daldvin Clerk AdmiA. ~,~lard I~heaoveth Adopted by Council ~ARaiast January 22, 1986 ` ~~' at CITY OF FALCON HEIGHTS 644-5050 Jaauary 1, 1986 `"1~ECHANICAL PERMIT .FEES Pee • Item ?5.00 Basic $ 5.00 -Each Gas Aaplisace (rchine, device, heattr, sage, refri;sratos, ;as dryer, i~ atone, ;aa hot eater heater os other appliance) requiria; .the ase of asnufacturtd ;as, natural Bas or liquid petrole~ ;as. 10.00 bas lipintt $500.00 valuation or leap (repair or installation) ` $ 4.00 Eacb additional $500.00 cost of sepair or installation _Gas Burners or Gas burner P.Quipmeat or Oil Eusning ~uraaces or 3oiltrs $ ?0.00 Pitst 200,000 ETiJ iaput or less $ 3.00 Each additional 100,000-iaput ar fraction thereof $175.00 Mauisun fse for each unit Steas.Warm Aire or. Hot dater Heating Systea $< 35.00 Brat ?00,000 iTU iaput-.for ?construction or alteration of sny ~as~a air .furnace duct Dark 4.00 Each additioaal 100,000 lTU iaput or fraction $ 35.00 Pirst ?00,000 sTU faput per unit for installation oz rsplaceaent of each ales: or hot ester systsa $ -4.00 Each additional 100,000 ETUs or fraction hereof (240 z IDIt ~ DZ'tTs/hr) $ 15.00 ter Dnit on wait heaters, based on first 100,000 ETIJ iaput 3.00 Each additional 100,000 ETD input or fraction thereof • tacinerators $ 15.00 Installation or repair of each doaestic incinerator $ 50.00 Installation or repair of sack casaercial incinerator. fir Conditioning sad ttfrigeration Rork $ -20.00 Pirat S tons an any air conditioning or refri;eratioa project (60,000 ETUS) 3.00 Lcb additional ton or frutian thereof (12,000 ETOs) $i17S.00 H~isue fee per snit $ 2S.00 Pirst S tons (60.000 fTOs) of coolie= for duct sort for air-conditioning 3.00 inch ton (1?,000 S'1'as) or fraction thereof aver .first S tons for duct Bork for air tonditionin; Ttntilating Systes~s 25.00 Pirst 2,000 C!M per Wait ;$ 5.00. Each additional 1,000 CPM or #raction thereof per smit $ 3.00 each bathrooms eshaust fan in a sultiple duelling folaz Heating $ 15.00 Each installstion •