HomeMy WebLinkAboutCCRes_06-07• CITY OF FALCON HEIGHTS
RESOLUTION NO. 06-07
March 8, 2006
RESOLUTION RECEIVING FEASIBILITY REPORT ON SNELLING/HOYT
RECONSTRUCTION PROJECT AND ORDERING PUBLIC HEARINGS
BE IT RESOLVED by the Council of the City of Falcon Heights as follows:
1. By resolution adopted January 25, 2006, the Council directed the City Engineer to prepare
preliminary reports as to the feasibility of the proposed improvements:
Hoyt Avenue and Snelling Drive (between Snelling and Hamline Avenues)
2. The City Engineer was also directed to include in the report the estimated cost of the
proposed improvements. The preliminary report and cost estimates have been submitted
and considered by the Council and are hereby approved and directed to be placed on file in
the office of the City Administrator. The improvements proposed to be made in the general
manner set forth in the report are designated as Hoyt Avenue and Snelling Drive
Reconstruction.
3. The Council shall meet at the City Hall, 2077 West Larpenteur Avenue, in said City, on
Apri126, 2006 at 7:00 p.m. for the purpose of holding a public hearing on the proposed
improvements under and pursuant to the provisions of Minnesota Statutes, Chapter 429, and
the Administrator is hereby authorized and directed to cause .notice of the time, place, and
purpose of that meeting to be published twice in the official newspaper, Roseville Review,
which publications shall be a week apart, and the second publication shall be not less than
three days before the date of the hearing.
4. The general nature, estimated cost and area proposed to be assessed for Hoyt Avenue and
Snelling Drive Reconstruction are determined to be as stated in the foregoing notice, as
fully as though the same were separately set forth and resolved herein.
Moved by: I~w 2 }.~ e j Approved:. ~.J,.
Susan L. Gehrz, Mayor
March 8, 2006
GEHRZ ~ In Favor Attested:
' ~
KUETTEL Heather M. orthingto~i'
LAMB City Administrator
• LINDSTROM March 8, 2006
TALBOT (~~~~Againnst