HomeMy WebLinkAboutCCRes_80-23CITY OF FALCON HEIGHTS
Pursuant to due call and notice thereof, a Regular Meeting of the City
• Council of the City of Falcon Heights, Minnesota was held on the 27th day of
August, 1980.
The following members were present: Acting Mayor Brown, Councilmembers
Steele, Eggert and Larson and the following were absent: Mayor Warkentien.
Councilmember Larson introduced the following resolution and moved its adoption.
RESOLUTION 80-23
A RESOLUTION ESTABLISHING A FEE SCHEDULE RELATING
TO GAS APPLIANCES, INCINERATORS, AIR CONDITIONING,
VENTILATING AND REFRIGERATION SYSTEMS
WHEREAS, Ordinance No. 23 of the City of Falcon Heights regulates the in-
sts.llation, alteration, repair or service to gas burners, gas burner equipment,
portable or domestic incinerators, and other gas appliances, and
WHEREAS, said Ordinance establishes certain minimum fees for certain types
of gas appliances but allows the council to set by resolution fees relating to
the compensation of the gas inspector, and
WHEREAS, Ordinance No. 23 was adopted in 1953, making the fee schedule
considerably out of date, and
WHEREAS, the City is desirous of establishing by resolution a fee schedule
• relating to gas appliances, incinerators, together with air condition, ventilating
and refrigeration systems, and
WHEREAS, the City is desirous of establishing by resolution a division of
the fees received between itself and the gas inspector;
NOW, THEREFORE, BE IT RESOLVED as follows:
1. The fees to be charged for installation of gas appliances and gas piping,
together with incinerators, ventilation systems, air conditioning and refrigeration
work shall be set ~fo~ah. in the attached schedule. The attached schedule states
the total fee for each installation or appliance, which is a combination of the
minimum fee established by ordinance and the additional fee established for this
work. Thus the total fee for each installation is as set forth in the attached
schedule.
2. Of each fee received, the City shall retain 25% and shall remit to the.
gas inspector 75%. A periodic accounting of these fees shall be made by the City
Clerk as between the gas inspector and the City.
3. This resolution is effective from and after August 13, 1980.
The motion for the adoption of the foregoing resolution was duly seconded
by Councilmember Eggert and upon a vote being taken thereon, the following voted
in favor thereof: Acting Mayor Brown, Councilmembers Steele, Eggert and Larson
and the following voted against same: None.
• WHEREUPON, the resoluuion was declared duly passed and adopted.
Atte ~~ ~ ioy~''r`~
Helen L. Brown, Acting Mayor
Dewan B. Barnes, Clerk Administrator
Regular City Council Meeting of August 27, 1980
August 13, 1980
CITY OF FALCON HEIGHTS
1644 W. LARPENTEUR
FALCON HEIGHTS, MN 55113
~4-5050
HEATING PERMIT
Flil'. SC1lEDULL;
Fee Item
$ 5.00 Each Gas Appliance (machine, device, heater, range, refrigerator, gas
dryer, gas stove, gas hot water Yieater or other appliance) requiring
the use of manufactured gas, natural gas or liquid petroleum gas.
$ 5.00 Gas Piping $500.00 valuation or less (repair or installation)
$ 2.00 Each additional $500.00 cost of repair or installation
Gas Burners or Gas Burner E ui ment and Oil Burnin Furnaces or Boilers
$ 7.50 First 200,000 BTU input o less
$ 1.25 Each additional 100,000 input or fraction thereof
$175.00 Maximum fee for each unit
Steam, Warm Air or Hot Water Heating System
$ 15.00 First 200,000 BTU input for construction or alteration of any warm air
furnace duct work
$ 2.00 Each additional 100,000 BTU input or fraction
$ 15.00 First 200,000 BTU input per unit for installation or replacement of each
steam or hot water system
2.00 Each additional 100,000 BTUs or fraction thereof (240 x EDR = BTUs/hr)
7.50 Per unit on unit heaters, based on first 100,000 BTU input
$ 1.25 Each additional 100,000 BTU input or fraction thereof
Incinerators
$ 5.00 Installation or repair of each domestic incinerator
$ 20.00 Installation or repair of each commercial incinerator
Air Conditioning and Refrigeration Work
$ 10.00 First 5 tons on any air conditioning or refrigeration project (60,000 BTUs)
$ 1.00 Each additional ton or fraction thereof (12,000 BTUs)
$175.00 Maximum fee per unit
$ 15.00 First 5 tons (60,000 BTUs) of cooling for duct work for air conditioning
$ 1.50 Each ton (12,000 BTUs) or fraction thereof over first 5 tons for duct
work for air conditioning
Ventilating Systems
$ 8.00 First 2,000 CFM per unit
$ 3.00 Each additional 1,000 CFM or fraction thereof per unit
$ 3.00 Each bathroom exhaust fan in a multiple dwelling
Solar Heating
$ 15.00 Each installation
•