Loading...
HomeMy WebLinkAboutCCRes_80-23CITY OF FALCON HEIGHTS Pursuant to due call and notice thereof, a Regular Meeting of the City • Council of the City of Falcon Heights, Minnesota was held on the 27th day of August, 1980. The following members were present: Acting Mayor Brown, Councilmembers Steele, Eggert and Larson and the following were absent: Mayor Warkentien. Councilmember Larson introduced the following resolution and moved its adoption. RESOLUTION 80-23 A RESOLUTION ESTABLISHING A FEE SCHEDULE RELATING TO GAS APPLIANCES, INCINERATORS, AIR CONDITIONING, VENTILATING AND REFRIGERATION SYSTEMS WHEREAS, Ordinance No. 23 of the City of Falcon Heights regulates the in- sts.llation, alteration, repair or service to gas burners, gas burner equipment, portable or domestic incinerators, and other gas appliances, and WHEREAS, said Ordinance establishes certain minimum fees for certain types of gas appliances but allows the council to set by resolution fees relating to the compensation of the gas inspector, and WHEREAS, Ordinance No. 23 was adopted in 1953, making the fee schedule considerably out of date, and WHEREAS, the City is desirous of establishing by resolution a fee schedule • relating to gas appliances, incinerators, together with air condition, ventilating and refrigeration systems, and WHEREAS, the City is desirous of establishing by resolution a division of the fees received between itself and the gas inspector; NOW, THEREFORE, BE IT RESOLVED as follows: 1. The fees to be charged for installation of gas appliances and gas piping, together with incinerators, ventilation systems, air conditioning and refrigeration work shall be set ~fo~ah. in the attached schedule. The attached schedule states the total fee for each installation or appliance, which is a combination of the minimum fee established by ordinance and the additional fee established for this work. Thus the total fee for each installation is as set forth in the attached schedule. 2. Of each fee received, the City shall retain 25% and shall remit to the. gas inspector 75%. A periodic accounting of these fees shall be made by the City Clerk as between the gas inspector and the City. 3. This resolution is effective from and after August 13, 1980. The motion for the adoption of the foregoing resolution was duly seconded by Councilmember Eggert and upon a vote being taken thereon, the following voted in favor thereof: Acting Mayor Brown, Councilmembers Steele, Eggert and Larson and the following voted against same: None. • WHEREUPON, the resoluuion was declared duly passed and adopted. Atte ~~ ~ ioy~''r`~ Helen L. Brown, Acting Mayor Dewan B. Barnes, Clerk Administrator Regular City Council Meeting of August 27, 1980 August 13, 1980 CITY OF FALCON HEIGHTS 1644 W. LARPENTEUR FALCON HEIGHTS, MN 55113 ~4-5050 HEATING PERMIT Flil'. SC1lEDULL; Fee Item $ 5.00 Each Gas Appliance (machine, device, heater, range, refrigerator, gas dryer, gas stove, gas hot water Yieater or other appliance) requiring the use of manufactured gas, natural gas or liquid petroleum gas. $ 5.00 Gas Piping $500.00 valuation or less (repair or installation) $ 2.00 Each additional $500.00 cost of repair or installation Gas Burners or Gas Burner E ui ment and Oil Burnin Furnaces or Boilers $ 7.50 First 200,000 BTU input o less $ 1.25 Each additional 100,000 input or fraction thereof $175.00 Maximum fee for each unit Steam, Warm Air or Hot Water Heating System $ 15.00 First 200,000 BTU input for construction or alteration of any warm air furnace duct work $ 2.00 Each additional 100,000 BTU input or fraction $ 15.00 First 200,000 BTU input per unit for installation or replacement of each steam or hot water system 2.00 Each additional 100,000 BTUs or fraction thereof (240 x EDR = BTUs/hr) 7.50 Per unit on unit heaters, based on first 100,000 BTU input $ 1.25 Each additional 100,000 BTU input or fraction thereof Incinerators $ 5.00 Installation or repair of each domestic incinerator $ 20.00 Installation or repair of each commercial incinerator Air Conditioning and Refrigeration Work $ 10.00 First 5 tons on any air conditioning or refrigeration project (60,000 BTUs) $ 1.00 Each additional ton or fraction thereof (12,000 BTUs) $175.00 Maximum fee per unit $ 15.00 First 5 tons (60,000 BTUs) of cooling for duct work for air conditioning $ 1.50 Each ton (12,000 BTUs) or fraction thereof over first 5 tons for duct work for air conditioning Ventilating Systems $ 8.00 First 2,000 CFM per unit $ 3.00 Each additional 1,000 CFM or fraction thereof per unit $ 3.00 Each bathroom exhaust fan in a multiple dwelling Solar Heating $ 15.00 Each installation •